A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Kitchen Remodeling · Murphy, TX

Kitchen Remodeling in Murphy - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A galley kitchen opened up to the dining room with a new peninsula
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
A single-story rear room addition with tall windows and a new patio
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Kitchen Remodeling Across Murphy

If you’re planning a kitchen remodel in Murphy, the number you want first is this: most full kitchen remodels in 75094 run $14,000 to $45,000, and on the high-end tier that price is set less by labor than by the lead time on what you order. We work throughout Murphy and know the streets here well enough to plan around how this town actually builds. Calling (844) 761-8346 gets you a written, flat price before anyone orders a cabinet or lifts a pry bar. That’s our starting point, every time.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Murphy’s Preferred Kitchen Remodeling Company

Installers leveling a new base cabinet during a kitchen remodel

Murphy is a small, fully built-out Collin County suburb, and that shapes how we approach every kitchen here. Because lot value drives pricing rather than the structure on it, the finish tier on your street is often set by the custom rebuilds going up next door, not by the original builder grade your house came with in the 1990s. We plan Murphy kitchens to that reality: allowances written honestly for the tier the neighborhood has moved to, and a written scope that survives the moment a wall turns out to be load-bearing.

Our technicians have up to 19 years of experience, are background-checked and uniformed, and a live person answers calls around the clock. Every visit comes with a documented photo record as a standard deliverable, not an add-on. We also offer a free second opinion on any written estimate: bring a competitor’s quote to a Murphy kitchen walk and we’ll review it line by line at no charge.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Kitchen Remodeling Services in Murphy

Full Kitchen Remodeling

A full remodel in a Murphy brick ranch typically means opening a closed-off galley, replacing a dropped soffit, and untangling plumbing and electrical that were never designed for today’s layout. Before demolition, we open the rough-in and pull permits so the third-party inspector can confirm what’s inside the walls before any of it gets closed up. In Murphy, where a teardown-rebuild and an occupied-home renovation can share a single street, that sequencing matters more than the demo itself.

Cabinets & Countertops

Cabinetry runs $4,000 to $13,000 installed, and countertops add $2,000 to $6,500. We source through vetted brands including KraftMaid and Wellborn for cabinets and Cambria and Caesarstone for quartz surfaces, which is what keeps the quote honest instead of inflated. The order goes out only after the layout is final and the structural review is signed off, never before.

Kitchen Design & Layout

Layout decisions drive everything downstream, including lead times. When a homeowner wants an island where the peninsula sits, the answer depends on whether that wall is load-bearing, which means an engineered beam and a plan drawn to match before anything is ordered. We fix that scope in writing, so the design tier your Murphy neighborhood has moved to is priced at signing rather than discovered mid-project.

Backsplash, Tile & Flooring

Backsplash work runs $800 to $2,500. On older Murphy slabs, tearing out the tile often reveals subfloor or slab issues, because North Texas blackland clay expands and contracts with the wet-dry cycle and moves the slab underneath. We set allowances and contingencies in writing before demolition day so floor surprises don’t rewrite the budget after the fact.

Explore all of this through our Kitchen Remodeling team, or see the full scope of Kitchen Remodeling in Murphy.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Murphy

Murphy kitchens often call for exterior touches that tie the remodel to the lot: a paver patio off the new kitchen, a fence line reset during a backyard rework. We source those materials through vetted brands like Belgard, Unilock, Tremron, and ActiveYards, and we name the brand and spec in the written quote rather than leaving it vague. We don’t claim to stock parts locally; what we do is specify the exact product and hold the written price to it. When the material is named, the order and the schedule are predictable.

Common Kitchen Remodeling Problems We See in Murphy Homes

  • Cabinets and quartz ordered before the layout is finalized. In Murphy’s built-out market, a load-bearing wall discovery or a moved rough-in forces a change order and a re-order, and the new order lands at the back of a long lead-time queue. We hold the order until the layout is locked.
  • Allowances written too thin for the street’s tier. When the rebuild two doors down has set Cambria and architectural glass as the neighborhood standard, a thin allowance blows the budget mid-project instead of at signing. We price allowances to the tier Murphy has actually moved to.
  • Occupied-home sequencing ignored. Many Murphy remodels happen around a family still living in the house. Without a temporary kitchen plan and dust containment, trades can’t work efficiently and the draw schedule slips. We plan the phases around your household.
  • Slab and subfloor movement surfacing after tile comes up. The blackland clay under Murphy slabs shifts with the wet-dry cycle, so flooring surprises are common in 1980s to 2000s homes. Contingencies set in writing before demo keep those from derailing the budget.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Kitchen Remodeling in Murphy, TX

A remodeled hall bathroom with subway tile and a floating vanity

Here’s what Murphy kitchens actually cost, in dollars you can compare side by side. A typical full remodel runs $14,000 to $45,000; a small or partial remodel $9,000 to $20,000. These are line-item ranges, and the tier your neighborhood has moved to is what determines where in that range you land. Every project gets a flat written price and a written scope before work begins, and no change proceeds without a signed change order. That discipline is why projects finish within a few percent of the number you agreed to.

Service Murphy Price Range
Kitchen Remodel $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Kitchen Island Installation $3,000 – $10,000
Backsplash Installation $800 – $2,500

Call (844) 761-8346 to schedule your free estimate and lock in a written number.

We Also Serve Cities Near Murphy

Along with Murphy, we work in Sachse, Wylie, Fairview, and Lucas. Each has its own housing pattern; Wylie and Sachse still have active new-build growth, while Murphy’s built-out character makes it a renovation-and-replacement market, and that difference shows up in how we plan and price a kitchen. Wherever you are nearby, the written price and signed change-order discipline travel with the job.

Serving Murphy, TX – Our Local Coverage Area

We serve Murphy and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Kitchen Remodeling in Murphy

A garage converted into a guest room and home office

Ready to Price Your Murphy Kitchen?

Murphy’s built-out, lot-value-driven character makes a kitchen remodel here a different job than in the new-build suburbs next door, and the number that matters is the one in writing before ordering starts. We put it there: a flat price, a written scope, a documented photo record, and the 365-Day Done Right Promise behind the work. Call (844) 761-8346 for your free estimate. We’d be glad to walk your kitchen with you.

Written by the team at Rowan Construction Group Plano.

Why Murphy Chooses Rowan Construction Group Plano

We set the standard for kitchen remodeling in Murphy.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Murphy

Getting your kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Murphy Customers Say

Trusted by homeowners across Murphy and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new concrete driveway with a paver borderNew architectural shingles with a clean valleyA new casement window over a kitchen sinkNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deck

More services in Murphy

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Kitchen Remodeling in Murphy?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Murphy.

(844) 761-8346

Request a Free Estimate in Murphy

Tell us about your kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch