







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHome Additions & ADU Near You in Plano, TX
Home additions and ADU (accessory dwelling unit) work in Plano, TX is quoted with a flat written price before anyone picks up a tool. That price goes out as a fixed number with a written scope and a written warranty, so you can screenshot it and compare. We’re a construction contractor that connects Plano homeowners with background-checked, uniformed independent professionals, and our phone is answered by a live person 24/7. Call (844) 761-8346 and you’ll get a written estimate for your addition, not a callback promise.
Plano is full of the same fix: families who bought into a 1990s or 2000s subdivision like Willow Bend, Deerfield or Kings Ridge and now need more square footage, but the lot won’t take a second story without tree and setback complications. A ground-level primary suite addition or a detached ADU in the side or rear yard is usually the cleaner answer. We’re called for both, and for the in-law suite and home office conversions that sit between them.

Fast, Local Home Additions & ADU
Most Plano inquiries get a written price within a few business days of the site walk, and the site walk itself is usually scheduled within the same week. For additions in the range of 400 to 800 square feet, expect the pricing conversation to start once we’ve seen the foundation condition, existing utility runs and the alley or side-yard access. ADU pricing depends on whether you’re building detached or converting an existing garage, and we price both.
Additions aren’t an emergency trade, so we won’t pretend a slab pour is a burst pipe. But when a sub-issue turns urgent – a foundation recommendation from the engineer that changes the scope, a permit comment that stalls the schedule – you reach a live person, not a voicemail box. Our technicians have up to 19 years of experience, and every visit produces a documented photo record you keep. No work proceeds on a change until the change order is signed; that’s the discipline that has kept our projects within a few percent of the agreed cost across 4,000-plus jobs.
Areas We Cover
Plano sits at the center of a tight pocket of Collin and Dallas County suburbs, and the additions questions are similar across all of them: tight side yards, mature trees that shade a slab differently than a builder expected, and HOA guidelines on rear-yard structures. We work with homeowners in Plano, Richardson, Allen, Murphy, Fairview, Lucas, Sachse and McKinney.
If you’re outside that ring, call anyway and we’ll tell you plainly whether an addition project makes sense in your area. For a deeper look at how we approach the build, see our Home Additions & ADU in Plano page, and start with our home page for the full scope of trades.

What Does an ADU or Home Addition Cost in Plano?
Detached ADUs in Plano typically run $140,000 to $260,000 depending on size and finish level, while a 400-square-foot primary suite addition commonly prices between $95,000 and $150,000. Garage conversions are the lowest-cost ADU path, usually $65,000 to $120,000. Those ranges reflect Plano’s current permit and inspection environment, engineering costs for the expansive clay soils under most of the city, and the finish level typical for this market.
| Project type | Typical Plano range | What drives the number |
|---|---|---|
| Primary suite addition (300-500 sq ft) | $95,000 – $150,000 | Slab tie-in, plumbing relocation, roofline integration |
| Detached ADU (600-900 sq ft) | $140,000 – $260,000 | Separate utilities, foundation, alley access, finish level |
| Garage conversion ADU | $65,000 – $120,000 | Insulation, egress, kitchen or bath rough-in, exterior door |
| Second-story addition | $180,000 – $320,000 | Structural reinforcement, stair, code updates to the existing home |
| Plans and engineering | $4,000 – $12,000 | Survey, structural drawings, permits |
Plano’s clay soils are the reason foundation engineering isn’t optional here. We’ve seen additions in the Willow Bend and Deerfield areas where the soil movement required a drilled pier foundation instead of a standard slab – a decision made after soil testing, not before. That’s the kind of cost that only shows up if the contractor tested. Under Clause 1 of the Haven Standard, that cost gets written into your quote before anyone starts, and won’t appear as a surprise later.
Why Plano ADUs Are Priced Differently Than a Standard Addition
A detached ADU has its own utility service, its own foundation, and its own roofline, which means it carries the engineering cost of a small house on a small lot. A garage conversion shares the existing structure and the existing services, so the price drops. Most Plano homeowners we work with ultimately land on either a garage conversion or a ground-level suite addition, depending on whether they want a rental income path or just more room for family.
FAQs
How fast can you start a home addition in Plano?
Design and permits typically take 6 to 12 weeks in Plano, and construction starts shortly after permit approval. The written price comes before any of that, so you know the number before committing to the design phase. Call (844) 761-8346 to schedule the site walk and get the range on paper.
Do you serve my area near Plano?
Yes, if you’re in Plano, Richardson, Allen, Murphy, Fairview, Lucas, Sachse or McKinney. Those are the cities we work with most often on additions and ADUs, and the permit environment and typical lot size are similar across all of them. Call (844) 761-8346 and we’ll confirm your address and give you a straight answer.
What should I expect in an ADU or addition quote in Plano?
You should expect a flat price, a written scope and a written warranty – not a range and not “call for a quote.” Our quotes break out line items by trade, name the brands (KraftMaid and Wellborn cabinets, Cambria and Caesarstone countertops, Kohler and Toto fixtures), and list what’s not included so you’re not discovering it later. Call (844) 761-8346 for a free estimate.
Can I reach someone after hours about an addition?
Yes. Our phone is answered by a live person 24/7, and we don’t route you to voicemail at 9pm on a Sunday. After-hours calls are usually about scheduling, permit status or a scope question; actual construction issues are triaged the next business morning. If it’s an active structural concern, say so and we’ll escalate. Call (844) 761-8346 any hour.
Why Homeowners in Plano Choose Us for Additions
Three things separate us from a typical addition contractor. The first is the written price before work starts, on every trade from kitchen remodeling through additions and ADUs. The second is the change order discipline: no work proceeds on a change until the change order is signed, which is how projects finish within a few percent of the number the customer agreed to. The third is the 365-Day Done Right Promise, backed by The Haven Standard rather than a handshake.
- Written price before any work starts – flat, with written scope and warranty
- Signed change orders required before any scope change
- Free second opinion on any written estimate – bring a competitor’s quote and we’ll review it line by line
- Documented photo record on every visit, included not optional
- Background-checked, uniformed technicians, live person answering calls
- Sourcing across 50-plus vetted brands so the quote is based on real material costs
Bring us a competitor’s written estimate and we’ll go through it line by line at no charge. That free second opinion is a standing offer, and it’s saved more than one Plano homeowner from a quote that left out the soil testing or the permit fees.
Get a Written Price for Your Addition
Call (844) 761-8346 for a free estimate. We’ll schedule a site walk, look at the actual condition of the foundation, utility runs and access, and put a written price in front of you – a number you can compare, not a promise. Estimates are free, the price is in writing before any work starts, and someone is available to answer your call any hour of the day.
Written by the team at Rowan Construction Group Plano, serving Plano and nearby areas.
What Our Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."
- Emil R."Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."
- Reggie O.












