A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Home Additions & ADU · Allen, TX

Home Additions & ADU in Allen - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A finished backyard cottage with a small covered porch
A single-story rear room addition with tall windows and a new patio
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A galley kitchen opened up to the dining room with a new peninsula
A walk-in shower with large-format tile and a built-in niche
A standing-seam metal roof over a covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Home Additions & ADU Across Allen

If you’re planning an addition or an ADU in Allen, the number you need first is a written one: most additions here land between $45,000 and $130,000, and detached ADUs run $90,000 to $220,000. We give you that figure in writing, with a flat scope and a written warranty, before anyone picks up a tool. Allen’s housing stock was built in tight waves, most of it between the late 1990s and the 2010s, and that shapes the work: this is first-cycle renovation territory, not historic restoration. We plan for Allen’s clay, its permit timelines, and the long-lead materials that set the calendar. Call (844) 761-8346 for a free estimate on your Allen project.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Allen’s Preferred Home Additions & ADU Company

A second-story addition that matches the existing roofline

Allen homeowners research contractors the way they research appliances, and we expect that. Our evidence is the paperwork: a flat written price before work starts, a signed change order before any change proceeds, and a documented photo record delivered on every visit. That discipline is why projects finish within a few percent of the number the customer agreed to, across 4,000-plus jobs.

We know the Allen blocks that come up again and again: brick traditionals in Twin Creeks and Bethany Ridge, the Watters Crossing lots, and the rebuild pockets near Main and Belmont where 1960s ranches now sit beside new construction. Free second opinions are standing practice, too. Bring a competitor’s written estimate and we’ll review it line by line at no charge before you commit.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Home Additions & ADU Services in Allen

Second Story Additions

A second story is the tightest, most technical addition you can build in Allen, and most 1990s-era plans weren’t engineered to carry one without reinforcement. We start with a structural evaluation, then coordinate the roofline, HVAC load, and stair geometry together. Long-lead windows and stair millwork get ordered early so framing never waits on a delivery.

Second Story Additions

ADU Design & Permitting

Accessory dwelling units in Allen (ZIPs 75013 and 75002) move through city review, and the drawings have to answer setbacks, utility taps, and egress before anything is approved. We coordinate the design package and the permit submission as one scope. Under Clause 1, the price is written before the process starts, so the permitting phase is never a surprise line item.

ADU Design & Permitting

Room Additions

A single-room addition is often where high-end finishes show up hardest: custom built-ins, architectural glass, and specialty casework. Allen’s expansive clay makes the foundation question urgent here, because a new wing that settles away from the original slab will crack at the joint. We budget a foundation evaluation up front and keep the finish schedule tied to the structural one. See our Home Additions & ADU hub for the full build scope.

Room Additions

Garage Conversion ADU

Converting an existing garage is the fastest path to an ADU in Allen, but it isn’t a cosmetic job. The slab, insulation, and utility rough-in all have to meet dwelling standards, and the driveway side gets restored. Expect $30,000 to $80,000, with the number written before any demo begins.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Allen

Finish work is where high-end additions live or die, and we specify the same materials our customers research on their own: ActiveYards for exterior fencing and gates around new ADUs, Belgard and Unilock for the hardscape and patio connections, Tremron pavers where a driveway apron gets rebuilt after a garage conversion. Sourcing depth across fifty-plus vetted brands gives the written quote honest numbers rather than inflated ones. We claim no parts stock and no warehouse. What we do offer is a fast turnaround from the manufacturer on any brand you’ve specified, coordinated into the schedule.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Home Additions & ADU Problems We See in Allen Homes

  • Lead times on custom millwork and architectural glass. On Allen additions, the schedule is set by ordering, not labor. Specialty cabinetry or a custom window package ordered late stalls framing and triggers change orders that were avoidable.
  • Skipped foundation evaluations on 1990s slabs. Twin Creeks and Bethany Ridge homes built in the late 1990s sit on expansive clay that shrinks and swells. Adding weight without piers first is where structural problems start, months after the build.
  • Designer selections made too late. When cabinetry, tile, and glass aren’t locked in before ground breaks, allowances drift from what’s actually specified. That’s a budget overrun, not a finish problem.
  • Compressed timelines that ignore the clay and the material schedule. A realistic Allen addition plans the foundation evaluation and the long-lead orders first. Rushing the start is the usual cause of overruns on high-end work here.

Pricing for Home Additions & ADU in Allen, TX

A framer checking new wall framing on a home addition

Allen’s clay is the cost driver most people don’t budget for. A 20-year-old slab in Twin Creeks or Bethany Ridge often needs piers before an addition or second story can be permitted, and that evaluation is real money. It’s the reason foundation work is often the deciding line in Allen and a straightforward framing job in other DFW suburbs. Here’s the range we quote, in writing, before any work begins:

Project Allen Price Range
Home Addition $45,000 – $130,000
ADU Construction $90,000 – $220,000
Garage Conversion $30,000 – $80,000

Every price is a flat quote with a written scope and written warranty. No change proceeds without a signed change order. Call (844) 761-8346 for a free estimate.

We Also Serve Cities Near Allen

If you’re just over the Allen line, we coordinate the same written-price approach across Fairview, Lucas, Plano, and Murphy. Same trades, same documentation, same second-story and ADU scope. You’ll find the full service and city information on our Home Additions & ADU in Allen page. Each neighbor city gets the same foundation-first planning Allen projects need.

Serving Allen, TX – Our Local Coverage Area

We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Home Additions & ADU in Allen

A newly finished roof with a ridge vent and step flashing

Why Allen Chooses Rowan Construction Group Plano

We set the standard for home additions & ADU in Allen.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Allen

Getting your home additions & ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your home additions & ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home additions & ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Allen Customers Say

Trusted by homeowners across Allen and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled primary bathroom with a soaking tub and walk-in showerA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deckAn open kitchen and dining area after a remodel

More services in Allen

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Additions & ADU in Allen?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Allen.

(844) 761-8346

Request a Free Estimate in Allen

Tell us about your home additions & ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch