







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Plano
If you’re pricing a bathroom remodel in Plano, the honest answer is that most full baths land between $9,000 and $28,000, and the number you get in writing should reflect what’s actually under your floor before anyone quotes a tile price. We know Plano – the Deerfield streets off Legacy, the Willow Bend lots where builder-grade everything is now twenty years old, the Russell Creek homes where a cracked shower pan usually means the slab moved, not that the tile failed. That knowledge changes the quote. Call (844) 761-8346 and we’ll put a written price in front of you before any work begins.
Why Rowan Construction Group Plano Is Plano’s Preferred Bathroom Remodeling Company

Plano is a built-out suburb. Almost no raw land left, so the work here is renovation, teardown-rebuild, and upgrading tract housing from the 1980s through the 2000s – not new construction. That distinction matters for a bathroom, because the systems inside those homes are hitting end-of-life at roughly the same time. We quote flat written prices on every visit, with a written scope and written warranty, and no change proceeds without a signed change order. That’s Clause 1 of the Haven Standard, and it’s why projects finish within a few percent of the number the customer agreed to.
Response time to Plano is quick – we schedule Plano estimates around your week, and a live person answers calls 24/7, not a voicemail box. Our technicians have up to 19 years of experience, are background-checked and uniformed, and leave a documented photo record on every visit as a standard deliverable. Bring a competitor’s written estimate and we’ll review it line by line at no charge – a Free Second Opinion, no strings. It’s the reason Plano homeowners who read the three-star reviews first tend to call us second.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Bathroom Remodeling Services in Plano
Every scope below is priced before a tool comes out. If you want the full menu of what the Bathroom Remodeling team handles, that page covers it trade by trade.
Full Bathroom Remodeling
A gut remodel in a Plano slab-on-grade home runs $9,000 – $28,000, and the first thing we check is the floor and the shower pan. Plano’s expansive black clay shrinks and swells with the wet-dry cycle, and on slab foundations that movement shows up as cracked tile or a drain that won’t sit level. If the slab has moved, we say so before we quote tile, and the fix is a foundation correction, not a cosmetic patch.
Walk-In Showers & Shower Remodeling
A walk-in shower installation in Plano typically runs $4,500 – $12,000 depending on size, glass, and whether the drain needs relocating. We build the pan on a stable substrate with a proper moisture barrier – not a mastic-and-tile shortcut – because North Texas humidity finds every weak point in a shower assembly.
Tub-to-Shower Conversion
Tub-to-shower conversions run $3,500 – $10,000 in Plano and are the single most requested change we quote in Willow Bend and Russell Creek homes, where the original tub is now twenty-five years old. We handle the rough-in, the waterproofing, and the permit, then schedule the inspection so the job doesn’t sit half-finished.
Vanities, Tile & Fixtures
Vanity installation lands at $800 – $3,000, and tile and fixture work is priced within the remodel range. We set vanities to the space, not a catalog photo, and we specify fixtures rated for a humid bathroom – tile and glass that hold up under Plano’s summer moisture, not builder-grade parts that pit in a season.
Trusted Brands We Service in Plano
We work with a documented list of fifty-plus vetted material brands, and the ones that make sense for a Plano bathroom are the ones that survive the climate and hold their finish. On the substrate and masonry side that includes Oldcastle and Quikrete products where a mortar bed or setting material is specified; we don’t carry stock, so there’s no upcharge for a part sitting on a shelf. We quote the brand and the spec in writing, so you see exactly what’s going into the wall – not a generic tile allowance that gets marked up later. Fast turnaround on materials, no warehouse middleman.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Plano Homes
- Skipping a foundation check before tile goes down. In Plano’s slab-on-grade subdivisions, a cracked floor or a shower pan that won’t drain is often slab movement, not failed tile. Install new finishes over a moving slab and you’ll be looking at cracks within a year.
- An incomplete architectural review packet. Plano’s HOA overlays and city review want a specific submittal – materials, colors, elevations, sometimes fixture specs. A partial packet means weeks of delay and a half-finished bathroom waiting on committee sign-off.
- Builder-grade materials in a humid bathroom. Plano’s humid summers punish a bathroom without proper exhaust. Fixtures and finishes meant for a dry climate fail early here; we specify for the moisture, and we check the ventilation while we’re in the walls.
- Permits pulled after the fact. Plano’s permitting is strict, and a remodel done without the right inspection creates a problem at resale. We pull the permits and pass the inspections, and the paperwork is part of the job.
Pricing for Bathroom Remodeling in Plano, TX

Here’s the honest range for a Plano bathroom, in dollars you can screenshot and compare. A flat written price comes before any work starts – the quote is a scope and a warranty, not a “call for a quote.” What moves the number is the substrate (whether the slab needs correction first), the size and glass in a shower, and the fixture tier. Foundation corrections are quoted separately and honestly, because hiding one in a tile price helps nobody.
| Service | Typical Plano Range |
|---|---|
| Bathroom Remodel (full) | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Bathroom Vanity Installation | $800 – $3,000 |
Estimates are free and the written price is fixed. Under Clause 1 of the Haven Standard, no work proceeds on a change until the change order is signed – so the number you agree to is the number you pay, within a few percent across the project. Call (844) 761-8346 for an exact quote.
We Also Serve Cities Near Plano
We work throughout the northern metro, so if you’re just outside Plano – Richardson, Fairview, Lucas, or Allen – we can schedule a free estimate there too. The same clay-soil reality and the same review process apply across these towns, which is why the Plano approach travels well. See Bathroom Remodeling in Plano for the full local scope.
Serving Plano, TX – Our Local Coverage Area
We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Bathroom Remodeling in Plano

It depends on your subdivision and what’s visible from outside. Interior-only work in most Plano subdivisions doesn’t require architectural review, but exterior-facing changes – a window, a vent, exterior finishes – and many HOA overlays do. If review is needed, we file it: the packet includes materials, colors, elevations, and fixture specs, which is exactly what committee reviewers look for. Call (844) 761-8346 for a free estimate.
Significantly. Plano’s expansive black clay shrinks and swells with the wet-dry cycle, and on slab-on-grade homes that movement shows up as a cracked floor, a shower pan that won’t drain, or a door that won’t close. A qualified local pro checks for foundation movement before installing tile or a pan, and may recommend pier-and-beam-leveling or drainage corrections first. Doing the cosmetic scope without that check is how finishes crack within a year. Call (844) 761-8346 to schedule a free estimate.
Most bathroom remodels that move plumbing, electrical, or change the footprint require a permit and inspection. Plano’s permitting is strict, so the inspection schedule is planned into the job from day one. We pull the permits and pass the inspections as part of the scope. Call (844) 761-8346 for a free estimate.
A full Plano bathroom remodel typically runs three to six weeks of construction once work starts, with approval and material lead time added on top. Because we schedule around approval – not in front of it – the bathroom isn’t sitting half-finished waiting on a committee. Call (844) 761-8346 for a free estimate.
Kohler and Toto fixtures hold up under Plano’s humid summers and are specified for moisture resistance. For vanities and setting materials, Oldcastle and Quikrete products are common specifications. We name the brand and spec in writing so you see what’s going in. Call (844) 761-8346 for a free estimate.
Written by the team at Rowan Construction Group.












