A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Home Additions & ADU · Plano, TX

Home Additions & ADU in Plano - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Home Additions & ADU Across Plano

If you’re adding a room, a second story, or a detached ADU on a Plano lot, the first hurdle isn’t the build. It’s approval. Much of the addition and ADU work in Plano runs through private architectural review committees in master-planned subdivisions like Willow Bend and Deerfield before it ever reaches city permitting, so you’re dealing with two gates, not one. We know both gates, and we file the paperwork for you. Call (844) 761-8346 for a free estimate and a written price before anyone picks up a tool.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Plano’s Preferred Home Additions & ADU Company

A remodeled family room with new windows and a window seat

Plano homeowners research contractors the way they research a new roof: they read the middle reviews first and want a number on the page. That’s why every quote we hand over is a flat written price with a written scope and a written warranty, not a “call for a quote.” Under Clause 1 of The Haven Standard, that price is written before any work starts, on every trade from Kitchen Remodeling through additions and ADUs. It’s the discipline that has kept our projects within a few percent of the agreed cost across 4,000-plus jobs.

Local knowledge matters more here than in most suburbs. Plano is built out and largely master-planned, so most of the work is renovation, addition, and teardown-rebuild rather than greenfield building. The original builder-grade systems in Plano’s 1980s – 2000s tract homes are now hitting end-of-life all at once, which is why this city has a concentrated remodel-and-repair market instead of new-construction demand. We build to that reality, and we’re honest about the two-gate approval that goes with it. Bring a competitor’s estimate and we’ll review it line by line at no charge. Crews are background-checked, and our technicians have up to 19 years of experience.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Home Additions & ADU Services in Plano

ADU Design & Permitting

This is where Plano ADU projects are won or lost. We prepare the drawings and materials board, file with the subdivision’s architectural review committee and the city, and build the schedule so rough-in and inspection sign-off land in sequence. A packet missing HOA-facing drawings or a drainage plan for Plano’s black-clay soils triggers a correction cycle that stalls everything.

ADU Design & Permitting

Garage Conversion ADU

A garage conversion is the most common ADU path on Plano’s tighter lots, and it takes more than finish work. You’re adding a kitchenette, plumbing, a conditioned envelope, and often upgraded electrical to a space that was never built for living. Plenty of Plano garages were never permitted as habitable space either, so we sort the code side before framing. Conversions here typically run $30,000 – $80,000.

Garage Conversion ADU

New Detached ADU

If you have the lot depth, a detached ADU is a full small house: slab, utilities, roof, envelope. On Plano’s expansive black-clay slab soils, we evaluate foundation and drainage correction in the scope from day one rather than discovering it after the pour. A detached ADU in Plano runs $90,000 – $220,000 depending on size and finish. We source through vetted brands including Plant Prefab where a panelized approach fits the lot and the committee’s palette.

New Detached ADU

Junior ADU & Interior Conversion

An interior conversion turns existing square footage into a separate living space, which suits Plano’s Deerfield and Willow Bend homes where the footprint is already generous. We handle the plumbing, electrical, and life-safety details that separate a real ADU from a finished basement. Room additions and second-story additions follow the same approval path, and we scope the structural work to match what the committee will actually approve.

See our full Home Additions & ADU services for the room-addition, sunroom, and second-story scopes we build.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Plano

We don’t stock parts or run a warehouse. What we do is specify and work with material brands we’re fluent in, and we name them in the quote so the numbers are honest rather than inflated. On ADU and addition shells we work with panelized systems from Plant Prefab and Mighty Buildings where a prefab approach passes the committee’s palette and fits the lot. Everything else specifies the way you’d expect: GAF and Owens Corning roofing, KraftMaid and Wellborn cabinets, Kohler and Toto fixtures. If you’re weighing a prefab ADU against stick-built, we’ll walk through both line by line.

Common Home Additions & ADU Problems We See in Plano Homes

  • Filing with the city before the committee signs off. Plenty of Plano additions go to city permitting before the subdivision’s architectural review committee has approved heights, materials, and colors. That order forces a redesign of elevations mid-permit and starts the clock over.
  • No foundation or drainage plan in the submittal packet. Plano sits on expansive black-clay soil, and additions built on slab need pier-and-beam-leveling and drainage correction accounted for in the plan. Skip the drainage plan and you earn a plan-review correction cycle that stalls the calendar.
  • Draw schedule set before permits and inspection sign-off. Scheduling rough-in before permits clear leaves a load-bearing wall opened or a subfloor exposed while committee review runs. The fix is sequencing, not speed.
  • Builder-grade systems at end-of-life. Plano’s 1980s – 2000s brick-veneer homes are due for kitchen and bath remodels, room additions, and full teardown-rebuilds on older lots. The systems age together, so budget for the plumbing and electrical in an addition’s scope, not as an afterthought.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Home Additions & ADU in Plano, TX

Here are the numbers for the Plano market, in dollars you can screenshot and compare. What moves the range is scope (a garage conversion versus a new detached structure), foundation and drainage correction on black-clay soils, and how many review cycles the committee adds. Every quote we hand over is a flat written price with a written scope, no change proceeds without a signed change order, and the estimate is free.

Service Plano Price Range
Home Addition $45,000 – $130,000
ADU Construction $90,000 – $220,000
Garage Conversion $30,000 – $80,000

We Also Serve Cities Near Plano

We handle Home Additions & ADU in Plano and the surrounding communities. If you’re just outside the city line, we also work in Richardson, Fairview, Lucas, and Allen. Same two-gate review process in most of these subdivisions, same written price before work starts. Call (844) 761-8346 and tell us which city you’re in.

Serving Plano, TX – Our Local Coverage Area

We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Home Additions & ADU in Plano

A framer checking new wall framing on a home addition

Ready to Start Your Addition or ADU in Plano?

You have the two-gate picture now: architectural review, then city permitting, with foundation and drainage correction scoped from the start so the work isn’t stopped half-finished waiting on a committee. Call (844) 761-8346 for a free estimate and a flat written price before anyone picks up a tool. A live person answers, every visit comes with a documented photo record, and the 365-Day Done Right Promise backs every job.

Written by the team at Rowan Construction Group.

Why Plano Chooses Rowan Construction Group Plano

We set the standard for home additions & ADU in Plano.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Plano

Getting your home additions & ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your home additions & ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home additions & ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Plano Customers Say

Trusted by homeowners across Plano and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA freestanding soaking tub in a remodeled primary bathroom

More services in Plano

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Additions & ADU in Plano?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Plano.

(844) 761-8346

Request a Free Estimate in Plano

Tell us about your home additions & ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch