







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does Tub-to-Shower Conversion Cost in Plano?
A tub-to-shower conversion in Plano typically costs $3,500 to $10,000. A straightforward alcove swap with a prefabricated pan and tile walls lands closer to $3,500 to $5,500, while a custom-tiled walk-in shower with a bench, niche, and frameless glass runs $6,500 to $10,000. The single biggest swing in that range is the substrate: what we find under the old tub once it’s out.
Every quote from Rowan Construction Group is a flat written price with a written scope before anyone picks up a tool. Under Clause 1 of The Haven Standard, you see the number before the work starts – not after. That’s the whole point of how we build.
Key Takeaways
- Tub-to-shower conversions in Plano run $3,500 to $10,000 in 2026, depending on tile, glass, and what’s under the tub.
- The tub removal and haul-away is the small line. Waterproofing and plumbing relocation are the two that move the price.
- Plano’s slab-on-grade homes and hard North Texas water change what we spec – more on that below.
- Written price before work starts, 365-Day Done Right Promise, and a documented photo record on every visit.

Tub-to-Shower Conversion Cost Breakdown (2026)
Here’s how the total breaks down into line items. These are the ranges we’ve been quoting in Plano this year. Your number depends on the line items that apply to your bathroom, not a single blended guess.
| Line Item | Price Range | What It Covers |
|---|---|---|
| Tub removal and haul-away | $250 – $650 | Cutting out the old tub, protecting the floor, disposal |
| Shower pan / base | $400 – $1,800 | Prefab acrylic pan to custom mud-set tile base |
| Waterproofing membrane | $350 – $1,200 | Schluter-KERDI or equivalent bonded membrane, liquid-applied, or cement board plus vapor barrier |
| Wall tile (supply and install) | $900 – $3,500 | Ceramic to porcelain to natural stone; standard field tile vs. mosaic accent |
| Plumbing rough-in and valve | $450 – $1,600 | Relocating the drain, new mixing valve, shower trim |
| Shower door / glass | $400 – $2,200 | Framed sliding to frameless 3/8″ tempered |
| Bench, niche, and accessories | $250 – $1,400 | Tile-ready bench, recessed niche, grab bar blocking |
| Finish trim and caulk | $150 – $450 | Threshold, corner trim, silicone at transitions |
| Permit (Plano) | $150 – $450 | Plumbing permit where the drain moves; varies with valuation |
| Fully installed total | $3,500 – $10,000 | Turnkey, with written scope and warranty |
Tile is the line item people most often underestimate. A $3,500 conversion and a $9,500 conversion can be the same footprint, the same plumbing, and the same door – the difference is standard ceramic field tile versus large-format porcelain with a linear drain, a tile-ready bench, and a frameless panel. We name the tile brand and the membrane brand on the written quote so you can compare quotes line against line.
What Affects Tub-to-Shower Conversion Pricing in Plano
- What’s under the tub. Plano bathrooms built in the 1980s through the 2000s sit on slab-on-grade foundations. When we pull the tub and find a drain line offset into the wall or a flange that was set with no waterproofing behind it, the substrate work climbs. In older Plano neighborhoods like Willow Bend and Deerfield we regularly see tub flanges bedded directly against drywall with no barrier – that’s a $500 – $1,200 line to correct before tile goes up.
- Hard water and the fixtures you choose. Plano’s water runs hard, and that matters for what we spec. Standard chrome cartridges and unsealed limestone or travertine take a beating in a shower with a daily 10-minute flow. We steer most Plano homeowners toward matte-black or brushed-nickel trims and porcelain instead of stone tile unless the customer wants the sealing schedule that stone demands.
- Frameless vs. framed glass. A frameless 3/8″ tempered glass panel adds $800 – $1,500 over a basic framed door. In a Plano bathroom where the shower sits on an outside wall and gets a lot of natural light, the difference in how the room reads is significant.
- Drain location and code. If the old tub drain empties through the slab in the exact spot where a shower drain can land, the plumbing line item stays low. If the drain has to move to center the pan, or if it sits too close to a joist or a slab penetration, the line climbs. Plano plumbing permits are required whenever the drain relocates.
- Walls and tile layout. A three-wall alcove is the cheapest configuration – one tile field, one pan, one door. A corner or curbless walk-in built into a larger bathroom adds framing, waterproofing, and labor. Curbless also means a recessed slab or a curb block, and that’s a $600 – $1,800 line that doesn’t show up on a standard quote.
- Accessibility additions. Grab-bar blocking, a folding bench, a hand-held sprayer on a slide bar, and a low curb push a standard conversion toward the top of the range. Worth it if a family member will use the shower as they age, and it’s cheaper to block for it now than to retrofit later.
Those six factors are the ones that move a Plano tub-to-shower conversion up or down the $3,500 to $10,000 range. Everything else – how many boxes of tile, how much thinset, how many hours – flows from them. If you want the general bathroom-remodel framing before we drill into the shower specifically, start at our home page, which lays out how we scope every trade.

How to Save on Tub-to-Shower Conversion
There are real ways to keep a Plano conversion toward the lower end of the range without cutting the parts that keep water where it belongs.
- Keep the tub drain where it is. If the existing drain can center under a standard 32″ x 60″ pan without moving, you save $400 – $900 in plumbing and slab work. We check this before we quote – it costs nothing to check and it’s the single biggest lever.
- Choose your tile before you choose your contractor. A porcelain field tile at $4 to $8 per square foot performs as well in a Plano shower as a $14 stone tile and skips the seasonal sealing schedule. Name the tile on the quote and the number stops moving.
- Skip the frameless glass on the first pass. A sem-frameless or framed door gets the same waterproofing behind it. Upgrade the door later if the budget allows; upgrade the membrane never.
- Bundle a vanity or flooring with the conversion. A tub-to-shower conversion and bathroom vanity installation run side by side, share demo and permit, and come out under the sum of two separate jobs. If more of the bathroom is dated, this is where the money goes furthest.
- Get a second opinion on any written estimate – ours included. Rowan offers a Free Second Opinion on any written estimate: bring a competitor’s quote and we’ll review it line by line at no charge. The point isn’t to win the job; it’s to make sure the membrane and the plumbing are actually in the number.
Book a free estimate at (844) 761-8346 and you’ll get a written price with the scope spelled out – tile, membrane, glass, permit, and warranty – before work begins. No “call for a quote” round trip. If you’re comparing us to other contractors and want to see how conversions fit into larger Plano service area projects, that page covers what we do here.
Questions You’ll Ask Before You Sign
These are the four questions that come up most on the first visit. The short answers, then what’s behind them.
Do I need a permit for a tub-to-shower conversion in Plano?
Yes, when the drain moves. If the shower reuses the existing tub drain location and only the finish changes, most Plano conversions proceed without a plumbing permit, though an inspection may still be requested by the city. If the drain relocates or the valve is replaced, a plumbing permit is pulled and inspected. We carry the permit line as a separate item on the written quote so you can see it.
How long does the conversion take?
Three to five working days for a standard alcove conversion, longer if the substrate needs repair or the tile is a large-format porcelain that needs a full curing window. We post the schedule on the written scope and give you a daily window – a live person answers our phone 24/7, and we text a confirmation the night before each visit.
What’s the difference between a tub-to-shower conversion and a full bathroom remodel?
A tub-to-shower conversion is a shower-specific scope: tub out, pan and drain sorted, walls waterproofed and tiled, door hung. A full bathroom remodel typically adds vanity, flooring, lighting, mirror, and fixtures, and runs $9,000 to $28,000 in Plano – our Bathroom Remodeling in Plano page lays out that range. If your shower is the only failing piece, the conversion is the honest number.
Can I see how much a walk-in shower costs on its own?
Yes. A walk-in shower installation in Plano runs $4,500 to $12,000 – see our Walk-In Shower Installation in Plano guide for the line-by-line. The conversion page is the swap; the walk-in page is the from-scratch version. And if you’re weighing one against a smaller project, our Small Bathroom Remodel in Plano page covers the tight-footprint math.
Is it cheaper to repair or replace a failing tub?
Usually replace – replace the tub with a shower. A tub refinish runs $400 to $800 in Plano and buys you three to five years before the finish fails again, and it doesn’t fix a slow drain or a bad valve. If the tub itself is sound and the issue is only the surround, a shower replacement at $3,000 to $8,500 may be the better line – see our Shower Replacement in Plano guide. If the tub is dated, cracked, or the drain is slow, the conversion is the number that stops the problem.
What the Written Quote Should Include
Any tub-to-shower conversion quote you receive in Plano should list, at a minimum: the tile brand and SKU, the waterproofing membrane brand and system, the shower pan type and dimensions, the drain model and finish, the valve and trim brand (Kohler and Toto are the two we spec most often, and both are named on the quote), the glass specification and thickness, the permit line, the warranty language, and the payment schedule. If a quote has less than that, it’s a number without a scope.
We hand you the quote in writing before work starts. No change proceeds until the change order is signed – that’s the discipline that kept our projects within a few percent of the agreed cost across 4,000-plus jobs. Every visit gets a documented photo record as standard: you see the substrate, the membrane, the drain flange, and the finished tile, in order, whether or not you’re home. Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed before they knock.
