A Rowan company - serving Plano, TX
A backyard with a new horizontal privacy fence
Fence Installation · Richardson, TX

Fence Installation in Richardson - Free On-Site Quote, HOA Approval Handled

We locate the property line, pull the permit, and handle HOA approval before a post goes in. Written price per foot, quoted on site, with no add-ons at the end.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A new front yard fence with a matching gate
A new black aluminum pool fence with a gate
A finished backyard cottage with a small covered porch
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
A single-story rear room addition with tall windows and a new patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Fence Installation Across Richardson

If you own a home in Richardson and the back fence is leaning, the gate won’t latch, or a new pool or remodel has left your lot line unclear, you’re in the right place. We install and repair wood, chain link, vinyl, aluminum, iron, and privacy fencing across Richardson, from the post-war ranch blocks of 75080 and 75081 to the newer infill around 75082. Our technicians have up to 19 years of experience, and every job starts with a written flat price before anyone digs a hole. Call (844) 761-8346 to schedule your free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Richardson’s Preferred Fence Installation Company

A new white vinyl privacy fence with a double gate

Richardson is a fully built-out inner-ring suburb, which means the fencing work here isn’t new-build subdivision work. It’s redevelopment work. Lots in the 75080 and 75081 core are being torn down or gutted one at a time, and the Telecom Corridor conversions in 75082 keep crews moving at both residential and commercial scale. That shapes how a fence gets planned, permitted, and set. We know the difference.

Our reputation in Richardson comes from what customers can hold: a written price, a written scope, and a documented photo record after every visit. Under Clause 1 of the Haven Standard, the number is on paper before work starts. If something changes – a shifted lot line, a post hole that needs rerouting – the change is priced and the change order is signed before anyone picks up a tool. That’s the discipline that keeps projects within a few percent of the agreed cost, and it’s why homeowners here keep calling us back. Calls are answered by a live person 24/7, and every crew member who shows up is background-checked and uniformed.

Our Fence Installation team treats a Richardson job the way it should be treated: locate, survey, price, then build.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Fence Installation Services in Richardson

Wood Fence

Cedar and treated-pine fencing is the default for privacy along the older ranch lots in Richardson, but wood only lasts when the posts are set right. Given North Texas clay, we set posts on deeper footings with gravel and drainage rather than treating a post hole as an afterthought. A typical wood fence in Richardson runs $3,500 – $9,000 depending on length, height, and gate count.

Wood Fence

Chain Link Fence

Chain link still makes sense for side-yard runs, pet enclosures, and the working edges of commercial properties near the Telecom Corridor. It holds up to Richardson’s summer heat and hail season better than most people expect when the posts are set correctly. We’ll price the height, gauge, and gate hardware in writing before anything is ordered.

Chain Link Fence

Vinyl Fence

Vinyl is increasingly common on the rebuilt and infill lots around 75082, where a cleaner line matters and there’s less appetite for refinishing a wood fence every few years. Vinyl installation in Richardson typically runs $3,500 – $9,000. We set it on the same deep footings we use for wood, because vinyl panels rack just as easily as cedar when clay moves the posts.

Vinyl Fence

Aluminum Fence

Aluminum fencing is the pick for pool enclosures and front-yard definition where a taller privacy panel would look out of place. Aluminum installation in Richardson generally lands between $4,000 – $10,000 depending on spacing, height, and gate configuration. It’s a good fit for the mid-century ranch frontages in 75080 where a low, open line suits the house.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Richardson

We source fencing and gate hardware through a network of vetted suppliers, and the same sourcing depth we bring to structural work – the approach behind brands like Dvele and Plant Prefab in modern construction – informs how we price a fence honestly rather than inflating it. We don’t claim to stock a particular brand’s panels locally; we quote what the job needs, order it, and schedule installation around the delivery. That keeps the written price accurate and avoids the “we’ll figure it out on the truck” pricing that turns into a change order. Free second opinion on any written estimate you’ve already received from another contractor.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Fence Installation Problems We See in Richardson Homes

  • Posts set too shallow for expansive clay. Richardson’s soils swell when wet and shrink in the dry season, so shallow-set posts heave, panels rack, and gates start dragging within a season or two. The cedar isn’t usually the failure – it’s the footing under it.
  • Lot lines against a lot that’s mid-teardown or mid-remodel. When the neighbor’s permit work, pool, or addition changes the grade line next door, a fence set too early has to be re-set or torn out. Survey first, install second.
  • Old cast-iron sewer laterals and re-leveled slabs in the post-hole path. In 75080 and 75081 ranch stock, a “simple” new fence run can land a post hole right over a failing sewer lateral. A utility locate before digging is not optional here.
  • Permit-triggered inspections missed on taller privacy or commercial fencing. Around the 75082 infill corridor, taller privacy runs and commercial fencing can require inspection sign-off, and a fence set as an afterthought to the main build often misses it.

Pricing for Fence Installation in Richardson, TX

Here’s what fencing actually costs in Richardson’s market, written as line items rather than a single lumped number. A standard wood or vinyl privacy run in Richardson is generally $3,500 – $9,000; aluminum runs $4,000 – $10,000. What moves the number: total linear footage, height, gate count and hardware, footing depth (which matters more here than in newer subdivisions), whether a survey or utility locate is needed, and any permit or inspection fees tied to taller privacy or commercial fencing. You get a written flat price before work starts, and if a change is needed, the change order is signed before anyone touches the post hole.

Service Typical Range in Richardson
Vinyl Fence Installation $3,500 – $9,000
Aluminum Fence Installation $4,000 – $10,000

We Also Serve Cities Near Richardson

If you’re just outside Richardson’s city limits, we also work in Richardson and the surrounding communities of Plano, Garland, Murphy, and Sachse. The clay and the housing stock change a little city by city – the footing discipline doesn’t. Call (844) 761-8346 to confirm coverage and get a free estimate for your address.

Serving Richardson, TX – Our Local Coverage Area

We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Fence Installation in Richardson

A freestanding soaking tub in a remodeled primary bathroom

Why Richardson Chooses Rowan Construction Group Plano

We set the standard for fence installation in Richardson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Richardson

Getting your fence installation project started is simple.

1

Call or Request a Free Estimate

Tell us about your fence installation project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local fence installation pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richardson Customers Say

Trusted by homeowners across Richardson and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new casement window over a kitchen sinkNew painted shaker cabinets with an organized deep drawerA remodeled hall bathroom with patterned floor tile and painted wallsA remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA new clay tile roof

More services in Richardson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Fence Installation in Richardson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Richardson.

(844) 761-8346

Request a Free Estimate in Richardson

Tell us about your fence installation needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch