







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Fence Installation Across Allen
Fence installation in Allen, TX runs $3,500 to $9,000 for most residential jobs, and the number that matters is the one in writing before a post goes in the ground. We’re Rowan Construction Group Plano, and we work Allen lots the way they actually are: narrow side yards off Bethany Ridge, shared lines where a 1998 cedar fence meets a 2016 rebuild, and expansive clay that moves with every wet spring and dry August. If your fence is leaning, splitting, or about to be replaced, call (844) 761-8346 and we’ll walk the line with you.
Why Rowan Construction Group Plano Is Allen’s Preferred Fence Installation Company

Allen homeowners compare contractors the way they compare appliances – they read the three-star reviews, they want the range on the page, and they want a text when the crew is confirmed. We answer calls by a live person 24/7, and we hand you a flat written price and a written scope before anyone touches a shovel. Background-checked, uniformed technicians do the work, and every visit includes a documented photo record as a standard deliverable, not an upsell.
Our technicians have up to 19 years of experience, and that shows up in the details a tight Allen lot demands: how the permit reads, who gets notified on a shared line, and where the gate swing will land without pinching a neighbor’s gate post. Under the 365-Day Done Right Promise, if it isn’t done right, we make it right – backed by The Haven Standard, not a handshake. We also offer a Free Second Opinion on any written estimate, so if you’ve already got a quote from another Allen fence contractor, bring it and we’ll review it line by line at no charge. You’ll get a written price, a written warranty, and a photo record of what was there and what we did.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Fence Installation Services in Allen
The trade ran Fence Installation for a reason: on these lots, the fence is often the first thing a homeowner replaces after the roof. Here’s what we build across Allen’s 75013 and 75002 ZIP codes.
Wood Fence Installation in Allen
Cedar privacy fencing is the default on most Allen lots, and for good reason – it’s the style that matches the surrounding 1990s and 2000s brick traditional subdivisions and stays within the city’s residential height rules. We build 6-foot cedar privacy fence with concrete-set posts sized for Allen’s clay, and we stain the finish line so it holds up through a North Texas summer. If your neighbor already has a taller fence, we reconcile the two heights in the plan before we quote.

Chain Link Fence Installation in Allen
Chain link is the practical choice for side yards, dog runs, and the back lot lines that back up to drainage easements off Ridgeview and McDermott. We set galvanized posts at proper depth and tension the fabric so it stays flat through the wet-dry swing. It’s the budget line item, and we’ll tell you plainly when it’s the right answer.

Vinyl Fence Installation in Allen
Vinyl privacy fencing runs $3,500 to $9,000 in Allen depending on linear footage, gate count, and whether we’re replacing an existing fence or building new on a cleared line. Most Allen homeowners choose a 6-foot privacy panel; vinyl holds color without the annual staining cedar needs. We’ll show you the fence brands we work with and quote a flat number before work starts.

Aluminum Fence Installation in Allen
Aluminum fencing starts at $4,000 and climbs to $10,000 on longer runs and pool-surround configurations. It’s a common pick for the newer 2015-era rebuilds near old downtown Allen, where a lower decorative fence reads better against the architecture than a solid privacy wall. We spec powder-coated panels that hold up to hail season along the US-75 corridor.
Trusted Brands We Service in Allen
We work with names you can look up: ActiveYards for vinyl and aluminum systems, Belgard and Tremron for the hardscape and paver caps that finish a fence line into a patio or walkway. We don’t stock parts – no warehouse, no truck inventory – so turnaround depends on the brand and the panel spec, and we say so in the quote. When a custom gate or decorative aluminum panel is called for, the brand name goes in the written scope so you know exactly what’s being installed and why the number is what it is. If a competitor’s quote names no brand, that’s the first thing we’ll flag in the Free Second Opinion.
See the difference
Before
After
Before
After
Before
AfterCommon Fence Installation Problems We See in Allen Homes
- Posts set shallow in expansive clay. Allen sits on blackland Prairie soil that shrinks and swells with the wet-dry cycle, so a post bedded a few inches short will heave and lean within a couple of seasons, racking the cedar panels and splitting the rails. We set posts in concrete at proper depth over stable soil – that’s the detail that separates a fence that lasts from a fence that leans by year three.
- No permit and no shared-line notice on a tight lot. Allen’s residential fence rules cap height, prohibit placement forward of the front facade, and carry shared-line responsibility. When a fence goes in without the permit or the written notice to the adjacent owner, the city or the neighbor can force it down or moved. We pull the permit first and put the shared-line notice in writing before a post goes in.
- Height and placement mismatches on infill and rebuild lots. Near old downtown Allen at Main and Belmont, a 6-foot fence on one lot sits next to a newer, taller fence on the rebuild next door, and the inspection sign-off flags the mismatch. We reconcile lot-by-lot, not subdivision-by-subdivision, because Allen’s two-wave housing pattern means the rules stack differently on each line.
- Fences built before the neighbor is walked. On a small Allen lot, the finished line is visible from three yards. We walk the finished line with the neighbor and the city inspector before the job closes, so sign-off isn’t a surprise and the relationship holds.
Pricing for Fence Installation in Allen, TX

Here’s the range you can screenshot and compare:
| Service | Price Range in Allen |
|---|---|
| Vinyl Fence Installation | $3,500 – $9,000 |
| Aluminum Fence Installation | $4,000 – $10,000 |
A typical wood privacy fence in Allen runs $3,500 to $9,000 depending on linear footage, gate count, and site access. Tight side yards, a shared-line notice, and clay-driven post depth all affect the number, and we give you a flat written price before work starts. Under Clause 1 of the Haven Standard, the price is written before anyone starts – no change proceeds without a signed change order, which is how projects finish within a few percent of the agreed cost. Free estimates, written line-item scope, no “call for a quote.”
We Also Serve Cities Near Allen
We also work Fence Installation in Allen and the surrounding Collin County cities – Fairview, Lucas, Plano, and Murphy – all within a short drive of Allen’s 75013 and 75002 ZIP codes. Same written price, same photo record, same 365-Day Done Right Promise. If you’re on the Allen line, we can price it from the Allen side.
Serving Allen, TX – Our Local Coverage Area
We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Fence Installation in Allen

Yes – Allen requires a permit for most residential fence installations, and the permit pulls against the specific lot, not the subdivision. Height limits, placement behind the front facade, and shared-line responsibility all get checked. Call (844) 761-8346 and we’ll walk you through what your specific line requires – estimates are free.
The shared line in Twin Creeks and Bethany Ridge is a shared responsibility, and the fix starts with written notice to the adjacent owner before any work. We document the lean, photograph the line, and quote the repair or replacement against the actual property line. Call (844) 761-8346 to schedule a free estimate.
Allen’s expansive blackland clay shrinks and swells with the wet-dry cycle, so posts set shallow heave and lean, which racks cedar panels and splits rails within a few seasons. The fix is proper post depth over stable soil with concrete set correctly – a detail we put in the written scope, not just in conversation. Call (844) 761-8346 for a free estimate.
A flat price, a written scope that names the fence brand and panel spec, the permit and shared-line notice status, the gate swing and access plan, and the workmanship warranty. On a constrained Allen lot, the access plan matters as much as the price. Call (844) 761-8346 and we’ll send a written quote – estimates are free.
Yes – matching existing 6-foot cedar to a newer, taller fence on the adjacent lot is routine here because Allen’s housing arrived in two waves. We reconcile height, style, and stain lot-by-lot, since the city’s rules apply per line, not per subdivision. Call (844) 761-8346 to talk through the match and get a written price.
Ready to price your Allen fence? Call (844) 761-8346 for a free estimate – we’ll hand you a flat written price and a written scope before any work starts, backed by the 365-Day Done Right Promise and a documented photo record on every visit. No-hassle upfront pricing, background-checked technicians, and a live person on the line 24/7.
Written by the team at Rowan Construction Group.












