A Rowan company - serving Plano, TX
A backyard with a new horizontal privacy fence
Fence Installation · Allen, TX

Fence Installation in Allen - Free On-Site Quote, HOA Approval Handled

We locate the property line, pull the permit, and handle HOA approval before a post goes in. Written price per foot, quoted on site, with no add-ons at the end.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A new white vinyl privacy fence with a double gate
A new stained cedar privacy fence
New architectural shingles with a clean valley
A new casement window over a kitchen sink
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
A remodeled kitchen with a waterfall island and wood cabinets
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Fence Installation Across Allen

Fence installation in Allen, TX runs $3,500 to $9,000 for most residential jobs, and the number that matters is the one in writing before a post goes in the ground. We’re Rowan Construction Group Plano, and we work Allen lots the way they actually are: narrow side yards off Bethany Ridge, shared lines where a 1998 cedar fence meets a 2016 rebuild, and expansive clay that moves with every wet spring and dry August. If your fence is leaning, splitting, or about to be replaced, call (844) 761-8346 and we’ll walk the line with you.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Allen’s Preferred Fence Installation Company

A new wood side gate with black hardware

Allen homeowners compare contractors the way they compare appliances – they read the three-star reviews, they want the range on the page, and they want a text when the crew is confirmed. We answer calls by a live person 24/7, and we hand you a flat written price and a written scope before anyone touches a shovel. Background-checked, uniformed technicians do the work, and every visit includes a documented photo record as a standard deliverable, not an upsell.

Our technicians have up to 19 years of experience, and that shows up in the details a tight Allen lot demands: how the permit reads, who gets notified on a shared line, and where the gate swing will land without pinching a neighbor’s gate post. Under the 365-Day Done Right Promise, if it isn’t done right, we make it right – backed by The Haven Standard, not a handshake. We also offer a Free Second Opinion on any written estimate, so if you’ve already got a quote from another Allen fence contractor, bring it and we’ll review it line by line at no charge. You’ll get a written price, a written warranty, and a photo record of what was there and what we did.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Fence Installation Services in Allen

The trade ran Fence Installation for a reason: on these lots, the fence is often the first thing a homeowner replaces after the roof. Here’s what we build across Allen’s 75013 and 75002 ZIP codes.

Wood Fence Installation in Allen

Cedar privacy fencing is the default on most Allen lots, and for good reason – it’s the style that matches the surrounding 1990s and 2000s brick traditional subdivisions and stays within the city’s residential height rules. We build 6-foot cedar privacy fence with concrete-set posts sized for Allen’s clay, and we stain the finish line so it holds up through a North Texas summer. If your neighbor already has a taller fence, we reconcile the two heights in the plan before we quote.

Wood Fence Installation in Allen

Chain Link Fence Installation in Allen

Chain link is the practical choice for side yards, dog runs, and the back lot lines that back up to drainage easements off Ridgeview and McDermott. We set galvanized posts at proper depth and tension the fabric so it stays flat through the wet-dry swing. It’s the budget line item, and we’ll tell you plainly when it’s the right answer.

Chain Link Fence Installation in Allen

Vinyl Fence Installation in Allen

Vinyl privacy fencing runs $3,500 to $9,000 in Allen depending on linear footage, gate count, and whether we’re replacing an existing fence or building new on a cleared line. Most Allen homeowners choose a 6-foot privacy panel; vinyl holds color without the annual staining cedar needs. We’ll show you the fence brands we work with and quote a flat number before work starts.

Vinyl Fence Installation in Allen

Aluminum Fence Installation in Allen

Aluminum fencing starts at $4,000 and climbs to $10,000 on longer runs and pool-surround configurations. It’s a common pick for the newer 2015-era rebuilds near old downtown Allen, where a lower decorative fence reads better against the architecture than a solid privacy wall. We spec powder-coated panels that hold up to hail season along the US-75 corridor.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Allen

We work with names you can look up: ActiveYards for vinyl and aluminum systems, Belgard and Tremron for the hardscape and paver caps that finish a fence line into a patio or walkway. We don’t stock parts – no warehouse, no truck inventory – so turnaround depends on the brand and the panel spec, and we say so in the quote. When a custom gate or decorative aluminum panel is called for, the brand name goes in the written scope so you know exactly what’s being installed and why the number is what it is. If a competitor’s quote names no brand, that’s the first thing we’ll flag in the Free Second Opinion.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Fence Installation Problems We See in Allen Homes

  • Posts set shallow in expansive clay. Allen sits on blackland Prairie soil that shrinks and swells with the wet-dry cycle, so a post bedded a few inches short will heave and lean within a couple of seasons, racking the cedar panels and splitting the rails. We set posts in concrete at proper depth over stable soil – that’s the detail that separates a fence that lasts from a fence that leans by year three.
  • No permit and no shared-line notice on a tight lot. Allen’s residential fence rules cap height, prohibit placement forward of the front facade, and carry shared-line responsibility. When a fence goes in without the permit or the written notice to the adjacent owner, the city or the neighbor can force it down or moved. We pull the permit first and put the shared-line notice in writing before a post goes in.
  • Height and placement mismatches on infill and rebuild lots. Near old downtown Allen at Main and Belmont, a 6-foot fence on one lot sits next to a newer, taller fence on the rebuild next door, and the inspection sign-off flags the mismatch. We reconcile lot-by-lot, not subdivision-by-subdivision, because Allen’s two-wave housing pattern means the rules stack differently on each line.
  • Fences built before the neighbor is walked. On a small Allen lot, the finished line is visible from three yards. We walk the finished line with the neighbor and the city inspector before the job closes, so sign-off isn’t a surprise and the relationship holds.

Pricing for Fence Installation in Allen, TX

An open kitchen and dining area after a remodel

Here’s the range you can screenshot and compare:

Service Price Range in Allen
Vinyl Fence Installation $3,500 – $9,000
Aluminum Fence Installation $4,000 – $10,000

A typical wood privacy fence in Allen runs $3,500 to $9,000 depending on linear footage, gate count, and site access. Tight side yards, a shared-line notice, and clay-driven post depth all affect the number, and we give you a flat written price before work starts. Under Clause 1 of the Haven Standard, the price is written before anyone starts – no change proceeds without a signed change order, which is how projects finish within a few percent of the agreed cost. Free estimates, written line-item scope, no “call for a quote.”

We Also Serve Cities Near Allen

We also work Fence Installation in Allen and the surrounding Collin County cities – Fairview, Lucas, Plano, and Murphy – all within a short drive of Allen’s 75013 and 75002 ZIP codes. Same written price, same photo record, same 365-Day Done Right Promise. If you’re on the Allen line, we can price it from the Allen side.

Serving Allen, TX – Our Local Coverage Area

We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Fence Installation in Allen

A freestanding soaking tub in a remodeled primary bathroom

Why Allen Chooses Rowan Construction Group Plano

We set the standard for fence installation in Allen.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Allen

Getting your fence installation project started is simple.

1

Call or Request a Free Estimate

Tell us about your fence installation project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local fence installation pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Allen Customers Say

Trusted by homeowners across Allen and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new multi-panel patio door opening a kitchen to the patioA new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerA single-story rear room addition with tall windows and a new patioA new clay tile roofNew double-hung windows in a dining room

More services in Allen

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Fence Installation in Allen?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Allen.

(844) 761-8346

Request a Free Estimate in Allen

Tell us about your fence installation needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch