A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Kitchen Remodeling · Allen, TX

Kitchen Remodeling in Allen - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A new concrete driveway with a paver border
A remodeled hall bathroom with subway tile and a floating vanity
A garage converted into a guest room and home office
New architectural shingles with a clean valley
A new casement window over a kitchen sink
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Kitchen Remodeling Across Allen

Allen kitchens are a particular animal. Most of them were built between 1990 and 2010 in the Twin Creeks, Bethany Ridge, and Watters Crossing subdivisions, and they’re hitting the point where the cabinets are tired, the galley layout feels wrong, and the dropped soffit has stopped making sense. We know the streets, the lot sizes, and the staging headaches that come with a small-lot Allen remodel. Call (844) 761-8346 and we’ll put together a free written estimate for your kitchen. A written price comes before any work starts – that’s the short version of how we operate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Allen’s Preferred Kitchen Remodeling Company

Installers leveling a new base cabinet during a kitchen remodel

Allen homeowners research contractors the way they research appliances – reading reviews, comparing line items, wanting a number before they pick up the phone. We built our process around that. Since 2007 we’ve quoted every project with a flat written price and a written scope before anyone picks up a tool, across 4,000-plus jobs. That’s the discipline that keeps projects within a few percent of the agreed number.

From our Plano base, we work throughout Allen and the surrounding Collin County suburbs. Our technicians have up to 19 years of experience, are background-checked and uniformed, and every visit comes with a documented photo record as standard. We answer the phone with a live person 24/7 – not a voicemail box. And the 365-Day Done Right Promise means if something isn’t right, we make it right, backed by The Haven Standard terms page, not an asterisk.

If you’re shopping estimates, bring a competitor’s written quote and we’ll review it line by line at no charge. No sales pitch, just a second set of eyes on the numbers.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Kitchen Remodeling Services in Allen

Here’s what we handle most in Allen – the work that fills out a kitchen remodel on a compressed-wave subdivision home. For the full range of what we offer, see our Kitchen Remodeling team.

Kitchen Design & Layout

The most common starting point in Allen is a 1990s or 2000s galley boxed in by a dropped soffit and a half-wall. The design conversation is usually about opening that up – confirming what’s load-bearing before the ceiling comes down, planning where the beam goes, and mapping cabinet runs around the island you actually want. On the narrow lots near old downtown Allen, layout also means working around the slab you’ve got, not the one you wish you had.

Cabinets & Countertops

Cabinet installation in an Allen kitchen runs $4,000 – $13,000, and countertops $2,000 – $6,500. We name the brands in the quote – KraftMaid and Wellborn for cabinets, Cambria and Caesarstone for quartz surfaces – so the number is honest rather than padded. Reface if the boxes are sound. Replace if they’re not.

Kitchen Island Installation

An island is often the anchor for a galley-to-open-plan conversion in Twin Creeks or Bethany Ridge. Island installation in Allen runs $3,000 – $10,000 depending on size, sink and electrical rough-in, and whether the slab underneath needs leveling. On an older ranch near downtown, that review happens before the cabinet order, not after.

Backsplash, Tile & Flooring

Backsplash installation runs $800 – $2,500; full tile and flooring are scoped with the wider remodel. In Allen’s blackland clay, tile cracks over slab movement show up as hairline lines before anything else – so if the floor’s already telling you something, we flag it before the backsplash goes up.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Allen

We source across 50-plus vetted material brands. Names we work with regularly in Allen kitchens include KraftMaid and Wellborn cabinetry, Cambria and Caesarstone quartz, and Kohler and Toto plumbing fixtures. We don’t stock parts locally – the written quote names the exact product and lead time, and the material lands on the site on schedule. On modern-lot rebuilds in 75013, we also see homeowners comparing prefab systems from Dvele and Plant Prefab against a stick-built kitchen; either way, the layout, electrical rough-in, and finish schedule are what we scoped. Half of a good kitchen is specifying the right brand at the right price. The other half is turning up.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Kitchen Remodeling Problems We See in Allen Homes

  • The load-bearing surprise. A half-wall or dropped soffit gets quoted as removable, then turning out structural mid-demo on a tight Allen lot with no room to fit a beam. The fix is confirming structure before the quote, not after. We do that every time.
  • Missing foundation evaluation on older ranches. Original 1960s ranch homes near downtown Allen (75013), now sandwiched between new million-dollar rebuilds, sit on slabs that have had 60 years of blackland clay shrink and swell. If the kitchen has cracked tile and out-of-square cabinet runs, a foundation evaluation is step one.
  • No written staging and parking plan. On a small-lot subdivision street, a dumpster or cabinet delivery blocking a neighbor’s driveway is how a work-hours complaint gets filed. We write the staging plan before anyone arrives.
  • First-cycle wear concentrated in one wave. Much of Allen’s housing was built in two compressed waves, so whole streets are hitting 20-to-30 years at the same time. That means simultaneous kitchen, cabinet, and utility upgrades – and permitting queues that reflect it.

Pricing for Kitchen Remodeling in Allen, TX

Pricing here reflects what Allen’s market actually supports. A full kitchen remodel runs $14,000 – $45,000 depending on size, layout change, and finish level. A small or partial remodel runs $9,000 – $20,000. Location on the lot matters too: a downtown Allen rebuild with foundation evaluation and pier work adds cost that a same-size kitchen in the newer subdivisions won’t carry. Every quote is written line-item, every time, with a fixed price and no change order signed without you. Free estimate, no pressure.

Service Allen Price Range
Kitchen Remodel $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000

We Also Serve Cities Near Allen

If you’re just outside the Allen city limits, we work throughout the surrounding area too. Our Kitchen Remodeling in Allen service covers Fairview, Lucas, Plano, and Murphy – all within reach from our Plano base. Same written price, same documented photo record, same process wherever the address falls in Collin County.

Serving Allen, TX – Our Local Coverage Area

We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Kitchen Remodeling in Allen

A new black aluminum pool fence with a gate

Why Allen Chooses Rowan Construction Group Plano

We set the standard for kitchen remodeling in Allen.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Allen

Getting your kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Allen Customers Say

Trusted by homeowners across Allen and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new wood side gate with black hardwareA new white vinyl privacy fence with a double gateA remodeled hall bathroom with patterned floor tile and painted wallsA wood double vanity with two mirrors after a bathroom remodelA finished backyard cottage with a small covered porchA new roof with clean valleys and new flashing

More services in Allen

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Kitchen Remodeling in Allen?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Allen.

(844) 761-8346

Request a Free Estimate in Allen

Tell us about your kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch