A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Sunnyvale, TX

Bathroom Remodeling in Sunnyvale - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A remodeled primary bathroom with a soaking tub and walk-in shower
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Sunnyvale

Bathroom remodeling in Sunnyvale, TX typically runs $9,000 to $28,000, and on large custom homes it starts one step earlier than most people expect: with an approval packet, not a hammer. Sunnyvale’s position on the rural edge of Dallas County means plenty of remodels here get checked against architectural review before demolition can start, and we build that phase into the schedule from day one. We know the one-acre lots off the Belt Line corridor, the acreage properties where the nearest neighbor is a cattle pasture, and the ZIP code 75182 that ties it all together. Call (844) 761-8346 to schedule a free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Sunnyvale’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

Sunnyvale homeowners research contractors the way they research appliances, and the work gets judged against two standards at once: small-town expectations and big-city buyer scrutiny. That’s the bar we build to. Every project gets a flat written price and a written scope before work begins, under Clause 1 of The Haven Standard, so the number is on paper before anyone picks up a tool. Our technicians have up to 19 years of experience, they’re background-checked and uniformed, and a live person answers calls 24/7.

What makes the difference in Sunnyvale is detail the market here actually notices. Tile and fixture allowances set too low for custom-home standards force a change order mid-project, so we build them at Sunnyvale levels from the start. Schedules that start before approval is final leave rough-ins half-finished when plans shift, so we don’t do that either. Every visit includes a documented photo record as a standard deliverable, not an add-on, and no change proceeds without a signed change order.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Bathroom Remodeling Services in Sunnyvale

The Bathroom Remodeling team covers the full range here, from a primary bath in a new custom build to a tub swap in an older ranch house. Here’s what each service looks like in Sunnyvale terms.

Full Bathroom Remodeling

A full remodel in Sunnyvale’s large custom homes often hits a snag when the existing subfloor or rough-in doesn’t match the new layout, especially where slab-on-grade meets expansive clay soils that have shifted over time. We open walls early to verify load-bearing conditions and plumbing before committing to a layout, then put the findings in writing. The finish schedule and allowances go into the submittal packet together so the approved plan and the ordered materials match.

Walk-In Shower Installation

Walk-in showers run $4,500 to $12,000 in Sunnyvale and are the single most requested upgrade we quote on acreage properties. Frameless glass enclosures work well in the larger bath footprints common on one-acre-plus lots, and we spec the pan and membrane to handle North Texas humidity swings. Vent placement has to clear architectural review on exterior-facing walls, so we confirm it before ordering glass.

Vanities, Tile & Fixtures

Vanity installation runs $800 to $3,000, and tile work is where Sunnyvale jobs most often go over budget if allowances are set too thin. We quote tile and fixtures against custom-home standards rather than tract-home defaults, using names like Kohler and Toto for fixtures and Cambria or Caesarstone for tops. That keeps the change order count down and the finish schedule honest.

Tub-to-Shower Conversion

Tub-to-shower conversions run $3,500 to $10,000 and suit the older ranch-style homes mixed into Sunnyvale’s building stock. We check the drain location and valve rough-in before demolition so the new pan isn’t fighting the old plumbing. Where the tub sits against an exterior wall, the vent and window details go into the approval packet ahead of time.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Sunnyvale

We work with a deep bench of vetted brands because the written quote is only honest if the materials in it are real: KraftMaid and Wellborn cabinets, Cambria and Caesarstone countertops, Kohler and Toto fixtures. We don’t stock parts locally and don’t claim to; materials are ordered to the approved finish schedule, which is how lead times stay predictable. For homeowners exploring prefabricated or modular options, we can also discuss how panelized systems from makers like Plant Prefab or Mighty Buildings fit a remodel plan. Fast turnaround comes from sequencing, not from warehouse claims.

Common Bathroom Remodeling Problems We See in Sunnyvale Homes

  • Submittal packets missing exterior-facing details. Window trim and vent location are the two details most often left off, and either one can stall architectural review while demolition has already started. We assemble that packet complete the first time.
  • Allowances set too low for custom-home standards. A tile allowance built for tract housing forces a change order halfway through a Sunnyvale primary bath. We set allowances to the finish level the home actually calls for.
  • Trades scheduled before approval is final. When plans change after the rough-in starts, the inspection sign-off fails and the bath sits half-finished. We schedule against the approved date, not the hoped-for one.
  • Clay soil movement under slab-on-grade baths. The Blackland Prairie’s expansive clay shrinks and swells with wet-dry cycles, and older slabs show it in cracked tile and out-of-level floors. We check substrate condition before setting anything on top of it.

Pricing for Bathroom Remodeling in Sunnyvale, TX

Here’s the number, in dollars, before you call. A typical full bathroom remodel in Sunnyvale runs $9,000 to $28,000, and a small bathroom remodel runs $5,000 to $12,000. Walk-in shower installation is $4,500 to $12,000, a tub-to-shower conversion is $3,500 to $10,000, and vanity installation is $800 to $3,000. What moves a job within those ranges is footprint, the condition of the substrate and rough-in once walls are open, and the finish level the approved plan calls for. You get a flat written price with a written scope and a written warranty before work starts, and estimates are free.

Service Sunnyvale Price Range
Full Bathroom Remodel $9,000 – $28,000
Small Bathroom Remodel $5,000 – $12,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Bathroom Vanity Installation $800 – $3,000
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why Architectural Review Changes the Sunnyvale Timeline

Because Sunnyvale sits on the rural-urban fringe, bathroom remodels on large-lot custom homes often require architectural review by the town or county, not just a building permit. The approval packet has to show exterior-facing details like window style and vent placement, and that review adds weeks before demolition can start. Who files it? We do. We assemble the submittal packet, including the finish schedule and allowance details, and we schedule the crew against the approved date so rough-in and inspection sign-off finish in one mobilization rather than sitting half-done waiting on a committee.

This is also where staging gets local. On acreage lots the nearest neighbor may be an active cattle pasture, so spoil piles and equipment access get coordinated with property owners and county road crews instead of an HOA, and concrete trucks sometimes face a long gravel driveway before they reach the house. Every one of those details lands in the written scope up front.

We Also Serve Cities Near Sunnyvale

If you’re just outside town, our Bathroom Remodeling in Sunnyvale coverage reaches the surrounding communities: Rowlett, Garland, Rockwall and Sachse. The same written-price discipline and the same approval-aware scheduling apply whether the lot sits on the Sunnyvale side of the county line or a few miles into a neighboring city.

Serving Sunnyvale, TX – Our Local Coverage Area

We serve Sunnyvale and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Bathroom Remodeling in Sunnyvale

Get a Written Price Before Any Work Starts

A garage converted into a guest room and home office

Whether you’re planning a walk-in shower, a full primary bath remodel or a vanity and tile refresh, the next step is a number in writing. Call Rowan Construction Group Plano at (844) 761-8346 for a free estimate. You’ll get a flat written price, a written scope, a written warranty, and an approval timeline built for Sunnyvale from the first visit.

Written by the team at Rowan Construction Group Plano.

Why Sunnyvale Chooses Rowan Construction Group Plano

We set the standard for bathroom remodeling in Sunnyvale.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunnyvale

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunnyvale Customers Say

Trusted by homeowners across Sunnyvale and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new stained cedar privacy fenceA new paver patio with a seat wall and fire pitA single-story rear room addition with tall windows and a new patioA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gate

More services in Sunnyvale

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Sunnyvale?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunnyvale.

(844) 761-8346

Request a Free Estimate in Sunnyvale

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch