







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Wylie
We handle bathroom remodeling in Wylie with a written flat price and a written scope before anyone lifts a tool, and most jobs we quote land between $9,000 and $28,000 depending on how far the plumbing moves. If you live off Ballard or Brown near the old downtown, or out in the newer subdivisions toward the east side, you already know this town builds on clay that moves. That soil is why we check the slab before we ever talk tile. Call (844) 761-8346 and we’ll set up a free estimate.
Why Rowan Construction Group Plano Is Wylie’s Preferred Bathroom Remodeling Company

We’ve built a record across 4,000-plus projects, and every one of them went out the door with a flat written price and a documented photo record of what the crew found and what they did. Wylie homeowners get that same file. You’ll see the condition of your subfloor in the photos, not just hear about it on a callback.
Our technicians have up to 19 years of experience, and they’re background-checked and uniformed. A live person answers the phone at any hour. When work in Wylie needs a rough-in moved, we pull the permit and don’t start demolition until the inspection sequence is mapped out. That discipline is Clause 1 of The Haven Standard, and it’s the reason our projects finish within a few percent of the agreed number. Bring us a competitor’s written quote and we’ll review it line by line at no charge. Call (844) 761-8346.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Bathroom Remodeling Services in Wylie
Full Bathroom Remodeling
A full gut in Wylie starts with the slab. Because most homes here are slab-on-grade on Blackland Prairie clay, any change to the drain layout means cutting concrete and re-pouring with a positive slope toward the drain. We scope that cut into the written price up front so it never shows up as a surprise change order after the first dry summer cracks your new floor. Full remodels in Wylie typically run $9,000 to $28,000.
Walk-In Shower Installation
Walk-in showers in Wylie run $4,500 to $12,000, and the range depends mostly on what the slab allows. A curbless design needs the drain re-routed and the floor built up or recessed, which is real concrete work. We set the waterproofing membrane and drain assembly to the condition of the floor we actually find, not the one we hoped for.
Tub-to-Shower Conversion
Conversions are the most common request we get in the newer subdivisions, where the original builder put a standard tub in a hall bath that nobody uses. Tub-to-shower runs $3,500 to $10,000 in Wylie. We verify the existing drain location works before we order a single piece of glass.
Vanities, Tile & Fixtures
Vanity installation by itself runs $800 to $3,000. Tile selection matters more here than in most places because the clay moves the slab, and a rigid tile set over a moving floor cracks. We choose a tile and setting method that tolerates minor movement, and we source fixtures from Kohler and Toto so the written quote carries honest numbers. Browse the full scope on our Bathroom Remodeling service page.
Trusted Brands We Service in Wylie
We source across fifty-plus vetted brands, and for bathrooms that means Kohler and Toto fixtures, Cambria and Caesarstone countertops, and KraftMaid and Wellborn vanities. For prefab and modular bath options we can spec Dvele or Plant Prefab components where a project calls for them. We don’t stock parts in Wylie and don’t claim to. When a brand is specified, we order it against the written scope and you get the lead time in writing before you sign. Turnaround holds because the order goes in only after the rough-in and subfloor are verified.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Wylie Homes
- Tile and shower pans set over a slab that already moved. On Wylie’s expansive clay, a floor that has shifted will crack new tile within one dry summer. We check moisture and deflection before setting anything.
- No permit for a rough-in change. Wylie still has a small-town permitting and inspection culture, and out-of-town builders who treat it like a big city get surprised when drain and vent work is checked before the walls close.
- Materials ordered before the rough-in is confirmed. Vanities, tile and glass bought before the slab cut reveals a drain that can’t meet code is the classic allowance blowout. We verify first, then order.
- A toilet that rocks or a spongy floor. Both usually trace to slab movement, and often to a shower pan that was never properly sloped during the original build. That’s a foundation question before it’s a tile question.
Pricing for Bathroom Remodeling in Wylie, TX

Here’s how the numbers break down in Wylie’s market. A written, flat price comes before any work starts, and if something in the scope changes, no work proceeds on that change until the change order is signed. Our projects finish within a few percent of the agreed cost because of that rule, not in spite of it.
| Service | Typical Wylie Range |
|---|---|
| Full Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
What moves you up or down that scale: whether the plumbing rough-in has to move, whether the slab needs cutting and re-pouring, and how much of the floor has already shifted on the clay. Call (844) 761-8346 for a free estimate and a flat written price.
We Also Serve Cities Near Wylie
If you’re just outside Wylie in Sachse, Murphy, Rowlett or Fairview, we cover those too, and the same slab and permitting questions apply across that stretch of the Collin County growth corridor. Learn more about our Bathroom Remodeling in Wylie and the surrounding communities. Call (844) 761-8346 to schedule.
Serving Wylie, TX – Our Local Coverage Area
We serve Wylie and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Bathroom Remodeling in Wylie

Yes, and most rough-in or plumbing changes in Wylie require a permit and an inspection before the walls close. Because Wylie still operates with a small-town permitting and inspection culture even as the subdivisions grow, the inspection sequence matters. Out-of-town builders who skip it fail the sign-off when drain and vent work is checked. We pull the permit and build the inspection checkpoints into the schedule. Call (844) 761-8346 for details on your address.
It means the drain path and the floor condition drive the price. North Texas Blackland Prairie clay swells in wet springs and shrinks in dry summers, so the slab may already have moved. A curbless or re-routed walk-in shower requires cutting the slab and re-pouring with a positive drain slope, and we confirm the slab and framing are stable first. Walk-in showers in Wylie run $4,500 to $12,000, mostly based on that concrete work.
Allowances are placeholder dollar amounts for materials not yet chosen, and they cause change orders when the real number comes in higher than the allowance. On Wylie’s clay slabs, blown allowances usually happen when glass, tile or a vanity is ordered before the rough-in is verified and the slab cut reveals a drain that needs re-routing. We verify the subfloor and rough-in before ordering so the written scope stays honest. Call (844) 761-8346 and we’ll walk you through the allowance lines on your quote.
Usually yes. The older ranch homes clustered near the historic downtown along Ballard and Brown streets have tighter baths, but a tub-to-shower conversion works there when the existing drain can be reused. If the drain needs relocating, the slab gets cut, which adds cost. Tub-to-shower conversion in Wylie runs $3,500 to $10,000, and the range tracks that drain question. Call (844) 761-8346 for a free estimate.
Every item in the written scope, plus a verified waterproofing test and a drain that slopes correctly. On a Wylie slab, also confirm no new cracking at the tile or grout and that the door and glass close clean. Under the 365-Day Done Right Promise, if it isn’t done right we make it right, so the punch list isn’t the end of your protection. Get your photo record before you pay. Call (844) 761-8346 to schedule.
Written by the team at Rowan Construction Group.












