







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterBacksplash, Tile & Flooring in Plano, TX
Backsplash, tile, and flooring is the finish work that decides whether a Plano kitchen feels finished or half-done. It covers the surface between your countertop and upper cabinets, the floor underfoot, and any tile on the surrounding walls. Rowan Construction Group Plano handles these three layers as one job so the materials, grout lines, and transitions line up instead of fighting each other.
In Plano, that matters more than it sounds. The kitchens we walk through in Willow Bend and Deerfield were built between the late 1980s and early 2000s, and most still carry the original 4-inch ceramic backsplash and builder-grade vinyl or 12×12 porcelain floor. Homeowners who bought these houses at 2015-to-2022 prices are remodeling the kitchen first, and the finish surfaces carry most of the visual weight. We quote a flat written price before anyone touches a trowel, and we hand you that number to screenshot and compare. Call (844) 761-8346 for a free estimate. This work also runs alongside the larger rebuilds we describe on our Kitchen Remodeling in Plano page, and it folds into the broader Kitchen Remodeling scope when the cabinet layout changes too.

Key Takeaways
- Backsplash, tile, and flooring pricing in Plano runs roughly $2,400 to $14,000 depending on square footage and material.
- Every Rowan job gets a flat written price and written scope before work starts, with no change without a signed change order.
- Our technicians have up to 19 years of experience with tile membranes, substrate prep, and grout systems.
- You get a documented photo record of what we found and what we installed on every visit, included as standard.
- Backsplashes take one to two days. Floors take two to five, mostly driven by tear-out and substrate work.
When You Need Backsplash, Tile & Flooring
Finish surfaces fail on a schedule, and in Plano that schedule has local quirks. Here’s what usually brings a homeowner to us.
- Builder-grade backsplash showing its age. The thin 4-inch ceramic strip behind Plano counters from 1990s builds has often yellowed or cracked at the bullnose edge, and the caulk line behind the sink has let go. Once moisture gets behind it, the drywall below softens and the repair moves from cosmetic to structural.
- Grout that never stops coming out of the floor. Older ceramic tile in high-traffic kitchens – the walkway between the island and the range, the spot in front of the dishwasher – loses grout and starts to hollow underneath. In Plano’s clay soils, slab movement through the hot dry summers and wet springs accelerates that.
- Tile cracked in a straight line. A crack that runs point to point across several tiles usually means the substrate beneath has moved, not that the tile was bad. Laying new tile over that is wasted money. We open it up and look at the membrane.
- Water staining under the sink or along the toe-kick. Slow leaks from a dishwasher or ice maker line stain the floor from below before you see them from above. That’s a tear-out and dry-out job, not a cover-up job.
- You’re changing counters or cabinets. New quartz or granite counters almost always require a new backsplash because the old one comes off during removal. Cambria and Caesarstone slabs we install are often the trigger for the whole finish package. Our bathroom remodeling crews run into the same domino effect with shower tile.
- Square footage mismatch. A 12×12 porcelain floor in a 1998 kitchen now looks out of scale in a 2026 remodel, especially when the rest of the house has wide-plank LVP or hardwood. Tile-to-wood transitions in Plano homes are one of the most common reasons homeowners call us mid-project.

Our Backsplash, Tile & Flooring Process
This is the sequence we follow on every Plano finish job. It’s not glamorous. It’s the reason the tile is still tight in year five.
- Walkthrough and measurement. We measure actual square footage including waste factor and log substrate condition. Under Clause 1, the price is written before anyone starts, so this is where the number gets real.
- Written scope and flat price. You get the material list by brand and line, the grout and adhesive spec, the demo plan, and the daily photo record commitment spelled out. No “call for a quote.” The number is on the page.
- Protection and careful demo. Floors and counters get covered, cabinet faces get protected, and we pull the old tile with a controlled approach so we don’t scar the substrate underneath or crack adjacent cabinets. The photo record starts here – what we found under the old material is documented before it disappears.
- Substrate correction. This is where most of the money hides. Cement backer board or an uncoupling membrane is installed over the subfloor or slab, and any low spots are floated flat. Skipping this step is what makes cheap tile jobs crack in two years. Where the substrate is out of tolerance, we stop and write a change order before proceeding.
- Layout and set. We dry-fit the layout on the floor and wall so grout lines line up with cabinet edges, outlets, and window centers. The tile goes down with the specified adhesive, gets cured per the manufacturer’s direction, and the grout goes in after that cure, not the same day.
- Final walkthrough and handoff. Sealing, caulking, and cleanup happen, then we walk the job with you and hand you the documented photo record plus the written warranty. Under the 365-Day Done Right Promise, if a tile lifts or a grout line opens, we make it right.
Backsplash, Tile & Flooring Pricing in Plano
Backsplash, tile, and flooring in Plano typically runs $2,400 to $14,000 as a standalone finish package, or $6,000 to $22,000 when folded into a full kitchen remodel. The low end is a standard ceramic backsplash and ceramic floor with straightforward prep. The top end is large-format porcelain or natural stone with an uncoupling membrane and significant substrate correction.
| Line item | Typical Plano range | What moves the number |
|---|---|---|
| Ceramic or porcelain backsplash | $650 – $1,900 | Square footage, tile size, mosaic vs. field tile, outlet cuts |
| Large-format or glass backsplash | $1,400 – $3,600 | Material cost, cutting tolerance, grout line precision |
| Full-height natural stone backsplash | $2,400 – $5,200 | Slab selection, bookmatching, edge finish |
| Ceramic or porcelain floor tile | $2,200 – $5,800 | Square footage, tear-out, substrate condition |
| Large-format porcelain or natural stone floor | $4,500 – $9,800 | Slab tolerance, uncoupling membrane, layout complexity |
| Luxury vinyl plank flooring | $1,800 – $4,500 | Brand and wear layer (we install quality lines), prep work |
| Substrate correction and membrane | $600 – $2,400 | Floor flatness, existing underlayment, moisture |
| Demo and haul-away | $350 – $1,200 | Material hardness, thinset adhesion, disposal |
Two things push Plano jobs above the midpoint: tear-out of old thinset over slab, and slab flatness correction. Both are visible after demo and both get written into a change order before we proceed – you don’t get surprised by a bill after the work is done. If you have a competitor’s written estimate, we’ll review it line by line at no charge with our Free Second Opinion offer. For cabinet and counter work that surrounds the tile, our bathroom remodeling and windows and doors teams follow the same written-price discipline.
For comparison, our neighbors in Frisco kitchen remodeling and McKinney kitchen remodeling pages show similar ranges, since tile, grout, and labor costs track across Collin County.
FAQs – Backsplash, Tile & Flooring
How much does a backsplash cost in Plano?
A ceramic or porcelain backsplash in Plano typically costs $650 to $1,900, and glass or large-format tile runs $1,400 to $3,600. Full-height natural stone backsplashes move into the $2,400 to $5,200 range because of slab cost and precision cutting. The biggest drivers are tile size, square footage, and the number of outlets and window cutouts. Call (844) 761-8346 for an exact quote on your kitchen – estimates are free and in writing.
Can you install tile flooring over my existing tile?
Sometimes, yes, but we rarely recommend it in Plano without inspecting the substrate first. A tile-over-tile install adds height under cabinets and at door transitions, and it locks in any substrate movement you already have. Under the Haven Standard, if we find cracked or unbonded tile underneath, we recommend tear-out and proper substrate prep, and we’ll show you the photo record of what we found. Call (844) 761-8346 to have a technician look before you commit either way.
How long does a kitchen backsplash take?
Most kitchen backsplashes in Plano take one to two working days, including layout, set, grout cure, and caulk. Large-format or glass mosaics can push to three days because of the precision required, and any substrate work around outlets adds time. The crew arrives on the scheduled date, and you’ll know the day length before we start because it’s in the written scope. Call (844) 761-8346 to get on the schedule.
What tile brands and materials do you install?
We install porcelain, ceramic, natural stone, glass, and luxury vinyl plank from a range of vetted manufacturers. For outdoor-adjacent surfaces like mudroom entries and covered patios we sideline into Belgard and Unilock under the pavers scope, which has separate specs from interior tile. Our driveway and pavers and fence installation teams run the same brand-vetting discipline. Before any tile is ordered we confirm the spec sheet with you – thickness, PEI rating, water absorption, and finish – so the material matches the room. Call (844) 761-8346 and we’ll walk you through options at your kitchen.
Why Homeowners Choose Rowan Construction Group Plano for Tile Work
Finish work is where a contractor’s discipline becomes visible, or doesn’t. Rowan earns its keep on the boring parts: written scopes, signed change orders, substrate correction that isn’t offered as an upgrade, and a photo record of every stage. Our technicians have up to 19 years of experience with tile membranes, grout systems, and slab prep, and crews arrive uniformed and background-checked. A live person answers calls 24/7, and every visit includes documented photos of what we found and what we did.
Across 4,000-plus projects and since 2007, every one has been quoted with a flat written price before work started. That’s not a slogan – it’s Clause 1 of the Haven Standard, and it’s why we don’t say “call for a quote” anywhere on this page. The 365-Day Done Right Promise backs every installation, and it’s printed, not asterisked. If you’re also considering cabinet refacing or a full layout change, the wider scope lives on our Kitchen Remodeling in Plano page. If you’re reorganizing the entryway flow alongside new floors, our home additions in Plano team handles the mudroom and door adjustments. Roofing, roofing in Dallas, and other exterior work follow the same documentation standard.
Related reading that answers questions homeowners ask us during Plano tile jobs: how Kitchen Remodeling in Allen handles a similar finish package, and how Kitchen Remodeling in Richardson deals with older mid-century substrates.
Ready for a Written Price on Your Plano Finish Package?
Whether it’s a $700 backsplash refresh or a $14,000 full-floor and wall tile package, the next step is the same: a walkthrough, an honest look at what’s under the old material, and a flat written price in your hand before anything is ordered. No urgency tactics, no “this week only” slots, no guessing games. Call (844) 761-8346 for a free estimate and a written scope, or bring us a competitor’s quote and we’ll review it line by line at no cost.
Written by the team at Rowan Construction Group Plano, serving Plano.


