A Rowan company - serving Plano, TX
A new herringbone paver driveway
Driveway & Pavers · Plano, TX

Driveway & Pavers in Plano - Free Measure, Itemized Written Quote

Free on-site measure and a written price per square foot before we book you in. Proper base preparation and sealed edges, because a cheap base is why driveways crack.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A new concrete driveway with a paver border
A new paver patio with a seat wall and fire pit
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Trusted Driveway & Pavers for Plano Homeowners

Most Plano driveways we look at fail for one reason: the slab was poured over black clay that expands when it rains and shrinks when it doesn’t. That movement cracks concrete, drops pavers into dips, and pulls seams apart at the garage apron. We rebuild driveways on a properly compacted, moisture-controlled base so the surface above it stays flat through Texas summers and freeze-thaw winters alike. Our technicians bring up to 19 years of experience, and our written price lands before anyone picks up a tool. Whether you need a full paver driveway or one cracked panel replaced in Willow Bend, we document what we found, show you the photos, and quote a flat number. Call (844) 761-8346 to schedule a free estimate.

Call (844) 761-8346

What Our Driveway & Pavers Service Includes

Paver Driveways

Paver driveways use individual clay or concrete units set in a compacted sand bed, which means a crack stays a crack instead of spreading across the whole slab. You need one when curb appeal matters, when a cracked concrete driveway keeps returning after patching, or when you want a surface you can pull up and reset rather than demolish. We set Belgard and Tremron pavers over a layered base, cut edges with a wet saw rather than snapping them, and leave you a photo record of the base prep before the sand goes down.

Paver Driveways

Concrete Driveways & Concrete Work

A poured concrete driveway is the standard choice across Plano subdivisions like Deerfield and Russell Creek, and it comes down to how the slab is reinforced and jointed. You need concrete work when your existing slab has settled, when standing water pools against the garage, or when tree roots have lifted a section into a trip hazard. We pour with rebar, control joints at the right spacing, and a proper slope away from the foundation, then pull the permits the City of Plano requires for the approach apron.

Concrete Driveways & Concrete Work

Asphalt Driveways & Resurfacing

Asphalt driveways cost less up front and handle minor movement better than concrete, which is why some Plano homeowners choose it for longer runs from the street. You need resurfacing when the surface has gone chalky, shows hairline alligator cracking, or has lost its top layer to sun and traffic. We mill or patch the failed areas first, then lay a fresh hot-mix overlay, because sealing over a cracked base just hides the problem until the next summer.

Asphalt Driveways & Resurfacing

Driveway Repair & Replacement

Repair covers spalled edges, hairline cracks, lifted panels, and drain grates that have pulled loose from the surrounding slab. Replacement makes sense when more than about a third of the surface has failed or when the base underneath has washed out. We assess the base first with a probe, tell you plainly whether a repair will hold, and quote both options so you can compare them line by line.

Patios, Walkways & Pool Decks

Patios and walkways take the same pavement build as a driveway but with different drainage demands, especially around pool decks where water has to run away from the coping. You need this work when your back patio ponds in a storm, when walkway pavers have heaved at a tree root, or when a bare builder-grade slab is the last unfinished thing on your yard. We use Belgard and Unilock pavers for patios and set pool deck surfaces with slip-resistant finishes that hold up to chlorinated splash-out and North Texas sun.

Brick Paver Driveway

Clay brick pavers give a driveway a warmer look than concrete and hold color better than stained surfaces because the pigment runs through the full unit. They suit older Plano neighborhoods where brick is part of the streetscape and the material matches what’s already on the house. We lay a compacted aggregate base, set the brick in a running or herringbone pattern, and lock the field in with edge restraint so the border stays put.

Stamped Concrete Driveway

Stamped concrete reproduces the look of stone, brick, or slate by pressing a pattern into poured concrete before it cures. It’s the middle path when you want a decorative surface without the per-unit cost of pavers, and it works well on Plano lots where the driveway is long and a paver field would run high. We seal the surface after curing and lay out a written maintenance schedule so you know when resealing is due.

Driveway Sealing

Sealing protects concrete, asphalt, and pavers from UV fade, oil staining, and the freeze-thaw cycling Plano sees a few times each winter. You need it when water stops beading on the surface or when the color has gone flat and chalky. We clean, dry, and then apply the sealer in a weather window that won’t wash it out, and we tell you the honest reseal interval for your material rather than selling it every year.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Brands We Service for Driveway & Pavers

Belgard pavers come in a wide range of shapes and colors, and the brand’s larger format units are what we reach for most on Plano driveways because fewer joints mean less sand to top up over time. We’ve worked with Belgard long enough to know which of their lines hold color under Texas sun and which ones fade toward gray after a few summers, and we tell you that before you pick a pallet.

Unilock and Tremron round out the material choices on most of our jobs. Unilock’s textured finishes work well on patios and walkways where grip matters around a pool, and Tremron’s pricing gives us a solid mid-range option when the paver driveway budget needs to stay in the $7,000 – $18,000 band without dropping to thin builder units. Whether you have Belgard, Unilock, Tremron, or any other make, we can help.

