A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Home Additions & ADU · Richardson, TX

Home Additions & ADU in Richardson - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
A new bay window with a cushioned seat
A new wood side gate with black hardware
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Home Additions & ADU Across Richardson

If you own a home in Richardson and the lot is fixed but the house isn’t working anymore, an addition or ADU is the move. We build both across 75080, 75081, and 75082, from garage conversions in the older post-war blocks to rear additions in the newer east-side subdivisions near the President George Bush corridor. We know Richardson’s permitting desk, its clay soils, and its HOA review boards. Call (844) 761-8346 to schedule a free estimate and get a written price before anything is ordered.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Richardson’s Preferred Home Additions & ADU Company

A remodeled family room with new windows and a window seat

Richardson homeowners research contractors the way they research appliances. They read the three-star reviews, and they want a number on the page before they call. That fits how we work: under Clause 1 of The Haven Standard, the price is written before anyone picks up a tool, on every trade we run. Every project comes with a documented photo record on each visit, background-checked and uniformed technicians, and a live person answering the phone around the clock.

The additions that hold up in Richardson get their scope settled early. We walk the attic, the subfloor, and the existing foundation before we quote, because the slab and drain conditions under these 1960s and 1970s ranches tell you more about the real cost than any finish schedule. Bring a competitor’s written estimate and we’ll review it line by line at no charge.

Our technicians have up to 19 years of experience, and every written quote carries a flat price, a written scope, and the 365-Day Done Right Promise printed on it.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Home Additions & ADU Services in Richardson

Most of the work we price in Richardson splits into four jobs. The right one depends on your lot, your HOA, and how much of the existing house you’re willing to touch.

ADU Design & Permitting

An ADU (accessory dwelling unit) needs a design that clears plan review the first time. In Richardson that means an engineer’s foundation design suited to shrink-swell clay, a utility plan showing how you’ll extend water, sewer, and power, and a submission packet the city can actually process. We handle the drawing set and the permit run together so the schedule holds. Design and permit work typically runs a few weeks before framing starts.

ADU Design & Permitting

Garage Conversion ADU

The cheapest square footage on a Richardson lot is usually already attached to the house. A garage conversion turns an existing slab and envelope into living space, which is why it prices lower than a detached unit. Garage Conversion in Richardson runs $30,000 – $80,000 and hinges on insulation, a new heating and cooling setup, plumbing rough-in if you want a kitchenette or bath, and making sure the conversion doesn’t quietly break the remaining builder warranty on a newer 75082 home. We check that before we cut anything.

Garage Conversion ADU

New Detached ADU

A detached ADU is a small house with its own foundation, utilities, and envelope, so it carries small-house pricing. ADU Construction in Richardson runs $90,000 – $220,000. The range swings on site work: running a new sewer lateral, adding an electrical meter, and engineering a post-tension slab over clay that has moved since the lot was graded. On a build-out suburb like Richardson, the setbacks and lot coverage rules decide whether a detached unit fits at all, so we check the plat before you commit to a design.

New Detached ADU

Junior ADU & Interior Conversion

If you want separate living space without a separate building, an interior conversion reworks part of the existing house: a bedroom suite with its own entry, a kitchenette, or a converted utility room. It’s the lowest-cost path and often the fastest through permitting, since you’re not adding a footprint. We map the plumbing and electrical you already have before drawing the layout, which keeps the work inside the walls you can afford to open.

For the full menu, including room additions, second-story additions, and sunrooms, see our Home Additions & ADU page.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Richardson

Good ADUs and additions are built from named materials, not adjectives. We source from fifty-plus vetted brands, so the written quote shows real products: Quikrete and Sakrete for the concrete and grout that tie a new slab or pier system into the existing foundation, and Abodu where a prefab detached ADU is the right answer for the lot. For an interior finish schedule on a Junior ADU, KraftMaid and Wellborn cabinets and Cambria counters give the quote honest numbers. Name the product on the page and the customer can check it. Call (844) 761-8346 for a written, line-item estimate.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Home Additions & ADU Problems We See in Richardson Homes

Richardson’s construction story is redevelopment. The suburbs here are built out, so additions happen on lots that already have a house, a driveway, and a foundation that has been settling since the original pour. Four problems come up again and again:

  • Clay soil that has already moved. North Texas clay shrinks and swells through the wet-dry cycle, and the slab under a 1960s ranch may have been re-leveled once already. A new addition has to be engineered to meet the existing foundation where it actually sits, not where the drawings assume it sits.
  • The hidden cast-iron sewer line. In older 75080 and 75081 blocks, the pattern is a homeowner planning a modest addition who finds the original cast-iron drain line failing under the slab. The plumbing scope, not the framing, becomes the real cost.
  • Framing before HOA approval. In the master-planned east-side subdivisions, starting work before the architectural-review committee signs off can force a rebuild of an exterior elevation. The submission has to come first.
  • Additions that void a builder warranty. Touching the builder’s structural or envelope work on a newer home can void the remaining warranty on the original house. We read the warranty terms before we scope the tie-in.

Pricing for Home Additions & ADU in Richardson, TX

A framer checking new wall framing on a home addition

Home Addition work in Richardson runs $45,000 – $130,000, and ADU Construction runs $90,000 – $220,000. Where you land in that range depends on foundation engineering, utility rough-in, and how much of the existing house has to open up. We put a flat price and a written scope in front of you before work starts, and no change proceeds until you sign a change order. Here’s how the common items price in Richardson’s market:

Service Richardson Price Range
Home Addition $45,000 – $130,000
ADU Construction $90,000 – $220,000
Garage Conversion $30,000 – $80,000
Kitchen Remodel $14,000 – $45,000
Bathroom Remodel $9,000 – $28,000
Window Replacement $4,500 – $15,000

Those numbers are the same ones we put on the written estimate, because the quote is a flat price with a written scope and a written warranty. Call (844) 761-8346 to schedule your free estimate. Estimates are free, and a written second opinion on a competitor’s quote costs nothing.

We Also Serve Cities Near Richardson

We also build Home Additions & ADU in Richardson and the cities around it: Plano, Garland, Murphy, and Sachse. Each has its own permit desk, its own clay-soil quirks, and its own HOA rules, and we price each one on its own terms. If you’re just over the Richardson line, call (844) 761-8346 and we’ll tell you what applies where you live.

Serving Richardson, TX – Our Local Coverage Area

We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Home Additions & ADU in Richardson

A remodeled primary bathroom with a soaking tub and walk-in shower

Why Richardson Chooses Rowan Construction Group Plano

We set the standard for home additions & ADU in Richardson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Richardson

Getting your home additions & ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your home additions & ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home additions & ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richardson Customers Say

Trusted by homeowners across Richardson and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinets

More services in Richardson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Additions & ADU in Richardson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Richardson.

(844) 761-8346

Request a Free Estimate in Richardson

Tell us about your home additions & ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch