A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Kitchen Remodeling · Wylie, TX

Kitchen Remodeling in Wylie - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A new paver pool deck
A freestanding soaking tub in a remodeled primary bathroom
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Kitchen Remodeling Across Wylie

Most kitchens in Wylie don’t need rebuilding. They need the builder’s original choices replaced, in the right order, by someone who has checked what’s under the floor first. Rowan Construction Group Plano works with homeowners across Wylie, TX on exactly that kind of project: a written flat price before anything gets ordered, a floor-flatness check before a single cabinet box is hung, and a signed change order before any change moves. Call (844) 761-8346 and we’ll schedule a free estimate at your kitchen, on your street, with a written number in your hand.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Wylie’s Preferred Kitchen Remodeling Company

Installers leveling a new base cabinet during a kitchen remodel

We’ve built a reputation in Wylie on what we show, not what we say. Every estimate is a written scope and a flat price. Every visit includes a photo record of what we found, delivered as a standard part of the job rather than an add-on. Our technicians have up to 19 years of experience, and they’re background-checked and uniformed before they arrive at your Wylie door.

Wylie homeowners read the three-star reviews and compare numbers, and we expect that. Bring a competitor’s written quote and we’ll review it line by line at no charge through our Free Second Opinion. We answer calls with a live person at all hours. When we tell you a cabinet run needs to wait on the rough-in inspection, that’s the small-town permitting rhythm in Wylie we’ve learned to plan around, not a delay we invented.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Kitchen Remodeling Services in Wylie

Our Kitchen Remodeling team handles the full scope, but most Wylie projects land in three places: cabinets and countertops, design and layout, and small or partial remodels where the footprint stays put.

Cabinets & Countertops

This is the first thing most first-owners in Wylie replace. Builder-grade laminate and painted MDF give way to KraftMaid or Wellborn cabinets set against Cambria or Caesarstone. Before any new base goes in, we check the slab for the humps and dips that Blackland Prairie clay leaves behind.

Kitchen Design & Layout

Changing a layout in a 2005 or 2017 Wylie subdivision home means working around existing plumbing walls and venting, and coordinating with the Wylie inspection timeline so the rough-in is signed off before cabinets are ordered. We plan the sequence, then you sign the scope.

Small & Partial Kitchen Remodels

Plenty of Wylie kitchens only need the counter, backsplash and hardware refreshed. A backsplash runs $800 to $2,500 here. A countertop swap runs $2,000 to $6,500. Those partial jobs get the same written price and the same floor check as a full remodel.

Backsplash, Tile & Flooring

Tile work in Wylie homes has to survive a clay soil that moves with the seasons, so we set tile over a properly prepared substrate rather than over a moving slab. Floors and backsplashes get defined in the written scope before demo starts.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Wylie

We work across a depth of vetted material brands so the written quote lands on honest numbers instead of padded ones. KraftMaid and Wellborn for cabinets, Cambria and Caesarstone for counters, Kohler and Toto for fixtures. Where a homeowner is exploring prefab or panelized options, we can talk through Dvele and Plant Prefab as reference points for what’s available in that space. We don’t claim to stock parts locally; the scope names the brands, the quote names the price, and we order against the written list so nothing arrives that wasn’t approved.

Common Kitchen Remodeling Problems We See in Wylie Homes

  • Slab movement under new cabinets. Blackland Prairie clay shrinks and swells between wet springs and dry summers. New cabinets and quartz tops crack or gap when the floor isn’t checked first, which is why we measure flatness before the order.
  • Ordering ahead of the inspection. Cabinets and counters ordered before the rough-in sign-off trigger a change order when the Wylie inspector calls for a vent or outlet to move. We sequence the job so that doesn’t happen.
  • Cutting into a live builder warranty. Homes inside the first-owner warranty window can lose coverage when structural or waterproofed assemblies get cut without written approval. We check the warranty terms before the scope is drawn.
  • Treating it as a cosmetic swap. A kitchen is a system: slab, plumbing wall, venting, and cabinet base all meet at the same spot. Skipping the underlying conditions turns a fast job into a callback after the first dry summer.

