







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Garland
If you live in Garland, you already know the housing stock here is older than what you’ll find farther out. The ranches and post-war tract homes across 75040, 75041 and 75042 were built to last, but their kitchens were laid out for a different era. We build written scopes and flat prices for Garland kitchens, from a $14,000 partial refresh to a $45,000 full remodel, and we do it before a single cabinet is ordered. Call (844) 761-8346 to schedule your free estimate.
Why Rowan Construction Group Plano Is Garland’s Preferred Kitchen Remodeling Company

Garland kitchens have a particular set of challenges, and we’ve built our process around them. The expansive black clay under the older neighborhoods means a slab that was level in 1965 may not be level now, so we order a foundation assessment before we quote cabinet work, not after. That single step is the difference between a project that hits its number and one that spirals into a change order.
Under Clause 1 of The Haven Standard, the written price comes before any work starts, every time, on every trade. We answer calls with a live person, send background-checked and uniformed technicians, and leave a documented photo record of what was found and what was done. Every project is backed by our 365-Day Done Right Promise. If it isn’t done right, we make it right.
We think the right way to earn a Garland customer is to name the price on the page in dollars, name the material brands, and describe the process step by step. That’s what the customers we work for here actually want: a number they can compare, a scope they can read, and a record they can keep. You can reach our Kitchen Remodeling team to schedule your free estimate.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Kitchen Remodeling Services in Garland
Kitchen Design & Layout
Garland’s 1950s ranches often have a wall between the kitchen and the dining room, a galley that pinches the work triangle, and a single small window over the sink. We rework the layout around how you cook, and we verify what’s inside that wall (old wiring, cast iron drain lines) before the drawings are final. If you’ve been putting off the call because you don’t know where to start, start with the design.
Cabinet Installation & Refacing
We install KraftMaid and Wellborn cabinets, and we reface where the boxes are sound and the doors are just dated. In Garland’s post-war homes, refacing is often the sensible move: less tear-out, less drywall repair, less disruption. Cabinet installation runs $4,000 – $13,000 in Garland, and the quote tells you exactly what’s included.
Kitchen Island Installation
An island is the single most requested addition in Garland kitchens, and the most common surprise is that the room may not have the clearances for a standard 42-inch aisle. We size the island to your actual floor plan and check slab level first, because an island set on a slab that’s out of level will rock and crack at the seams. A Garland island installation runs $3,000 – $10,000.
Tile, Flooring & Backsplash
Whether it’s a tile backsplash or a full floor replacement, we match the material to the room and the slab beneath it. A backsplash in Garland runs $800 – $2,500. We seal and grout the way a North Texas kitchen needs: this climate swings hot and dry in summer and wet in spring, and the right membrane under the tile head is what prevents a callback two years later.
Trusted Brands We Service in Garland
We source cabinets from KraftMaid and Wellborn, countertops from Cambria and Caesarstone, and fixtures from Kohler and Toto, among fifty-plus vetted brands. We don’t claim to stock parts locally or carry them on a truck; we source to the written scope and the agreed number. That’s how the quote stays honest instead of inflated. Material decisions are made in writing before work starts, so there’s no surprise about which countertop or cabinet line you’re getting.
See the difference
Before
After
Before
After
Before
AfterCommon Kitchen Remodeling Problems We See in Garland Homes
Garland’s core ZIPs (75040, 75041, 75042) sit on expansive black clay that shifts with wet-dry cycles. A kitchen remodel here routinely starts with a foundation assessment, and possibly pier work, before any cabinet or island is set. That step is often skipped in newer suburbs on different soils, and it’s the reason a Garland kitchen can need more prep than it looks like on paper.
Here are the failure modes we plan around in Garland specifically:
- Skipping the foundation check on clay soils. Cabinets get hung, then the slab is found out of level. The fix is a costly change order to shim or re-pier.
- Assuming city permits when the lot is in unincorporated county jurisdiction. That changes inspection sign-off timelines and setback rules for any bump-out or ADU tie-in.
- Underestimating equipment access and material hauls on large or flag lots. A long driveway or soft turf turns a simple cabinet delivery into a hand-carry that blows the draw schedule.
- Aging wiring and original plumbing behind the walls. Galvanized lines, undersized circuits, and no dedicated circuit for the range or dishwasher are routine in homes from this era.
Pricing for Kitchen Remodeling in Garland, TX
Garland kitchens price by scope, and we put the numbers on the page so you can compare before you call. A full kitchen remodel in Garland runs $14,000 – $45,000. A small or partial remodel runs $9,000 – $20,000. Cabinet installation is $4,000 – $13,000, countertop installation is $2,000 – $6,500, backsplash is $800 – $2,500, and island installation is $3,000 – $10,000. What moves the number up or down is foundation work, permit jurisdiction, layout changes, and material tier. Every quote is a flat written price with a written scope before work begins, and no change proceeds without a signed change order. Call (844) 761-8346 for an exact quote. Estimates are free.
We Also Serve Cities Near Garland
We work throughout Garland and the surrounding communities, including Sachse, Rowlett, Richardson and Murphy. If your home sits near the county line or on a larger lot, we scope for the local jurisdiction and access before the quote. See more about our Kitchen Remodeling in Garland and the nearby areas we cover.
Serving Garland, TX – Our Local Coverage Area
We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Kitchen Remodeling in Garland

Not always, but it’s the standard step for older Garland homes on expansive clay. If the slab has moved, hanging cabinets and setting an island on it will fail inspection or crack at the seams. Skipping the check to save a line item is the most common way a Garland kitchen budget gets blown. Call (844) 761-8346 to schedule a free estimate and a foundation review.
County-jurisdiction lots carry different setback rules and inspection sign-off timelines than city permits. If your Garland home sits in unincorporated county, add time to the schedule for the different review process. We verify jurisdiction before quoting so the timeline you’re given reflects the actual review authority. Call (844) 761-8346 for a free estimate that accounts for your lot.
Usually yes, but the island has to be sized to the actual clearances. A standard 42-inch aisle is the minimum; many Garland galley kitchens don’t have it without removing a wall. We size the island to your floor plan and check slab level first. Island installation in Garland runs $3,000 – $10,000. Call (844) 761-8346 for a free estimate.
A flat price, a written scope, and a written warranty. That’s the Haven Standard’s Clause 1, and it applies to every Garland job. No change proceeds without a signed change order, so the number you agree to is the number you pay unless you approve a change. Call (844) 761-8346 for a free written estimate.
Brand choice determines construction, box material, and the warranty that travels with the cabinets. KraftMaid and Wellborn are both sourced through our vetted brand list, so the quote reflects real product specs instead of a substitute at install. If you bring a competitor’s quote, we’ll review it line by line at no charge. Call (844) 761-8346 for a free estimate.
Every Garland kitchen project we scope starts with the same step: the written price before anyone picks up a tool. Our technicians have up to 19 years of experience, and every visit includes a documented photo record. If your Garland home is due for a kitchen that fits how you actually live, call (844) 761-8346 to schedule your free estimate.
Written by the team at Rowan Construction Group.












