







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Fence Installation Across Richardson
If you own a home in Richardson and the back fence is leaning, the gate won’t latch, or a new pool or remodel has left your lot line unclear, you’re in the right place. We install and repair wood, chain link, vinyl, aluminum, iron, and privacy fencing across Richardson, from the post-war ranch blocks of 75080 and 75081 to the newer infill around 75082. Our technicians have up to 19 years of experience, and every job starts with a written flat price before anyone digs a hole. Call (844) 761-8346 to schedule your free estimate.
Why Rowan Construction Group Plano Is Richardson’s Preferred Fence Installation Company

Richardson is a fully built-out inner-ring suburb, which means the fencing work here isn’t new-build subdivision work. It’s redevelopment work. Lots in the 75080 and 75081 core are being torn down or gutted one at a time, and the Telecom Corridor conversions in 75082 keep crews moving at both residential and commercial scale. That shapes how a fence gets planned, permitted, and set. We know the difference.
Our reputation in Richardson comes from what customers can hold: a written price, a written scope, and a documented photo record after every visit. Under Clause 1 of the Haven Standard, the number is on paper before work starts. If something changes – a shifted lot line, a post hole that needs rerouting – the change is priced and the change order is signed before anyone picks up a tool. That’s the discipline that keeps projects within a few percent of the agreed cost, and it’s why homeowners here keep calling us back. Calls are answered by a live person 24/7, and every crew member who shows up is background-checked and uniformed.
Our Fence Installation team treats a Richardson job the way it should be treated: locate, survey, price, then build.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Fence Installation Services in Richardson
Wood Fence
Cedar and treated-pine fencing is the default for privacy along the older ranch lots in Richardson, but wood only lasts when the posts are set right. Given North Texas clay, we set posts on deeper footings with gravel and drainage rather than treating a post hole as an afterthought. A typical wood fence in Richardson runs $3,500 – $9,000 depending on length, height, and gate count.

Chain Link Fence
Chain link still makes sense for side-yard runs, pet enclosures, and the working edges of commercial properties near the Telecom Corridor. It holds up to Richardson’s summer heat and hail season better than most people expect when the posts are set correctly. We’ll price the height, gauge, and gate hardware in writing before anything is ordered.

Vinyl Fence
Vinyl is increasingly common on the rebuilt and infill lots around 75082, where a cleaner line matters and there’s less appetite for refinishing a wood fence every few years. Vinyl installation in Richardson typically runs $3,500 – $9,000. We set it on the same deep footings we use for wood, because vinyl panels rack just as easily as cedar when clay moves the posts.

Aluminum Fence
Aluminum fencing is the pick for pool enclosures and front-yard definition where a taller privacy panel would look out of place. Aluminum installation in Richardson generally lands between $4,000 – $10,000 depending on spacing, height, and gate configuration. It’s a good fit for the mid-century ranch frontages in 75080 where a low, open line suits the house.
Trusted Brands We Service in Richardson
We source fencing and gate hardware through a network of vetted suppliers, and the same sourcing depth we bring to structural work – the approach behind brands like Dvele and Plant Prefab in modern construction – informs how we price a fence honestly rather than inflating it. We don’t claim to stock a particular brand’s panels locally; we quote what the job needs, order it, and schedule installation around the delivery. That keeps the written price accurate and avoids the “we’ll figure it out on the truck” pricing that turns into a change order. Free second opinion on any written estimate you’ve already received from another contractor.
See the difference
Before
After
Before
After
Before
AfterCommon Fence Installation Problems We See in Richardson Homes
- Posts set too shallow for expansive clay. Richardson’s soils swell when wet and shrink in the dry season, so shallow-set posts heave, panels rack, and gates start dragging within a season or two. The cedar isn’t usually the failure – it’s the footing under it.
- Lot lines against a lot that’s mid-teardown or mid-remodel. When the neighbor’s permit work, pool, or addition changes the grade line next door, a fence set too early has to be re-set or torn out. Survey first, install second.
- Old cast-iron sewer laterals and re-leveled slabs in the post-hole path. In 75080 and 75081 ranch stock, a “simple” new fence run can land a post hole right over a failing sewer lateral. A utility locate before digging is not optional here.
- Permit-triggered inspections missed on taller privacy or commercial fencing. Around the 75082 infill corridor, taller privacy runs and commercial fencing can require inspection sign-off, and a fence set as an afterthought to the main build often misses it.
Pricing for Fence Installation in Richardson, TX
Here’s what fencing actually costs in Richardson’s market, written as line items rather than a single lumped number. A standard wood or vinyl privacy run in Richardson is generally $3,500 – $9,000; aluminum runs $4,000 – $10,000. What moves the number: total linear footage, height, gate count and hardware, footing depth (which matters more here than in newer subdivisions), whether a survey or utility locate is needed, and any permit or inspection fees tied to taller privacy or commercial fencing. You get a written flat price before work starts, and if a change is needed, the change order is signed before anyone touches the post hole.
| Service | Typical Range in Richardson |
|---|---|
| Vinyl Fence Installation | $3,500 – $9,000 |
| Aluminum Fence Installation | $4,000 – $10,000 |
We Also Serve Cities Near Richardson
If you’re just outside Richardson’s city limits, we also work in Richardson and the surrounding communities of Plano, Garland, Murphy, and Sachse. The clay and the housing stock change a little city by city – the footing discipline doesn’t. Call (844) 761-8346 to confirm coverage and get a free estimate for your address.
Serving Richardson, TX – Our Local Coverage Area
We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Fence Installation in Richardson

Because the posts fail before the panels do. Richardson’s expansive clay swells and shrinks across the wet-dry cycle, and shallow-set posts heave and settle, which racks the panels out of plumb and drags the gate. Replacing just the panels over failing posts buys you a season, not a fence. Call (844) 761-8346 for a free estimate on a proper re-post.
Usually yes, or at minimum survey and confirm the lot line first. If the neighbor’s permit work, pool, or addition will change the grade line, a fence set today can end up torn out or re-set when their job finishes. We’ll price the current line and flag any risk in writing so you can decide. Call (844) 761-8346 for a free estimate.
Standard residential fences in Richardson typically don’t require a permit, but taller privacy runs and commercial fencing can, and that’s where inspection sign-off matters. Around the 75082 infill corridor, fencing set as an afterthought to the main build often misses it. We’ll tell you in the written scope whether your fence needs a permit. Call (844) 761-8346 to talk it through.
Yes, and it happens more than people expect in 75080 and 75081. The original cast-iron sewer laterals in these ranches sit right where a post hole gets planned, and so does a slab that’s already been re-leveled once. We call for utility locate before any digging and price any rerouting in writing before work starts. Call (844) 761-8346 for a free estimate.
Vinyl fencing in Richardson typically runs $3,500 – $9,000, and aluminum runs $4,000 – $10,000. Length, height, gate count, and footing depth drive the number more than material choice. You get a written flat price before work starts, with any change priced and approved in writing. Call (844) 761-8346 for an exact quote – estimates are free.
Ready to get a fence priced properly? Call Rowan Construction Group Plano at (844) 761-8346 for a free estimate. You’ll get a written flat price and written scope before any work starts, backed by the 365-Day Done Right Promise – if it isn’t done right, we make it right.
Written by the team at Rowan Construction Group.












