A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Home Additions & ADU · Rowlett, TX

Home Additions & ADU in Rowlett - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Home Additions & ADU Across Rowlett

Home additions and ADUs in Rowlett typically run $45,000 to $130,000 for a room addition and $90,000 to $220,000 for a full detached ADU, with garage conversions landing between $30,000 and $80,000. We’re a construction contractor that connects Rowlett homeowners with independent local professionals who build, permit, and inspect the work, and we put the number in writing before anyone picks up a tool. If you’re on a Lake Ray Hubbard shoreline lot, the drainage and floodplain questions change the scope, and we plan for that up front.

Call (844) 761-8346

Call (844) 761-8346 to schedule your free estimate.

Why Rowan Construction Group Plano Is Rowlett’s Preferred Home Additions & ADU Company

A second-story addition that matches the existing roofline

Rowlett is a shoreline suburb that was mostly built out between the 1980s and the 2000s, so the work here is addition and renovation on 20- to 40-year-old brick-veneer homes, not ground-up subdivision building. That changes what a proper addition looks like: we tie new framing into existing slab edges on expansive clay, match brick and stone facades that have weathered three decades of North Texas sun, and confirm which walls actually carry load before a plan goes to the engineer.

Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed before they arrive. Under Clause 1 of the Haven Standard, the price is written before anyone starts, and no change proceeds until the change order is signed – the discipline that has kept our projects within a few percent of the agreed number across 4,000-plus jobs. Every visit includes a documented photo record as a standard deliverable. You get a written scope, a written warranty, and the 365-Day Done Right Promise behind the work. We also offer a free second opinion on any written estimate you’ve already received, reviewed line by line at no charge.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Home Additions & ADU Services in Rowlett

The Home Additions & ADU team handles the full range of Rowlett work, from a single room addition to a detached backyard unit. The three services called for most often in Rowlett are a new detached ADU, a room addition, and a garage conversion ADU.

New Detached ADU in Rowlett

A detached ADU is the biggest build in this mix, and on a Rowlett shoreline or low-lying lot it’s where floodplain and drainage review bite hardest. The scope has to itemize site prep, utilities stubbed from the main house, and the wind-rated shell that North Texas storm standards require – anything left out of the written quote turns into a change order later. Prefabricated shells from makers like Dvele and Plant Prefab can shorten the on-site framing window, but the foundation, utilities, and inspection sequence still have to be planned for this specific lot.

New Detached ADU in Rowlett

Garage Conversion ADU in Rowlett

Most Rowlett homes have an attached garage on slab, which makes a conversion the least expensive path to an ADU at $30,000 to $80,000. The work turns on the slab itself, on separating the unit’s plumbing and electrical from the house, and on bringing the converted space up to code for habitation. An engineer confirms how the existing slab and subfloor carry the new load on clay that swells and shrinks with every wet-dry cycle.

Garage Conversion ADU in Rowlett

Room Additions in Rowlett

A room addition at $45,000 to $130,000 covers everything from a primary suite bump-out to a second-story addition. On a 1980s slab-and-brick Rowlett home, the first step is confirming which walls are load-bearing and how the existing slab edge carries new load. Then the shell goes up wind-rated and brick-matched so it passes inspection sign-off before the walls close.

Room Additions in Rowlett

ADU Design & Permitting, Junior ADU & Interior Conversion

Design and permitting run ahead of construction on every one of these jobs: engineer-stamped load-bearing plans, permits, and the inspection sequence are part of a compliant quote, not an add-on. Junior ADUs and interior conversions are the smaller end of the range and often suit a Rowlett home that already has an underused den or an oversized utility room.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Rowlett

Sourcing runs across fifty-plus vetted brands, and for ADU and addition work we draw on systems from Dvele, Plant Prefab, and Mighty Buildings where a prefabricated shell shortens the on-site window. We don’t stock parts or keep a yard of materials in Rowlett – the independent professionals who do the work source what each job’s written scope calls for, at the spec the engineer and inspector require. The point of naming brands is honest numbers in the quote, not a logo wall.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Home Additions & ADU Problems We See in Rowlett Homes

  • Framing that fails the wind-load check. A detached ADU or second-story addition framed and sheathed without the roof-to-wall tie-downs North Texas storm ratings call for fails framing inspection. The fix is in the plan set and the hardware schedule, not a field workaround.
  • A shoreline lot permitted without drainage or floodplain review. On a Lake Ray Hubbard-area lot, a new slab and subfloor can heave and pond after a hard rain when drainage wasn’t engineered up front. Inland tract homes a mile west never trigger this, which is why it catches some builders out.
  • The cheap bid that omits the hard parts. A low bid often drops engineer-stamped load-bearing plans, permits, and inspection sign-off, then surfaces those costs later as change orders. The written price should include all three from the start.
  • Slab movement on expansive clay. Rowlett’s clay soils swell and shrink with wet-dry cycles, so an addition has to be tied to a slab edge that will actually hold. We engineer the connection rather than guess at it.

Pricing for Home Additions & ADU in Rowlett, TX

A framer checking new wall framing on a home addition

Every project gets a flat written price with a written scope before work begins, and here’s what that looks like in Rowlett dollars. A detached ADU on a shoreline or low-lying lot adds drainage and floodplain review to the scope, which is why the itemized allowances matter.

Service Rowlett price range
Home Addition $45,000-$130,000
ADU Construction $90,000-$220,000
Garage Conversion $30,000-$80,000

What moves the number: lot conditions (floodplain and drainage review on shoreline property), engineer-stamped plans, utility runs, prefab versus stick-built shell, and finish level. Call (844) 761-8346 for an exact quote – estimates are free, and a written price comes before any work starts.

We Also Serve Cities Near Rowlett

Our professionals also take on Rowlett and the surrounding area, including Sachse, Garland, Wylie, and Rockwall. If you’re just over a Rowlett line and closer to one of those cities, the same written-price process applies. Call (844) 761-8346 and we’ll set the estimate.

Serving Rowlett, TX – Our Local Coverage Area

We serve Rowlett and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Home Additions & ADU in Rowlett

New architectural shingles with a clean valley

Why Rowlett Chooses Rowan Construction Group Plano

We set the standard for home additions & ADU in Rowlett.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Rowlett

Getting your home additions & ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your home additions & ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home additions & ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Rowlett Customers Say

Trusted by homeowners across Rowlett and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roof

More services in Rowlett

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Additions & ADU in Rowlett?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Rowlett.

(844) 761-8346

Request a Free Estimate in Rowlett

Tell us about your home additions & ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch