







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Rowlett
Kitchen remodeling in Rowlett typically runs $14,000 – $45,000 for a full tear-out and rebuild, and most of that spread comes down to what’s behind the drywall once cabinets come off. If you live in Rowlett and own a home built in the 1980s or 1990s, that wall is where your budget actually gets decided. We work in Rowlett constantly and know the housing stock here, from the 75088 streets off Dalrock Road to the 75089 neighborhoods near Liberty Grove. Call (844) 761-8346 and we’ll schedule a walkthrough, inspect the rough-in, and put a flat written price in front of you before anyone touches a hammer.
Why Rowan Construction Group Plano Is Rowlett’s Preferred Kitchen Remodeling Company

Rowlett is not a new-build market. It’s a fully developed city along the Lake Ray Hubbard shoreline, and most of the homes we walk into are 20 to 40 years old and need renovation, not construction. That distinction matters because a Rowlett kitchen remodel is really an excavation of what a 1980s or ’90s builder left in the wall. Our technicians have up to 19 years of experience reading that situation on sight, and a strong local reputation among Rowlett homeowners who’ve had a wall opened and hated the surprise.
Response to Rowlett is direct. Our crews serve Rowlett daily, and a live person answers the phone around the clock when something comes up mid-project. Every customer gets a documented photo record on every visit as a standard deliverable, and every job is covered by our 365-Day Done Right Promise. That’s the record we leave behind, not a handshake.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Kitchen Remodeling Services in Rowlett
We handle the full scope of Kitchen Remodeling, and every trade involved is quoted flat with a written scope before work begins.
Full Kitchen Remodeling
A full Rowlett kitchen remodel means gutting to studs, relocating plumbing and electrical as needed, and rebuilding with new cabinets, counters, and floor. On 1980s stock we inspect first to map what’s behind the wall before demolition starts. That inspection is the difference between a $14,000 job and a $30,000 job with no warning.
Kitchen Design & Layout
Most Rowlett kitchens were built with a closed-off footprint that doesn’t match how families cook now. We redesign the flow around real use, whether that’s opening the wall to the living room or reworking the island to fix a work-triangle dead zone. The layout is drawn and priced in writing before demolition, not improvised on site.
Cabinet Installation & Refacing
Cabinet installation in Rowlett runs $4,000 – $13,000 depending on whether the existing boxes have the studs to carry new uppers. On homes near Lake Ray Hubbard and the surrounding shoreline, we check framing at the wall for water intrusion from old exterior penetrations before hanging anything. Refacing can save budget when the boxes are solid and the layout works.
Countertops, Backsplash & Flooring
Countertop installation in Rowlett runs $2,000 – $6,500, and we name the brand on the quote. Backsplash work runs $800 – $2,500. Tile and flooring get pulled when the old waterproofing behind them has failed, which turns up more often than people expect in 1980s sink walls. All of it is priced as a written line item before install.
Trusted Brands We Service in Rowlett
We source cabinets from KraftMaid and Wellborn, countertops from Cambria and Caesarstone, and fixtures from Kohler and Toto. For builders working with modern factory-built or panelized components, we’ve worked around Dvele and Plant Prefab systems too, so the cabinet and counter install coordinates with the structure rather than fighting it. We don’t claim to stock brand parts locally; what we do is size and order to spec and price the material line honestly in the written quote, so you’re not paying inflated numbers to cover someone else’s margin. That’s how a $2,000 – $6,500 countertop line stays at $2,000 – $6,500.
See the difference
Before
After
Before
After
Before
AfterCommon Kitchen Remodeling Problems We See in Rowlett Homes
- Aluminum branch wiring. Homes built through the 1980s often have aluminum wiring feeding kitchen circuits, and it doesn’t play well with the load a modern kitchen draws. When it turns up mid-demolition, it balloons the budget unless it’s caught in the pre-inspection and written into the contract.
- Failed waterproofing behind old tile. The original membrane behind 1980s backsplashes and tub surrounds has usually failed, and the mold and subfloor damage it hides only surfaces after cabinets come out. We open a small test area first so the repair is priced before it’s a crisis.
- Undersized framing in load-bearing walls. When a Rowlett homeowner wants to open a wall between kitchen and living room, the framing that’s there often won’t carry the header a permit inspector will demand. That means reframing and sometimes engineering, priced up front so the sign-off doesn’t stall the job.
- Corroded galvanized drain lines. In a typical Rowlett kitchen remodel, pulling drywall around a 1980s sink wall reveals pitted galvanized drains and no proper waterproofing at all. A qualified local pro opens a small inspection hole to map the rough-in, then prices the new drain assembly and membrane as written allowances before demolition. That way the homeowner approves each surprise in writing, not in a phone call after the wall is already open.
Pricing for Kitchen Remodeling in Rowlett, TX

Here’s what kitchen work actually costs in the Rowlett market, with no “call for a quote” runaround. These are flat written ranges, and under Clause 1 of The Haven Standard the price is set before anyone starts. What moves you up or down is square footage, whether the plumbing and electrical relocate, and what the pre-inspection finds behind the wall. Lake-area homes near Lake Ray Hubbard can add drainage and moisture remediation that inland tract homes never see, and expansive clay soils mean we check the slab and subfloor before cabinets land on a floor that might heave.
| Service | Rowlett Price Range |
|---|---|
| Kitchen Remodel (full) | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
Ask about our Free Second Opinion: bring a competitor’s written estimate and we’ll review it line by line at no charge. A flat written quote is standard here, and no work proceeds on a change until the change order is signed.
We Also Serve Cities Near Rowlett
Our crews serve Rowlett and the surrounding communities, including Sachse, Garland, Wylie, and Rockwall. If you’re just over the lake or a few exits up the highway, the same written-price process applies. Call and we’ll confirm coverage and schedule a walkthrough at your address.
Serving Rowlett, TX – Our Local Coverage Area
We serve Rowlett and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Kitchen Remodeling in Rowlett

Because a 1980s Rowlett wall was built to 1980s code, and aluminum branch wiring, undersized framing, and missing waterproofing were all standard then but are costly to bring up to current code now. When those turn up mid-demolition, they balloon a budget that wasn’t written for them. We pre-inspect and price them as written allowances before demolition so they don’t arrive as a surprise. Call (844) 761-8346 for a walkthrough.
We price them in writing and we don’t touch the change until you’ve signed the change order. The process starts with a small inspection hole to map the rough-in, so most of what’s behind the wall is known before demolition begins. Anything that surfaces after that gets a written change order with a dollar amount and a scope, and work waits until you approve it. That discipline is why our projects finish within a few percent of the agreed price.
Yes, most Rowlett kitchen remodels require a permit once you’re moving plumbing, electrical, or load-bearing walls. The permit triggers inspection sign-offs at framing, plumbing, and electrical rough-in, and that’s usually where undersized framing or bad wiring gets flagged. We pull the permit and handle the inspections as part of the job. Call for a free estimate and we’ll explain exactly what your scope triggers.
A full kitchen remodel in Rowlett runs $14,000 – $45,000, a small kitchen remodel runs $9,000 – $20,000, and cabinet installation alone runs $4,000 – $13,000. Countertops are $2,000 – $6,500, backsplash work is $800 – $2,500, and a kitchen island install is $3,000 – $10,000. Call (844) 761-8346 for an exact quote – estimates are free.
Homes near the Lake Ray Hubbard shoreline deal with drainage, moisture, and floodplain permitting that inland Rowlett tract homes never face. That can mean floodplain review before a permit clears, moisture remediation behind exterior walls, and checking that old penetrations haven’t let water into the framing. It’s why we inspect the wall and the slab before pricing a lake-area kitchen. Call us to schedule a free estimate and we’ll walk the site with you.
Ready to put a real number on your Rowlett kitchen? Call (844) 761-8346 for a free estimate. We’ll inspect what’s behind the wall, write the price in dollars, and back the work with our 365-Day Done Right Promise – every visit documented with a photo record, every change priced and signed before we pick up a tool.
Written by the team at Rowan Construction Group.