The 365-Day Done Right Promise backs every conversion: if it isn’t done right, we make it right. That guarantee is printed on the quote, backed by a terms page, not an asterisk. And if you’re weighing the conversion against a vanity upgrade, our Bathroom Vanity Installation in Plano guide covers that line item, which bundles well with the shower work.
Where the Price Goes Up Fast (and Where It Stays Flat)
A quick map of the decisions that move the number, based on what we see in Plano homes.
- Stays flat: existing drain location, standard alcove footprint, porcelain field tile, framed or semi-frameless glass, standard valve – this is the $3,500 to $5,500 conversion.
- Moves modestly: natural stone tile, frameless glass panel, tile-ready bench and niche, blocking for a future grab bar – the $5,500 to $7,500 band.
- Moves hard: curbless design, large-format tile with linear drain, substrate repair found after demo, drain relocation through slab – the $7,500 to $10,000 band.
The honest way to think about it: most Plano conversions land between $5,000 and $7,500 once a homeowner sees the tile and glass options in person. The $3,500 floor is a real number for a simple alcove with standard finishes. The $10,000 ceiling is real too for a custom walk-in with a bench and stone. Call (844) 761-8346 and we’ll tell you which band your bathroom falls into on the first visit, in writing, before anything is demoed.
FAQ – Tub-to-Shower Conversion Cost in Plano
How much does a tub-to-shower conversion cost in Plano?
$3,500 to $10,000 for a fully installed conversion in 2026, with most Plano homeowners landing between $5,000 and $7,500. The total depends on the shower pan, the tile, the glass, and what’s under the old tub. Call (844) 761-8346 for an exact written quote – the estimate is free.
What’s the cheapest tub-to-shower conversion in Plano?
About $3,500, for a standard three-wall alcove with a prefabricated pan, porcelain field tile, a basic framed door, and the existing drain reuse. Below that number, something in the scope is being skipped – usually the waterproofing membrane or the permit. Call (844) 761-8346 to see where your bathroom lands.
How much more does a curbless or walk-in shower add?
A curbless design adds $600 to $1,800 over a standard curb, and a full walk-in shower install (from scratch, no existing shower) runs $4,500 to $12,000 in Plano. Either is within the $10,000 top of the conversion range if you keep the tile standard. Call (844) 761-8346 for a written line-by-line.
Can you fix a leaking shower pan or a cracked tile the same day?
We can diagnose it the same day in most Plano cases, and we carry the materials to stop an active leak. A full pan replacement is a scheduled job – typically one full working day, plus a cure window before tile goes back. Call (844) 761-8346 and we’ll confirm the window when we book.
Does the price include the shower door and tile?
Yes, when the quote is written the way ours is. The $3,500 to $10,000 range covers tile, membrane, pan, drain, valve, door, permit, and installation – the door and tile are not add-ons left off the front number. Every line is named on the written quote. Call (844) 761-8346 if you want to review a quote line by line first.
Related Guides for Plano Homeowners
If the shower is one part of a larger bathroom or home project, these are the guides that pair with this one:
- Shower Replacement in Plano – when the tub is fine but the surround isn’t
- Walk-In Shower Installation in Plano – from-scratch walk-in, curbless and bench options
- Bathroom Remodeling in Plano – full bathroom scope with vanity, floor, and lighting
- Small Bathroom Remodel in Plano – tight-footprint projects, same range logic
- Bathroom Vanity Installation in Plano – bundles well with a conversion
And if a Plano conversion turns out to be a piece of a wider home project – a new roof, a fence for the backyard, an ADU over the garage – our related guides cover those trades with the same written-price discipline. See Roof Replacement in Plano, Vinyl Fence Installation in Plano, and ADU Construction in Plano for the numbers on those scopes.
Get a Written Tub-to-Shower Conversion Price for Your Plano Home
Best way to know what your conversion costs is to put the scope on paper. We come out, measure the bathroom, check the drain and the substrate, and hand you a written, flat-priced quote – tile brand, membrane brand, glass spec, permit line, and warranty language all named. Under the 365-Day Done Right Promise, if it isn’t done right, we make it right. Our crews are background-checked and uniformed, a live person answers our phone 24/7, and every visit includes a documented photo record as standard. Call (844) 761-8346 for a free estimate, or bring a competitor’s quote and we’ll review it line by line at no charge before you decide. Free estimate, written price before any work starts, and a number you can screenshot and compare – that’s the standard.
Pricing reflects the Plano market as of 2026. Rowan Construction Group Plano offers free estimates – call (844) 761-8346.
What Our Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O.