Signs You Need Driveway & Pavers Right Now

  • Hairline cracks that keep returning after patching. When a patch fails inside a year, the problem is almost always underneath the slab, not in the patch mix. A base that has settled will keep cracking the surface no matter how many times it’s filled.
  • Ponding water after a rain. Standing water in one spot of a Plano driveway signals a lost slope or a void under the slab. Left alone, that water works its way under the edge and starts lifting the surrounding pavement.
  • Pavers that have sunk or heaved. A dip in the paver field or a raised lip at the edge means the bedding sand has migrated or an edge restraint has failed. Both are fixable early and much more expensive once traffic starts breaking the units.
  • Crumbling edges and spalled garage aprons. Concrete that crumbles at the edges has usually been hit by de-icing salt or lost its air entrainment. The apron is where it starts, and it moves inward toward the slab.
  • Oil stains and UV-faded asphalt. Asphalt that has gone pale and stops beading water has lost its protective top layer. Sealing at that stage costs a few hundred dollars and buying time there beats a full overlay later.

Our Driveway & Pavers Process – Step by Step

  1. 1
    Free on-site estimate and base probe. We walk the driveway, probe the base at a few points, and photograph the drainage slope with a level. You see the findings and get a written scope with a flat price before any work is scheduled.
  2. 2
    Permits and utility locate. Plano requires a permit for the driveway approach at the curb, and we pull it and pass the inspection. We also call for utility locates so nobody hits an irrigation line or a gas stub during demo.
  3. 3
    Demolition and base prep. The old surface comes out, the subgrade gets compacted and moisture-conditioned to manage the clay, and we lay a graded aggregate base built to the load the driveway will carry. Photos go into your record at each stage.
  4. 4
    Installation. Concrete gets poured with rebar and control joints; pavers get set to pattern, wet-cut at the edges, and locked with edge restraint; asphalt gets compacted in lifts. We keep the work area contained and clean up daily.
  5. 5
    Final walkthrough and documentation. We walk the finished driveway with you, hand over the photo record, the signed scope, and the written warranty, and explain what maintenance to expect. The 365-Day Done Right Promise covers the work for a full year.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

How Much Does Driveway & Pavers Cost in Plano?

A crew setting pavers over a compacted base

A typical paver driveway in Plano runs $7,000 – $18,000 depending on square footage, pattern, and how much base repair is needed. Concrete comes in lower, at $4,500 – $12,000 for a new pour, and a full driveway replacement sits at $5,000 – $14,000. Asphalt paving runs $3,500 – $9,000, and sealing is a small job at $250 – $700.

  • Paver driveway installation: $7,000 – $18,000
  • Concrete driveway installation: $4,500 – $12,000
  • Asphalt driveway paving: $3,500 – $9,000
  • Driveway replacement: $5,000 – $14,000
  • Driveway sealing: $250 – $700
  • Paver patio installation: $3,500 – $11,000

What moves the price is square footage, material choice, the condition of the base underneath, and how much demo and haul-off the job needs. A driveway poured over failed clay costs more to fix than one that just needs a fresh surface. To avoid overpaying, get the quote broken out by material, base work, and labor so you can compare apples to apples, and be wary of a number that arrives without a written scope. Every Rowan estimate includes the flat written price, the scope of work, the permit handling, and the written warranty. Call (844) 761-8346 for an exact quote, and bring a competitor’s estimate if you have one: our Free Second Opinion reviews it line by line at no charge.

Driveway & Pavers Near Plano – Our Service Area

We serve Plano and the surrounding communities, including Allen, Richardson, Murphy, Fairview, Lucas, Sachse, McKinney, Garland, Wylie, Rowlett, and Princeton. If you’re just over the line in Allen or Richardson, our crews schedule those jobs the same way they schedule work in Plano, with an on-site estimate and a written price. See our Driveway & Pavers in Allen page for that area, or start from the home page.

Serving Plano, TX – Our Local Coverage Area

We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

Frequently Asked Questions – Driveway & Pavers in Plano

A new clay tile roof

Schedule Your Driveway & Pavers Service in Plano Today

If your Plano driveway has cracked, settled, or simply worn out its looks, we’ll put the number in writing before anything starts. Every estimate is free, every quote is flat and itemized, and every job finishes under the 365-Day Done Right Promise. Call (844) 761-8346 to schedule your free estimate, and bring any written estimate you already have for a line-by-line second opinion at no charge.

Written by the team at Rowan Construction Group.

Why Plano Chooses Rowan Construction Group Plano

We set the standard for driveway & pavers in Plano.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Plano

Getting your driveway & pavers project started is simple.

1

Call or Request a Free Estimate

Tell us about your driveway & pavers project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local driveway & pavers pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Plano Customers Say

Trusted by homeowners across Plano and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gateA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA remodeled family room with new windows and a window seat

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Driveway & Pavers in Plano?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Plano.

(844) 761-8346

Request a Free Estimate in Plano

Tell us about your driveway & pavers needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch