A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Home Additions & ADU · Wylie, TX

Home Additions & ADU in Wylie - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Home Additions & ADU Across Wylie

If you’re planning an addition or an ADU on a Wylie lot, the number you need first is a written price, not a sales pitch. Wylie additions and accessory dwelling units here typically run $45,000 – $130,000 for a home addition and $90,000 – $220,000 for a ground-up ADU, and the biggest cost drivers are the soil under the slab, the county permitting path, and how far the build sits from the road. We know this ground well: slab-on-grade homes on former Blackland Prairie farmland, acreage lots where grading is minimal and material access is a real line item, and the Collin County inspection rhythm that out-of-town builders underestimate. Call (844) 761-8346 to schedule your free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Wylie’s Preferred Home Additions & ADU Company

A garage converted into a guest room and home office

Wylie homeowners research the way they buy appliances. They read the three-star reviews, they want the price range visible before they pick up the phone, and they notice when a contractor can’t put a scope in writing. That’s the whole reason our process leads with a flat written price and a written scope before anyone touches a shovel.

We work in Wylie (ZIP 75098) and the surrounding Collin County corridor, and the local feedback we hear most often is about documentation: the photo record on every visit, the signed change order before any change proceeds, the written warranty at closeout. Under Clause 1 of The Haven Standard, the price is written before anyone starts. Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed. Calls are answered by a live person around the clock. Response to Wylie is coordinated directly with the independent local professionals doing the work on your lot, so scheduling reflects your lot, not a distant dispatch board. When you’re comparing bids, ask for a free second opinion: bring a competitor’s written estimate and we’ll review it line by line at no charge.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Home Additions & ADU Services in Wylie

Wylie ADU and addition work splits into a few distinct scopes, and each one prices differently. Here’s how we approach the four you’ll most often need, plus the site work that sits underneath all of them. For the full picture across trades, see our Home Additions & ADU team.

New Detached ADU

A new detached ADU is a full second dwelling on your lot: foundation, framing, roof, utilities, finishes. On Wylie’s east-side subdivisions, the ground under that slab is often former farmland graded over expansive clay, so the foundation design is the first decision, not an afterthought. We scope pier-and-beam remediation or a post-tension slab up front, and we design drainage to move water away from the structure.

New Detached ADU

ADU Site Prep & Utilities

Site prep is where acreage lots in Wylie differ most from a tight subdivision lot. Long material hauls, equipment access, grading and drainage on an open parcel, and the utility runs from the main house or the street all land in this line. We price them as separate line items so you can see exactly what the lot is asking for.

ADU Site Prep & Utilities

Garage Conversion ADU

Converting an existing garage into a junior ADU or rental unit is the lower-cost path, often in the $30,000 – $80,000 range for a garage conversion. In Wylie’s brick-veneer slab homes, the work is mostly interior: insulation, egress, plumbing tie-ins, and the door and slab details that keep moisture out. It’s a good fit where you want the space without a new foundation.

Garage Conversion ADU

Room Additions

A room addition shares the same foundation reality as a detached ADU, plus the tie-in to the existing structure, roofline, and HVAC. Because most Wylie homes are 1990s-to-2020s construction, this is usually a first addition rather than a renovation of older stock. We scope the tie-in details and the soil approach before quoting a flat price.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Wylie

Material choice drives a real share of the number on a Wylie addition. We specify from vetted brands where the spec calls for hardscape, fencing, or outdoor structure work, and we name them in the written quote so the price is honest rather than padded. Belgard and Unilock pavers hold up well to North Texas clay movement and spring storm cycles, and ActiveYards fencing gives a clean, consistent line on an open lot. For enclosed patios and sunrooms, the envelope details matter more than the brand name. We don’t stock parts locally and we don’t claim to; we specify, source, and coordinate delivery to your Wylie lot, which keeps turnaround tied to your schedule rather than a warehouse.

Common Home Additions & ADU Problems We See in Wylie Homes

  • Skipping a soil test on former farmland. Lots across Wylie’s newer east-side subdivisions were graded over Blackland Prairie clay, and without a soil test the slab is a guess. The first wet-dry cycle tells the truth, and it’s expensive.
  • Underestimating septic and well setbacks on acreage. On unincorporated parcels near Wylie, the setbacks often force a redesign if they aren’t mapped before layout. That turns into a change order if nobody scoped it first.
  • Bringing a big-city permitting mindset. Wylie still has a small-town permitting and inspection culture even with explosive subdivision growth, and Collin County expectations on unincorporated acreage are their own rhythm. Missing them delays sign-off.
  • Poor grading and drainage on open lots. On acreage where grading is minimal, water needs a designed path away from the foundation. Without it, you get foundation movement after the first dry summer.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Home Additions & ADU in Wylie, TX

A framer checking new wall framing on a home addition

Here’s what Wylie additions and ADUs cost, in real dollars. A home addition typically runs $45,000 – $130,000, ADU construction runs $90,000 – $220,000, and a garage conversion runs $30,000 – $80,000. What moves you within those ranges: the foundation approach (post-tension slab versus pier-and-beam remediation), the septic and well setbacks on your parcel, the length of the material haul, and whether the permitting path runs through the city or Collin County.

Service Typical Wylie price range
Home Addition $45,000 – $130,000
ADU Construction $90,000 – $220,000
Garage Conversion $30,000 – $80,000

Every job gets a flat written price with a written scope and a written warranty before work starts. No change proceeds without a signed change order, which is what keeps projects within a few percent of the agreed cost. Call (844) 761-8346 for an exact quote; estimates are free.

We Also Serve Cities Near Wylie

The same Collin County ground, permits, and soil concerns show up in the towns around here, and we coordinate work across the corridor for homeowners comparing options. Along with Home Additions & ADU in Wylie, we work in Sachse, Murphy, Rowlett, and Fairview, each with its own lot and permitting particulars. If your project sits near a city line, we’ll confirm which jurisdiction governs the permit before quoting.

Serving Wylie, TX – Our Local Coverage Area

We serve Wylie and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Home Additions & ADU in Wylie

A new front entry door with glass sidelights

Get Your Written Price Before Anyone Picks Up a Tool

Wylie ADUs and additions come down to the ground you’re building on and the paperwork that governs it, and both belong in the number before work starts. Every project gets a flat written price, a written scope, a written warranty, and the 365-Day Done Right Promise: if it isn’t done right, we make it right. That’s backed by The Haven Standard, not a handshake. Call (844) 761-8346 for your free estimate, or bring a competitor’s written quote and we’ll review it line by line at no charge.

Written by the team at Rowan Construction Group Plano.

Why Wylie Chooses Rowan Construction Group Plano

We set the standard for home additions & ADU in Wylie.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Wylie

Getting your home additions & ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your home additions & ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home additions & ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Wylie Customers Say

Trusted by homeowners across Wylie and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in niche

More services in Wylie

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Additions & ADU in Wylie?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Wylie.

(844) 761-8346

Request a Free Estimate in Wylie

Tell us about your home additions & ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch