







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Richardson
If you own a home in Richardson, TX, and the master bath still has the fiberglass shower pan and oak-veneer vanity it came with, you already know what needs to go first. Most full bathroom remodels here land between $9,000 and $28,000, and the work starts with paperwork, not sledgehammers – reading your builder warranty and HOA architectural guidelines before anyone swings a hammer. We know the east-side streets off the President George Bush corridor and the older ranch blocks near 75080 equally well, and we quote a flat written price before work begins. Call (844) 761-8346 to schedule your free estimate.
Why Rowan Construction Group Plano Is Richardson’s Preferred Bathroom Remodeling Company

Richardson homeowners tend to research a contractor the way they research a refrigerator – reading the three-star reviews, wanting the number on the page before they call. That suits how we work. Every quote is a flat price with a written scope and written warranty, delivered before any work starts. Bring a competitor’s estimate and we’ll go through it line by line at no charge under our Free Second Opinion offer.
Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed. A live person answers the phone 24/7, and a documented photo record comes with every visit as a standard deliverable – not an upgrade you pay for. For renovations in Richardson, that record matters: when a shower surround comes out, you’ll see exactly what the waterproofing looked like underneath.
We work under The Haven Standard, and Clause 1 is the whole point – the price is written before anyone picks up a tool. No work proceeds on a change until the change order is signed. Across 4,000-plus projects since 2007, that discipline has kept jobs within a few percent of the number the customer agreed to. Your 365-Day Done Right Promise means if it’s not done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Bathroom Remodeling Services in Richardson
Full Bathroom Remodeling
A full remodel in Richardson usually means gutting to the studs and rebuilding the wet wall, subfloor and surround. In the newer 75082 homes near the Bush corridor, that often starts with a warranty read-through so your builder coverage survives the project. Full remodels run $9,000 – $28,000 depending on tile grade, fixture brand and whether the rough-in moves.
Walk-In Showers & Shower Remodeling
Walk-in shower installation is our most requested upgrade on Richardson’s east side, where a curbless tile shower with a frameless glass enclosure replaces the original molded pan. Expect $4,500 – $12,000. We check load-bearing and blocking before specifying heavier tile or glass, since builder-grade subfloors weren’t always framed for the weight.
Tub-to-Shower Conversion
Pulling a rarely used garden tub to gain a full-size shower is common in Richardson’s master suites, and it’s a plumbing-adjacent job: the drain and supply positions have to be confirmed once the tub is out. Tub-to-shower conversion typically runs $3,500 – $10,000. See our Bathroom Remodeling team for the full scope across every fixture type.
Vanities, Tile & Fixtures
Vanity installation in Richardson runs $800 – $3,000, and it’s usually the first thing owners change because the original particleboard cabinet swells at the toe kick. We set Kohler and Toto fixtures, lay tile over a proper membrane, and price selections against written allowances so nothing surprises you at the end.
Trusted Brands We Service in Richardson
Most of the fixtures and materials you’ll weigh in a Richardson bath are brands we work with often: KraftMaid and Wellborn cabinets, Cambria and Caesarstone counters, Kohler and Toto fixtures. We don’t stock parts locally – the quote prices real materials, not inflated guesswork. If you’re matching an existing vanity or want a specific tile, name it and we’ll build the allowance around it. Fast turnaround on quotes, and a written price before any work starts.
Common Bathroom Remodeling Problems We See in Richardson Homes
- Tile replaced before the warranty was read. Pulling the shower or floor tile first can void a later pan or waterproofing claim, because the assembly was altered. Read the builder warranty before demo, not after.
- Custom vanity ordered before HOA approval. Ordering a larger shower footprint or bespoke vanity before architectural review clears it forces a resubmittal and stalls the draw schedule. Approval first, order second.
- Builder-grade subfloor asked to carry more. A heavier tile or a frameless glass enclosure adds load the original framing may not have been planned for. Check blocking and load-bearing before specifying either.
- Clay-soil movement under the slab. North Texas clay shrinks and swells with the wet-dry cycle, and older Richardson baths sometimes show hairline cracks in floor tile where the slab has moved. We look at the substrate before laying anything new.
Pricing for Bathroom Remodeling in Richardson, TX
Here’s what bathroom work actually costs in Richardson, priced to the job rather than to a brochure. The range you land in depends on tile grade, fixture brand, whether the rough-in moves, and how much framing is exposed once the old surround comes out. Every one of these is a flat written price after we’ve seen the room, and changes only move forward on a signed change order.
| Service | Typical Richardson Range |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
See the difference
Before
After
Before
After
Before
AfterThe East-Side Difference: Warranty and HOA Before Demo
Richardson’s newer 75082 homes along the Bush corridor are largely builder-spec, which flips the usual order of a remodel. Here the first real decision isn’t tile – it’s which finishes you can change without voiding a builder warranty, and which need architectural review approval from your HOA. Get that sequence wrong and a claim you were counting on can be denied, or a custom vanity can arrive before the paperwork clears and stall the whole draw schedule. We treat the warranty read-through and the HOA submittal as the first line items, not the last.
The typical job looks like this. In a builder-grade Richardson bathroom, the first failures are usually a fiberglass or acrylic shower pan that flexes underfoot and a vanity cabinet whose particleboard swells at the toe kick – both traceable to spec-level moisture exposure rather than installation error. A qualified local pro reads the builder warranty and HOA guidelines before demo, then verifies the rough-in and subfloor once the surround is out, since a pan replacement often reveals whether the waterproofing was done to code or just to the minimum. From there it becomes a normal scope: tile and fixtures against written allowances, any framing changes priced as a change order, and a punch list closed after inspection sign-off. This is the kind of redevelopment-and-detail work that defines Richardson more than the new-build subdivisions up in McKinney or Frisco.
The sub-services that come up most on our Richardson jobs are walk-in shower installation, bathroom vanity installation, and tub-to-shower conversion. If you’re also weighing other trades, our written-price discipline runs across every one of them – from the paver and concrete work using Oldcastle and Quikrete materials out front to an Abodu-style ADU out back. Same Clause 1, same signed change orders.
We Also Serve Cities Near Richardson
Richardson sits close to a handful of other North Texas suburbs, and we take bathroom remodeling work in Plano, Garland, Murphy and Sachse as well. If you’re near the Plano border on the west side or out toward Murphy to the east, the same written-price, signed-change-order process applies. Call (844) 761-8346 to check scheduling for your address.
Serving Richardson, TX – Our Local Coverage Area
We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Bathroom Remodeling in Richardson
It can, if you alter a covered assembly before reading the warranty – so we read it first, before demo. Replacing finishes like a vanity or tile often stays within coverage, but touching the waterproofing pan or structural framing can void a specific claim. We map what’s covered against the scope before work starts; call (844) 761-8346 for a free estimate and a warranty read-through.
Usually yes, for anything visible from outside or that changes the footprint, and we treat architectural review as a first step. Interior finish swaps often don’t trigger review, but a larger shower footprint or added window does. We help you submit before ordering fixtures so nothing arrives ahead of approval; call (844) 761-8346 to talk through your HOA’s process.
A tub-to-shower conversion in Richardson typically runs $3,500 – $10,000, depending on tile grade, glass and whether the drain moves. The old tub comes out, the drain and supply are confirmed, and the new pan and surround go in against a written allowance. Call (844) 761-8346 for an exact quote – estimates are free.
Builder-grade shower pans and surrounds fail early mostly because of spec-level moisture exposure, not installation error – a thin acrylic pan that flexes underfoot and a surround sealed to the minimum will show wear within a handful of years. The east-side 75082 stock is full of them. The fix is a proper waterproofing membrane and a solid pan base; call (844) 761-8346 for a free assessment.
Permits depend on scope – cosmetic finish swaps often don’t need one, while moving plumbing, the wet wall or structural framing typically does. We pull the permits and pass the inspections as part of the written scope, so the sign-off is documented before the punch list closes. Call (844) 761-8346 to confirm what your specific project needs.
Get Your Written Price Before Any Work Starts

Whether you’re in a builder-spec home off the Bush corridor or an older ranch near 75080, the first move is the same: get the number in writing. Call (844) 761-8346 to schedule your free estimate for bathroom remodeling in Richardson. You’ll get a flat written price, a written scope, a documented photo record, and the 365-Day Done Right Promise behind the work.
Written by the team at Rowan Construction Group Plano.












