A Rowan company - serving Plano, TX
A new herringbone paver driveway
Driveway & Pavers · Garland, TX

Driveway & Pavers in Garland - Free Measure, Itemized Written Quote

Free on-site measure and a written price per square foot before we book you in. Proper base preparation and sealed edges, because a cheap base is why driveways crack.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A new concrete driveway with a paver border
A new paver patio with a seat wall and fire pit
New double-hung windows in a dining room
A new front yard fence with a matching gate
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Driveway & Pavers Across Garland

If your Garland driveway has started to crack, sink, or hold water after every rain, you’re dealing with the black clay soil that runs under most of this city. We know Garland well: the post-war ranch streets around 75040 and 75041, the newer builds out toward 75042, and the way a driveway here has to be spec’d for soil movement, not just for looks. Call (844) 761-8346 and we’ll schedule a free, written estimate for driveway and paver work at your Garland home.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Garland’s Preferred Driveway & Pavers Company

A crew setting pavers over a compacted base

Garland homeowners research before they call, and that suits us fine. Every driveway and paver project we quote comes with a flat written price and a written scope before anyone breaks ground – no “call for a quote,” no verbal ballpark. That written number is the number you compare, line by line, and it’s the number we hold ourselves to.

We also bring documentation your insurer will actually accept. On every visit you get a photo record of what we found and what was done – included, not an upsell. Our technicians have up to 19 years of experience, are background-checked, and a live person answers calls around the clock.

The 365-Day Done Right Promise backs the work: if it isn’t done right, we make it right. And if you’re holding a competitor’s written estimate, bring it in for a free second opinion – we’ll review it line by line at no charge.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Driveway & Pavers Services in Garland

Garland sits on North Texas expansive clay, and that shapes every driveway decision here. We spec each job to the soil and lot in front of us. Our Driveway & Pavers team covers the full range below.

Paver Driveways

Clay moves, and pavers flex with it. A properly installed paver driveway in Garland – built on a compacted, properly graded base – handles seasonal swell and shrink far better than a rigid slab, which is why we recommend it often on the older streets near downtown Garland and the 75041 corridor. We work with Belgard and Techo-Bloc systems and quote the base prep and edge restraint as their own line items, because that’s where cheap paver jobs fail.

Paver Driveways

Concrete Driveways & Concrete Work

Concrete still makes sense for plenty of Garland homes, but the mix and reinforcement matter more here than in most cities. Across 1950s-70s ranch neighborhoods in 75040 and 75042, we routinely see original slabs without modern reinforcement – poured long before today’s standards. For replacement, we often spec a reinforced mix or a post-tension design where the soil profile calls for it.

Concrete Driveways & Concrete Work

Asphalt Driveways & Resurfacing

Asphalt gives you a lower entry price and easy resurfacing, which appeals to Garland owners who want the driveway fixed without chasing it again every few years. We grade for drainage first, because runoff erosion under a Garland driveway is a common failure. Resurfacing is quoted as its own scope so you know exactly what’s being covered.

Asphalt Driveways & Resurfacing

Driveway Repair & Replacement

Not every cracked driveway needs a full tear-out. We assess the substrate and grade before recommending repair versus replacement, and if a Garland driveway only needs stabilized base work and a resurface, that’s what the written quote will say. When replacement is the honest call, the quote itemizes demolition, haul-off, base, and finish.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Garland

Material choice drives both durability and price, and we source from a deep roster rather than steering every Garland job to one product. For pavers we regularly quote Belgard and Techo-Bloc systems, chosen for their joint design and edge restraint over clay. On the prefab side, brands like Plant Prefab and Boxabl come up when clients pair driveway work with a detached structure. We don’t stock parts locally – everything is ordered to the job – so the timeline you’re given is based on actual lead times, not a warehouse shelf.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Driveway & Pavers Problems We See in Garland Homes

  • Concrete cracking and heaving from clay movement. The expansive black clay under Garland’s older neighborhoods swells when wet and shrinks when dry, and 1950s-70s slabs poured without modern reinforcement take the worst of it. You’ll see it as lifted edges, spider-crack patterns, and separations at the joints.
  • Paver settlement and rutting from weak base compaction. A paver driveway only flexes as well as its base is compacted. Over clay, a shallow or poorly compacted base lets pavers drop and rut through the wet-dry cycle, usually within a season or two of a cheap install.
  • Stormwater runoff and erosion under the surface. Inadequate grading sends Garland rain toward the slab edge instead of away, gradually washing out the soil beneath. That shows up as sinkholes at the driveway apron and soft spots along walkways.
  • Right-of-way work done without permits. Driveway aprons touching the city right-of-way need permitting and inspection. Work done without that paperwork can complicate a later sale or an insurance claim – a real issue on Garland’s older platted lots.

Pricing for Driveway & Pavers in Garland, TX

Here’s what driveway work actually runs in the Garland market. A typical paver driveway installation runs $7,000 – $18,000. Concrete driveway installation runs $4,500 – $12,000, driveway replacement runs $5,000 – $14,000, and driveway sealing runs $250 – $700. What moves you within those ranges: soil condition, how much base prep the lot needs, right-of-way permit work, and material choice. Every quote is a flat written price with the scope and warranty spelled out, and changes only proceed on a signed change order. Call (844) 761-8346 for a free estimate.

Service Garland Price Range
Paver Driveway Installation $7,000 – $18,000
Concrete Driveway Installation $4,500 – $12,000
Driveway Replacement $5,000 – $14,000
Driveway Sealing $250 – $700

We Also Serve Cities Near Garland

We work throughout Garland and the surrounding communities, including Sachse, Rowlett, Richardson, and Murphy. Many of these towns sit on the same clay and face the same drainage questions, so the written quote you receive for Driveway & Pavers in Garland reflects conditions we handle across the area. Call (844) 761-8346 to schedule an estimate at your home.

Serving Garland, TX – Our Local Coverage Area

We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Driveway & Pavers in Garland

A wood double vanity with two mirrors after a bathroom remodel

Why Garland Chooses Rowan Construction Group Plano

We set the standard for driveway & pavers in Garland.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Garland

Getting your driveway & pavers project started is simple.

1

Call or Request a Free Estimate

Tell us about your driveway & pavers project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local driveway & pavers pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Garland Customers Say

Trusted by homeowners across Garland and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled primary bathroom with a soaking tub and walk-in showerA single-story rear room addition with tall windows and a new patioA new clay tile roofA new front entry door with glass sidelightsA new wood side gate with black hardwareA stone counter, tile backsplash and open shelf after a kitchen remodel

More services in Garland

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Driveway & Pavers in Garland?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Garland.

(844) 761-8346

Request a Free Estimate in Garland

Tell us about your driveway & pavers needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch