







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Murphy
If you’re planning a kitchen remodel in Murphy, the number you want first is this: most full kitchen remodels in 75094 run $14,000 to $45,000, and on the high-end tier that price is set less by labor than by the lead time on what you order. We work throughout Murphy and know the streets here well enough to plan around how this town actually builds. Calling (844) 761-8346 gets you a written, flat price before anyone orders a cabinet or lifts a pry bar. That’s our starting point, every time.
Why Rowan Construction Group Plano Is Murphy’s Preferred Kitchen Remodeling Company

Murphy is a small, fully built-out Collin County suburb, and that shapes how we approach every kitchen here. Because lot value drives pricing rather than the structure on it, the finish tier on your street is often set by the custom rebuilds going up next door, not by the original builder grade your house came with in the 1990s. We plan Murphy kitchens to that reality: allowances written honestly for the tier the neighborhood has moved to, and a written scope that survives the moment a wall turns out to be load-bearing.
Our technicians have up to 19 years of experience, are background-checked and uniformed, and a live person answers calls around the clock. Every visit comes with a documented photo record as a standard deliverable, not an add-on. We also offer a free second opinion on any written estimate: bring a competitor’s quote to a Murphy kitchen walk and we’ll review it line by line at no charge.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Kitchen Remodeling Services in Murphy
Full Kitchen Remodeling
A full remodel in a Murphy brick ranch typically means opening a closed-off galley, replacing a dropped soffit, and untangling plumbing and electrical that were never designed for today’s layout. Before demolition, we open the rough-in and pull permits so the third-party inspector can confirm what’s inside the walls before any of it gets closed up. In Murphy, where a teardown-rebuild and an occupied-home renovation can share a single street, that sequencing matters more than the demo itself.
Cabinets & Countertops
Cabinetry runs $4,000 to $13,000 installed, and countertops add $2,000 to $6,500. We source through vetted brands including KraftMaid and Wellborn for cabinets and Cambria and Caesarstone for quartz surfaces, which is what keeps the quote honest instead of inflated. The order goes out only after the layout is final and the structural review is signed off, never before.
Kitchen Design & Layout
Layout decisions drive everything downstream, including lead times. When a homeowner wants an island where the peninsula sits, the answer depends on whether that wall is load-bearing, which means an engineered beam and a plan drawn to match before anything is ordered. We fix that scope in writing, so the design tier your Murphy neighborhood has moved to is priced at signing rather than discovered mid-project.
Backsplash, Tile & Flooring
Backsplash work runs $800 to $2,500. On older Murphy slabs, tearing out the tile often reveals subfloor or slab issues, because North Texas blackland clay expands and contracts with the wet-dry cycle and moves the slab underneath. We set allowances and contingencies in writing before demolition day so floor surprises don’t rewrite the budget after the fact.
Explore all of this through our Kitchen Remodeling team, or see the full scope of Kitchen Remodeling in Murphy.
Trusted Brands We Service in Murphy
Murphy kitchens often call for exterior touches that tie the remodel to the lot: a paver patio off the new kitchen, a fence line reset during a backyard rework. We source those materials through vetted brands like Belgard, Unilock, Tremron, and ActiveYards, and we name the brand and spec in the written quote rather than leaving it vague. We don’t claim to stock parts locally; what we do is specify the exact product and hold the written price to it. When the material is named, the order and the schedule are predictable.
Common Kitchen Remodeling Problems We See in Murphy Homes
- Cabinets and quartz ordered before the layout is finalized. In Murphy’s built-out market, a load-bearing wall discovery or a moved rough-in forces a change order and a re-order, and the new order lands at the back of a long lead-time queue. We hold the order until the layout is locked.
- Allowances written too thin for the street’s tier. When the rebuild two doors down has set Cambria and architectural glass as the neighborhood standard, a thin allowance blows the budget mid-project instead of at signing. We price allowances to the tier Murphy has actually moved to.
- Occupied-home sequencing ignored. Many Murphy remodels happen around a family still living in the house. Without a temporary kitchen plan and dust containment, trades can’t work efficiently and the draw schedule slips. We plan the phases around your household.
- Slab and subfloor movement surfacing after tile comes up. The blackland clay under Murphy slabs shifts with the wet-dry cycle, so flooring surprises are common in 1980s to 2000s homes. Contingencies set in writing before demo keep those from derailing the budget.
See the difference
Before
After
Before
After
Before
AfterPricing for Kitchen Remodeling in Murphy, TX

Here’s what Murphy kitchens actually cost, in dollars you can compare side by side. A typical full remodel runs $14,000 to $45,000; a small or partial remodel $9,000 to $20,000. These are line-item ranges, and the tier your neighborhood has moved to is what determines where in that range you land. Every project gets a flat written price and a written scope before work begins, and no change proceeds without a signed change order. That discipline is why projects finish within a few percent of the number you agreed to.
| Service | Murphy Price Range |
|---|---|
| Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
| Backsplash Installation | $800 – $2,500 |
Call (844) 761-8346 to schedule your free estimate and lock in a written number.
We Also Serve Cities Near Murphy
Along with Murphy, we work in Sachse, Wylie, Fairview, and Lucas. Each has its own housing pattern; Wylie and Sachse still have active new-build growth, while Murphy’s built-out character makes it a renovation-and-replacement market, and that difference shows up in how we plan and price a kitchen. Wherever you are nearby, the written price and signed change-order discipline travel with the job.
Serving Murphy, TX – Our Local Coverage Area
We serve Murphy and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Kitchen Remodeling in Murphy

Lead times on cabinets, quartz, and specialty finishes set the calendar on a high-end Murphy kitchen, not labor. The actual install may take days; the materials behind it can take weeks, and in a fully built-out market where neighbors are rebuilding to a higher tier, the order is what drives the schedule. Call (844) 761-8346 for a written schedule that reflects real lead times.
A flat written price, a written scope, and a confirmed layout including any structural review should all be signed before a single cabinet or slab is ordered. That’s the whole point of our written-price-first approach. A change order gets signed before anything re-orders, so a load-bearing surprise never sends you to the back of the queue unaware. Call (844) 761-8346 for your free estimate.
Not every Murphy kitchen remodel needs a permit, but anything touching structure, plumbing, electrical, or the rough-in for a new hood almost always does. We pull the permits so a third-party inspector can confirm what’s inside the walls before they’re closed. That inspection step is part of what a written scope is for. Call (844) 761-8346 to talk through your specific project.
Often yes, but whether you can depends on whether the wall you’d remove is load-bearing, which many Murphy ranches have at exactly that spot. That means a structural review and an engineered beam first, and the island only gets ordered once the layout is finalized. Call (844) 761-8346 for a free estimate that starts with that answer.
Allowances are the written dollar figures set for items you’ll choose later, like tile, fixtures, and finishes, and on a Murphy kitchen they’re written to the tier the street has actually moved to rather than the original builder grade. Setting them right at signing is what keeps a Cambria or architectural-glass selection from blowing the budget mid-project. Call (844) 761-8346 for a free second opinion on any written estimate.
Ready to Price Your Murphy Kitchen?
Murphy’s built-out, lot-value-driven character makes a kitchen remodel here a different job than in the new-build suburbs next door, and the number that matters is the one in writing before ordering starts. We put it there: a flat price, a written scope, a documented photo record, and the 365-Day Done Right Promise behind the work. Call (844) 761-8346 for your free estimate. We’d be glad to walk your kitchen with you.
Written by the team at Rowan Construction Group Plano.












