







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Fence Installation for Plano Homeowners
A fence is one of the few things on your property that has to hold a straight line for a decade in North Texas clay soil and July heat. When that line starts to lean, or when a builder-grade cedar fence finally gives out after 10 – 15 years of seasonal movement, the fix is rarely a repair. It’s a full replacement. Rowan Construction Group Plano installs wood, vinyl, aluminum, wrought iron, and chain link fencing across Plano with written pricing before any post goes in the ground, and our technicians bring up to 19 years of experience to the build. Every project comes with a documented photo record and the 365-Day Done Right Promise. Call (844) 761-8346 to schedule a free estimate.
What Our Fence Installation Service Includes
We quote each type of fence on its own line with a written scope, a flat price, and a written warranty. What follows is how each sub-service works in Plano specifically.
Wood Fence
Cedar and treated pine privacy fencing is the dominant fence in Plano, most of it capped at 6 feet in residential zones and often required to be 8 feet on arterial-facing lots. We set posts in concrete below the frost line equivalent Plano’s expansive clay demands, which is deeper and with a wider concrete collar than most builder installs. If your current fence is leaning or the planking is cupping, we’ll show you photos of the post base and tell you plainly whether it’s a rebuild or a replacement.

Chain Link Fence
Chain link is the practical choice for larger Plano lots, pool enclosures, and side-yard runs where privacy isn’t the goal. We install galvanized and vinyl-coated chain link with tension wire, top rail, and proper terminal post bracing at every corner and gate. It’s the least expensive way to enclose a yard and the most likely to still be standing in 20 years with a single post repair along the way.

Vinyl Fence
Vinyl fencing in Plano runs $3,500 – $9,000 for a typical yard and handles the humidity far better than wood, with no paint, no staining, and no rot. We use vinyl systems with internal aluminum or steel reinforcement in the rails, not hollow extrusions that sag in the summer sun. It’s the right fence if you want to stop thinking about your fence, and the wrong one if your HOA has a stylistic restriction, which many Plano subdivisions do.

Aluminum Fence
Aluminum fencing runs $4,000 – $10,000 and is what most Plano homeowners choose when they want the look of wrought iron without the rust and weight. We install rackable and non-rackable aluminum systems with powder-coated finishes, and we set posts with proper spacing for grade changes so rails follow the slope rather than stair-stepping. Pool-code aluminum is also available where the barrier has to be at least 48 inches with self-closing, self-latching gates.
Iron Fence
Wrought iron fencing adds a permanent, ornamental boundary that holds up for decades, and it’s common on larger Plano lots, corner properties, and gated driveways. We work with welded and ornamental iron panels, set posts to true grade, and finish with a rust-inhibiting coating. Because iron is heavy and requires precise post anchoring in our clay soil, this is a fence type where a careful install matters more than the material itself.
Fence Repair
Not every fence needs to come down. A single rotted post, a broken gate hinge, or a section of chain link pulled loose by a dog is a repair, and we quote it as one with photos showing what we found. We’ll tell you when a repair buys you five more years and when the money is better spent on replacement, in writing, with the numbers side by side.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Service for Fence Installation
We quote and install fencing systems from ActiveYards for vinyl and aluminum, and we understand how their extrusion profiles behave through a full Plano summer and a freeze-thaw cycle. Recognized vinyl fencing brands like ActiveYards build their panels around reinforced rails and UV-stabilized material, which is where the difference between a fence that looks new at year eight and one that’s yellowed and sagging shows up.
For gates, hardware, and ornamental metal, we spec components that stand up to heat and clay movement, and for hardscape-backed fencing (fence lines meeting Belgard and Unilock paver borders on driveways and patios) we route the transition so the pavers and posts don’t fight each other. Whether you have ActiveYards, Belgard, Unilock, or any other make already on the property, we can match the run or replace it cleanly. If you need the fence line tied back into a paver driveway, our home page lays out the full seven-trade scope.
Signs You Need Fence Installation Right Now
- Leaning or loose posts. A single leaning post is a repair; a run of four or more means the concrete footings have failed and the whole line will keep going down. In Plano’s black clay, water pooling along a fence line speeds this up dramatically after a wet spring.
- Post rot at the soil line. Push a screwdriver into the base of a post. If it sinks more than a quarter inch, the post is gone below the surface no matter how solid it looks above. This is the most common failure we find on cedar fences past their tenth year.
- Cupping, splitting, or missing pickets. Once planking starts cupping, the wood is holding moisture and the integrity is already compromised. Patched pickets on a failing frame tend to come loose within a season.
- A gate that won’t stay square. Sagging gates almost always trace back to post movement, not the hinge. Hinge replacement on a moving post just delays the real fix.
- HOA notice or a failed pool inspection. Many Plano HOAs require fencing at a specific height, style, and material, and pool barriers have their own code requirements. A notice gives you a deadline; a replacement done correctly clears both at once.
Our Fence Installation Process – Step by Step
- 1
On-site walk and measurement. We measure the full run, note grade changes, locate the property line, and photograph existing conditions including post bases and any rot. You get a written scope and a flat price before anything is ordered or dug.
- 2
Written price and layout. Under Clause 1 of the Haven Standard, the price is written before any work starts. We confirm fence height against your HOA and city requirements and set post spacing on the layout.
- 3
Post setting. Posts go in with the depth and concrete collar Plano’s soil calls for, with the line set true. This is the step that determines whether your fence is straight in year ten, and it’s the one most builder installs skip to save time.
- 4
Panel and rail installation. Rails, planking, and panels go up with the gate framed on-site for a square fit on the actual opening, not a pre-manufactured gate dropped into an uneven one. We photograph the completed run, hardware, and gate swing.
- 5
Walkthrough and documented record. We walk the job with you, hand over the written warranty and the photo record of what was found and what was done, and make sure the gate latches before we leave. Any change to the scope along the way requires a signed change order first.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Fence Installation Cost in Plano?

A typical fence installation in Plano runs $3,500 – $9,000, with vinyl at the low-to-mid end and aluminum or ornamental iron pushing toward the top of that range. A standard 150- to 200-foot residential privacy run in cedar lands in the middle of that band. Concrete footings, gate hardware, removal of the old fence, and grade changes are the factors that move the number most.
What drives cost up or down:
| Scope | Typical Plano range |
|---|---|
| Vinyl fence installation | $3,500 – $9,000 |
| Aluminum fence installation | $4,000 – $10,000 |
| Wood privacy fence (per typical run) | Quote-based, in the lead range above |
How to avoid overpaying: insist on a written flat price with the fence height, material, post depth, and gate count spelled out, and get the old-fence removal in the same quote. A verbal number that grows once digging starts is the trap. Every Rowan estimate is a free, written, line-item price, and if you already have a competitor’s quote, our Free Second Opinion reviews it line by line at no charge. Call (844) 761-8346 for an exact quote – estimates are free.
Fence Installation Near Plano – Our Service Area
We install fencing across Plano and out into the surrounding communities: Richardson, Allen, Murphy, Fairview, Lucas, Sachse, McKinney, Garland, Wylie, Rowlett, and Princeton. Scheduling is confirmed by text, and for nearby neighborhoods the wait is usually short. If you’re comparing options, see our Fence Installation in Richardson and Fence Installation in Allen pages for local details, or our Fence Installation in Plano overview for the full scope.
Serving Plano, TX – Our Local Coverage Area
We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Fence Installation in Plano

Fence installation is the process of setting posts, framing rails, and hanging panels or pickets to create a boundary, privacy screen, or barrier around a property. It includes choosing a material (wood, vinyl, aluminum, iron, or chain link), setting the posts at the correct depth, and building gates to fit the actual opening. Rowan Construction Group Plano installs every one of those fence types and sets the price in writing before any post goes in the ground.
Most residential fence installs in Plano take one to three days, depending on length, material, and how many gates are involved. A standard privacy run on a clear lot is typically the fastest; a full perimeter with multiple gates and old-fence removal takes longer. You’ll get the estimated timeline in writing with your quote, and any schedule change gets communicated before it happens.
Fence installation in Plano typically runs $3,500 – $9,000, with vinyl at the lower end and aluminum or iron toward the top. The final number depends on linear feet, height, material, footing depth, gate count, and whether the old fence needs removal. Call (844) 761-8346 for a written, line-item estimate – it’s free and there’s no obligation.
Yes, we install ActiveYards vinyl and aluminum fencing systems and know how their rail profiles and UV-stabilized materials hold up through Plano summers. We also work with other recognized brands, so if your property already has fencing from a different maker, we can match or replace it cleanly. We’ll tell you in writing exactly what’s being installed and from which brand before work begins.
Scheduling depends on the season and material lead times, but most Plano installs are placed within a short window once the quote is signed. We confirm the date by text, and a live person answers our phones around the clock for questions and scheduling. Call (844) 761-8346 to find the next opening and lock in a free estimate.
Every Rowan fence installation is backed by the 365-Day Done Right Promise: if it isn’t done right, we make it right, and the guarantee is printed in your written warranty. The warranty is a document, not an asterisk, and it’s backed by the Haven Standard. Call (844) 761-8346 and ask to see the terms with your estimate.
Clear the fence line of furniture, planters, hoses, and anything stored along the run, and identify any buried irrigation lines or utility runs before we arrive. If your HOA requires approval, have that documentation ready so height and style match the rules. Our crew handles the rest, and our Free Second Opinion on any written estimate means you can prepare with confidence. Call (844) 761-8346 to schedule your walkthrough.
Schedule Your Fence Installation Service in Plano Today
Fence work is straightforward when the price is written and the posts are set right. That’s what you get from Rowan Construction Group Plano: a flat written price, a photo record of the work, and the 365-Day Done Right Promise behind it. Call (844) 761-8346 for your free, no-obligation estimate – and bring a competitor’s quote if you have one.
Written by the team at Rowan Construction Group.












