







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Garland
Bathroom remodeling in Garland typically runs $9,000 – $28,000, and the number you should care about most is what’s under the floor before anyone frames a shower. Most of the homes we quote in Garland were built between the 1950s and 1970s, which means cast-iron drains, galvanized supply lines, and a slab sitting on expansive black clay that moves with every wet-dry cycle. We know the difference between a 1962 ranch off Garland Road and a 1975 tract house near Duck Creek, and we price the job around what’s actually there. Call (844) 761-8346 for a free estimate with a written price before any work starts. Under Clause 1 of the Haven Standard, the number is in writing before a tool comes off the truck.
Why Rowan Construction Group Plano Is Garland’s Preferred Bathroom Remodeling Company

Garland sits just inside Dallas’s northeastern loop, and that geography shapes how we work here. Older platted lots, mature pecan and oak canopies, and the city’s own permitting and inspection regime mean a bathroom job has to be planned against the house that’s actually there, not a template. We’ve built our local reputation on that precision: a written scope, a written price, and a signed change order before any change proceeds. No surprise line items.
Every crew that arrives in Garland is background-checked and uniformed, and every visit ends with a documented photo record of what we found and what we did. That record matters when a homeowner is filing an insurance claim or selling a house in 75040, because it shows the rough-in was opened, photographed, and inspected. A live person answers our phones 24/7, and if a competitor’s quote is sitting on your counter, we’ll review it line by line at no charge through our Free Second Opinion offer. We don’t sell enthusiasm. We sell a documented record, backed by the 365-Day Done Right Promise: if it isn’t done right, we make it right.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Bathroom Remodeling Services in Garland
We handle the full range of bath work across Garland, from a powder-room refresh to a full gut of a 1950s ranch bath. Here’s what most Garland homeowners actually call us for.
Full Bathroom Remodeling
A full remodel in Garland almost always starts with the foundation assessment before framing. The expansive clay under those 75040 and 75041 lots racks door frames and cracks original tile, and a shower pan set on a slab that’s still moving will crack and leak no matter how good the tile work is. We open the floor, replace the cast-iron drain and galvanized supply rough-in to current code, repair any soft subfloor around the toilet flange, and only then frame and waterproof. A permit gets pulled so an inspector can sign off on what’s inside the walls before they close.
Walk-In Showers & Shower Remodeling
Walk-in showers are the most requested upgrade in Garland’s older bathrooms, and getting one right means getting the waterproofing right. We use proper backer board and a bonded membrane over the pan, and we check that any exterior bath window is glazed to meet the wind-load requirements the rest of a Garland house is built to. Tiled showers are where cheap quotes fail first, usually within a season or two.
Tub-to-Shower Conversion
Converting a tub to a walk-in is often the smartest move in a small Garland ranch bath, where a standard tub eats half the usable floor. The conversion runs $3,500 – $10,000 depending on drain relocation and tile selection. As a full-service Bathroom Remodeling team, we sequence the demo, rough-in, and waterproofing so the shower is usable and code-compliant when we leave, not just pretty.
Vanities, Tile & Fixtures
We source vanities, tile, and fixtures from brands that hold up in North Texas heat and humidity, including Kohler and Toto fixtures. A vanity installation in Garland runs $800 – $3,000 installed, and the biggest cost swing is the countertop material. We write the tile and fixture selections into the scope up front so the allowances are honest, not a bait-and-switch that triggers change orders halfway through.
Trusted Brands We Service in Garland
We don’t stock parts locally or run a warehouse. What we do is source from more than fifty vetted material brands and quote the honest number, not an inflated one. In Garland bathrooms that means Kohler and Toto fixtures, Cambria and Caesarstone for vanity tops, and KraftMaid and Wellborn for cabinetry. When a homeowner wants a prefab or modular shell, we’ve worked with Dvele and Mighty Buildings on panelized components. If a brand isn’t right for your slab and drain situation, we tell you and recommend the one that is.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Garland Homes
The failures in Garland bathrooms are specific and predictable, and they almost always trace back to one of four causes.
- Waterproofing over a moving slab. The expansive clay under Garland’s older neighborhoods shifts with wet-dry cycles, and a shower pan installed over a slab that’s still moving will crack and leak within a season or two. Foundation assessment comes first, every time.
- No permit pulled for the rough-in. Plumbing and electrical changes inside the walls go uninspected, then show up as unpermitted work on a resale or an insurance review. That’s a problem you don’t want to discover at closing.
- Cheap quotes that skip the membrane or the glazing. A bid that omits a waterproofing membrane, proper backer board, or wind-rated glazing on exterior bath windows leaves a job that fails the moisture and high-wind loads the rest of a Garland house is built to handle.
- Lowball allowances. Contracts with unrealistic tile, vanity, and fixture allowances trigger a string of change orders mid-job. We set allowances against real selections so the written price holds.
Pricing for Bathroom Remodeling in Garland, TX

Here’s the honest number, written out before anyone picks up a tool. A full bathroom remodel in Garland runs $9,000 – $28,000. The swing depends on whether the drain and supply rough-in get replaced, how much subfloor repair the toilet flange reveals, tile grade, and whether the shower is a full custom pan or a standard replacement. Small bathrooms come in lower, and a tub-to-shower conversion is often the most cost-effective upgrade in a 1960s ranch.
| Service | Price Range in Garland |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Shower Replacement | $3,000 – $8,500 |
| Bathroom Vanity Installation | $800 – $3,000 |
Every quote is a flat written price with a written scope and a written warranty. No work proceeds on a change until you sign the change order, which is the discipline that keeps a Garland bath job within a few percent of the number you agreed to. Call (844) 761-8346 for a free estimate.
We Also Serve Cities Near Garland
Garland sits close to a handful of neighboring cities we work in regularly: Sachse to the northeast, Rowlett across the lake, Richardson to the west, and Murphy up the way. The clay and the housing stock don’t change much at the city line, so the same foundation-first approach applies. If you’re comparing bath contractors across the area, our Bathroom Remodeling in Garland page is the place to start.
Serving Garland, TX – Our Local Coverage Area
We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Bathroom Remodeling in Garland

Yes, most Garland bathroom remodels that move plumbing or electrical require a permit. The inspection covers the rough-in while the walls are still open: the new drain and supply lines, the electrical work, and the shower pan and waterproofing, which an inspector signs off on before anything is closed up. That sign-off is what makes the finished bath insurable and clean on a resale. Call (844) 761-8346 and we’ll walk through what your specific job needs.
Because the expansive black clay under Garland’s 1950s-70s ranch lots shifts with wet-dry cycles, and racked door frames and cracked original tile are the early warning signs. A shower pan set on a slab that’s still moving will crack and leak regardless of how good the tile work is, so we assess the foundation before framing goes up. Skipping that step is the single most common way a bath job here gets redone. Call (844) 761-8346 for a free estimate that includes the foundation check.
A compliant quote includes the waterproofing membrane and proper backer board, wind-rated glazing on any exterior bath window, the permit and inspection fees, realistic allowances for tile, vanity, and fixtures, and a written scope and warranty. Cheap bids typically omit the membrane and the permit, set allowances unrealistically low, then recover the difference through change orders mid-job. Bring any competitor’s quote to us and we’ll review it line by line at no charge. Call (844) 761-8346 to schedule.
Documented work protects you at resale and at claim time: an inspected rough-in with photos and a permit record shows a buyer and an insurer that the plumbing and electrical inside the walls are code-compliant, not unpermitted. Unpermitted bath work frequently surfaces during a Garland resale inspection and can delay or derail a closing. We hand you the photo record and the signed scope as standard. Call (844) 761-8346 for a free estimate.
Yes, and it’s often the best use of the space in a small ranch bath, since a standard tub eats roughly half the usable floor. The conversion runs $3,500 – $10,000 depending on drain relocation and tile grade, and it usually starts with the same foundation and rough-in check as a full remodel. Call (844) 761-8346 for a free estimate on your specific layout.
Every Garland bathroom we touch gets the same treatment: a written price before any work starts, a signed change order before any change, and a documented photo record when the crew leaves, all backed by the 365-Day Done Right Promise. Our technicians have up to 19 years of experience, and crews are background-checked and uniformed. If you’re ready to price a bath remodel, call Rowan Construction Group at (844) 761-8346 for a free estimate, and bring a competitor’s quote if you have one.
Written by the team at Rowan Construction Group.