Pricing for Kitchen Remodeling in Wylie, TX

A wood double vanity with two mirrors after a bathroom remodel

A full kitchen remodel in Wylie runs $14,000 to $45,000. A small or partial remodel runs $9,000 to $20,000. What moves the number is scope: how many cabinet runs get replaced, whether the layout shifts, and whether the slab needs correction before the new base is set. Here’s the line-item breakdown we write into the quote, so you can screenshot it and compare:

Scope Typical Wylie Range
Kitchen Remodel $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000

Every Wylie quote is a flat written price with a written scope before work starts. Clause 1 of the Haven Standard is the whole point: the number goes on paper first, and no change proceeds without a signed change order. That discipline is why projects finish within a few percent of the agreed cost. Call (844) 761-8346 for a free estimate in Wylie.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Why Wylie Kitchens Need a Floor Check First

Wylie’s housing stock tells the story. Nearly all of it was built between the 1990s and the 2020s, brick-veneer and slab-on-grade, laid over former Blackland Prairie farmland that was graded and built on as the Collin County growth corridor pushed east from Plano. That clay soil flexes dramatically between wet springs and dry summers, and the slab flexes with it. In a first-owner remodel, the existing builder cabinets and laminate come out, and the slab underneath often shows slight humps or dips. The installer has to measure flatness and possibly float the subfloor before setting new bases. The usual fix is to address the slab or use adjustable legs and shims, then proceed with the written scope. Skip that step and you get cabinet doors that rub and countertop seams that open within a single season.

That same first-owner reality shapes the warranty question. Plenty of kitchens in the newer subdivisions on Wylie’s east side are still inside the first-owner builder warranty window, and cutting into a structural or waterproofed assembly without written approval can void it. We draw the scope around what the warranty protects before anything is ordered. Wylie also runs on a small-town permitting and inspection culture despite the explosive subdivision growth, and out-of-town builders who treat it like a big-city jurisdiction get surprised by the inspection expectations. We plan the rough-in sign-off into the schedule instead of finding out about it later.

Down near the historic downtown along Ballard and Brown streets, the stock is older and more modest ranch homes, and the work there reflects that: smaller layouts, tighter plumbing walls, and systems that get checked before the cabinet run is ordered. That range of housing stock is part of what makes Wylie kitchens a first-owner upgrade problem, not a historic renovation problem. If you’re comparing kitchens across Wylie, the comparison should start with what’s under the floor.

We Also Serve Cities Near Wylie

We work across the Collin and Dallas county line close to Wylie’s edges. Homeowners in Sachse, Murphy, Rowlett and Fairview get the same written flat price, the same photo record and the same floor check before cabinets are hung. If you’re just over the Wylie city limit, tell us which road or subdivision you’re on and we’ll get a Wylie-adjacent quote back to you in writing.

Serving Wylie, TX – Our Local Coverage Area

We serve Wylie and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Kitchen Remodeling in Wylie

Get Your Written Kitchen Remodeling Price in Wylie

A finished backyard cottage with a small covered porch

Every quote in Wylie is a flat written price with a written scope, and the 365-Day Done Right Promise sits behind the work. The Free Second Opinion stands if you already have a competitor’s written estimate. Call (844) 761-8346 to schedule your free estimate in Wylie, TX, and we’ll measure, check the slab, and put a number on paper before a single tool leaves the truck.

Written by the team at Rowan Construction Group Plano.

Why Wylie Chooses Rowan Construction Group Plano

We set the standard for kitchen remodeling in Wylie.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Wylie

Getting your kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Wylie Customers Say

Trusted by homeowners across Wylie and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A garage converted into a guest room and home officeNew architectural shingles with a clean valleyA new casement window over a kitchen sinkA new white vinyl privacy fence with a double gateA remodeled hall bathroom with patterned floor tile and painted wallsA new roof with clean valleys and new flashing

More services in Wylie

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Kitchen Remodeling in Wylie?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Wylie.

(844) 761-8346

Request a Free Estimate in Wylie

Tell us about your kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch