A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Rockwall, TX

Bathroom Remodeling in Rockwall - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A new paver patio with a seat wall and fire pit
A single-story rear room addition with tall windows and a new patio
A new clay tile roof
New double-hung windows in a dining room
A new front yard fence with a matching gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Rockwall

If you live in Rockwall and your shower tile has started to move underfoot, or the subfloor near the tub feels soft, we can help. We connect Rockwall homeowners with independent local professionals who rebuild bathrooms to a spec that holds up on Blackland Prairie clay, not just on a showroom drawing. Our technicians have up to 19 years of experience, and we know the difference between a 75032 lakefront bath and a 75087 inland one. Call (844) 761-8346 for a free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Rockwall’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

Bathroom Remodeling in Rockwall draws on the same discipline we bring to every trade: a written price before anyone picks up a tool, and a signed change order before any scope moves. Rockwall homeowners research contractors the way they research appliances, and we write the price range on the page so you can compare before you ever call. Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed before arriving at your door. A live person answers calls 24/7, and every visit includes a documented photo record as a standard deliverable, not an add-on.

Local knowledge matters here. The bathrooms in Rockwall’s older shoreline ranches and lake cottages were built to a spec that assumed dry conditions. On the clay under Lake Ray Hubbard, that assumption is wrong, and the materials fail first. We build for the conditions this city actually has.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Bathroom Remodeling Services in Rockwall

Full Bathroom Remodeling

A full remodel in a Rockwall ranch home usually means opening the walls to see what the last thirty years did. We scope the rough-in, the waterproofing, and the finish in one written document so nothing gets added mid-job without a signature. A typical full bath in Rockwall runs $9,000 – $28,000.

Walk-In Showers & Shower Remodeling

A walk-in shower is only as good as what’s under the tile. We specify a sloped mortar bed with topical waterproofing and stainless or hot-dip galvanized fasteners on the valve and glass, because the standard hardware corrodes fast on this side of the lake. Walk-in shower installation in Rockwall ranges from $4,500 to $12,000.

Tub-to-Shower Conversion

Pulling a 1980s tub and replacing it with a curbless or low-curb shower is one of the most common jobs we see in 75032. The old pan usually has no pre-slope, so water has been pooling under the tile for years. A conversion runs $3,500 – $10,000 and always includes rebuilding that pan properly.

Vanities, Tile & Fixtures

Vanity swaps, tile reset, and fixture changes are small jobs that expose big problems when the substrate is wet. We open it, look, and tell you what’s there in plain terms before quoting the fix. Vanity installation alone is $800 – $3,000; tile and fixture work gets scoped alongside it.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Rockwall

We source across more than fifty vetted brands, including Kohler and Toto fixtures, plus setting materials from Oldcastle and Quikrete for the mortar beds and subfloor prep that decide whether a Rockwall bathroom lasts. We don’t claim to stock parts locally. What we do is spec the right product for the clay and vapor conditions here, get it ordered, and keep the schedule honest. If a brand you already own needs matching or warranty work, bring the model number to the estimate and we’ll work from it.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Bathroom Remodeling Problems We See in Rockwall Homes

  • Corroded fasteners on shower valves and glass enclosures. Black-oxide and standard galvanized screws in 75032 lakefront baths corrode within a few years, and the fixture starts to move. We replace them with stainless or hot-dip galvanized hardware as part of the rough-in.
  • Tile tenting over a wet substrate. The Blackland Prairie clay transmits moisture vapor through slab-on-grade, and standard drywall or greenboard behind the tile wicks it. The tile releases at the joint, usually 5 – 7 years after the original install.
  • Shower pans with no pre-slope. Many 1970s – 1990s pans were built flat with a clamped drain that never sealed properly, so water sits under the tile. That means a full tear-out and re-rough-in, not a tile patch.
  • Soft subfloor near the tub. Particleboard and thin plywood swell when vapor reaches them, and the floor feels spongy underfoot. We secure and replace the deck before any new finish goes down.

Pricing for Bathroom Remodeling in Rockwall, TX

Here is the written range, in dollars, so you can screenshot it and compare. A full bathroom remodel in Rockwall runs $9,000 – $28,000. Walk-in shower installation is $4,500 – $12,000. A tub-to-shower conversion is $3,500 – $10,000, and a small bathroom remodel sits at $5,000 – $12,000. What moves the number: whether the pan and substrate need full replacement, whether the walls open to corroded fasteners, and how much tile and glass you choose. We deliver a flat written price with a written scope before any work starts, and no change proceeds without a signed change order. Free second opinion on any competitor’s written estimate, reviewed line by line.

Service Rockwall Price Range
Full Bathroom Remodel $9,000 – $28,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Small Bathroom Remodel $5,000 – $12,000

We Also Serve Cities Near Rockwall

Our Bathroom Remodeling team also handles projects in Rowlett, Wylie, Sachse, and Sunnyvale. The clay and lake conditions shift a little as you move inland, and we build the spec to match the lot, not to a single template. If you’re just outside Rockwall, tell us the ZIP and we’ll size the job correctly.

Serving Rockwall, TX – Our Local Coverage Area

We serve Rockwall and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Bathroom Remodeling in Rockwall

A new stained cedar privacy fence

Why Rockwall Chooses Rowan Construction Group Plano

We set the standard for bathroom remodeling in Rockwall.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Rockwall

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Rockwall Customers Say

Trusted by homeowners across Rockwall and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled family room with new windows and a window seatA standing-seam metal roof over a covered porchA new bay window with a cushioned seatA new wood side gate with black hardwareA new concrete driveway with a paver borderA stone counter, tile backsplash and open shelf after a kitchen remodel

More services in Rockwall

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Rockwall?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Rockwall.

(844) 761-8346

Request a Free Estimate in Rockwall

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch