A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood

Cost to Reface Kitchen Cabinets in Plano - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A galley kitchen opened up to the dining room with a new peninsula
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What It Costs to Reface Kitchen Cabinets in Plano, TX (And When Refacing Is the Wrong Number)

Refacing kitchen cabinets in Plano typically runs $4,200-$8,500 for a standard 10×10 kitchen. But here’s the part that doesn’t show up in most online quotes: on Plano homes built before 2000, roughly one in three jobs turns up particleboard box swelling or water-wicked toe-kicks during tear-down - damage that voids a reface warranty and can push a “cheap” $4,500 reface toward full replacement mid-project. Call (844) 761-8346 and we’ll inspect your boxes before anyone quotes a price. The written number you get is the number you pay.

We’re Rowan Construction Group Plano, and refacing is one of the small jobs where the paperwork matters more than the door style. Here’s how to know which kind of job yours actually is before a check changes hands.

Key Takeaways

  • Refacing: $4,200-$8,500. Semi-custom KraftMaid or Wellborn replacement: $9,500-$18,000.
  • Builder-grade particleboard in 1985-2002 Plano tract homes delaminates at corner joints after North Texas wet seasons - a photo-documented box inspection catches it before the quote.
  • TFL doors vs. real-wood veneer doors: $600-$1,400 apart on a typical Plano kitchen, with a measurable durability gap in our humid summers.
  • Any damage found mid-project triggers a signed change order before work resumes. You approve every cost shift.
Installers leveling a new base cabinet during a kitchen remodel

The $4,200 Quote That Becomes a $12,000 Job: What Actually Fails in Plano Cabinets

Plano’s housing stock is dominated by 1980s-2000s brick-veneer tract homes across Deerfield, Willow Bend, and Russell Creek. The cabinets in those kitchens were built to a builder’s budget, and most used particleboard boxes with a thin melamine or paper veneer. Particleboard is fine until it gets wet - and North Texas delivers a wet season every spring, plus the occasional slab leak or dishwasher failure that wicks moisture into the toe-kick for weeks before anyone notices.

What we find on inspection, most often at the base cabinet corners and the toe-kick:

  • Swollen particleboard at corner joints - the board mushrooms, the joint opens, and any new veneer laid over it lifts within a year or two.
  • Water-wicked toe-kicks - the bottom rail soaks up moisture from the slab, softens, and stops holding screws. New door hinges have nothing solid to grab.
  • Delaminated shelf pins and drawer slides - the mounting holes wallow out and the drawer sags no matter how many times you tighten it.

When those three show up together, a reface is cosmetic work over a structural problem. That’s the moment the honest answer becomes replacement, not refacing. A photo-documented box inspection - which we include on every visit as a standard deliverable, not an add-on - is what separates a real number from a lowball estimate. You see what we see, in photos, before you sign.

Reface vs. Replace: Side-by-Side Dollars for a Plano Kitchen

Here’s the comparison laid out plainly, because “it depends” isn’t a price. Both columns are real options for a Plano kitchen, and the choice comes down to the condition of what’s under the doors.

Scope Typical Cost Range Best Fit When…
Cabinet refacing (doors, veneer, hardware) $4,200-$8,500 Boxes are solid, dry, and square; you like the layout
Semi-custom replacement (KraftMaid or Wellborn) $9,500-$18,000 Boxes are swollen, soft, or the layout needs to change
Cabinet installation (new boxes, same footprint) $4,000-$13,000 You want new boxes but the layout works as-is
Full kitchen remodel (broader scope) $14,000-$45,000 Cabinets are one part of a larger update

The gap between a $5,500 reface and a $12,000 semi-custom replacement is real money. It’s also the difference between doors that stay flat for fifteen years and doors that peel off a swollen box in eighteen months. On a sound box, refacing wins on cost every time. On a wet one, it’s a down payment on the replacement you’ll do anyway.

A newly finished roof with a ridge vent and step flashing

TFL Doors vs. Real-Wood Veneer: The $600-$1,400 Decision

Once you’ve decided the boxes are worth keeping, the next line item is the door itself. Thermally fused laminate (TFL) is a resin-saturated paper fused to a core under heat and pressure - a hard, uniform surface that shrugs off steam, grease, and the wipe-downs a busy kitchen gets. Real-wood veneer is exactly what it sounds like: a thin slice of actual wood glued to the door face, with a warm grain and a price to match.

On a typical Plano kitchen, the door choice moves the price by $600-$1,400. In our humid Texas summers, the durability difference is measurable - TFL holds its edge and finish through a decade of kitchen humidity, while wood veneer needs a stable substrate and a careful seal at the edges or it lifts. Neither is wrong. The honest answer is: match the door to the box. A premium wood veneer on a builder-grade particleboard box is a poor investment; TFL on a solid, dry box is money well spent.

If the refacing project turns into a fuller scope - new countertops, backsplash, island, the works - that’s a different conversation, and our Kitchen Remodeling page lays out the broader options. For refacing alone, the door choice is the main decision.

The Paperwork That Protects Your Number

Plano is a built-out, largely master-planned suburb, so most construction work here is renovation rather than new building. That means remodelers spend their days in 1980s-2000s tract housing - and the surprises hide behind the doors. Under Clause 1 of our Haven Standard, the price is written before anyone starts. That written scope names the refacing work, the door style, and the warranty in plain terms.

Here’s the discipline that matters most when a reface exposes damage: no work proceeds on a change until the change order is signed. If a box comes out swollen, we document it with photos, write the change, get your signature, and only then keep going. You approve every cost shift rather than finding a surprise line item at closeout. That’s how our projects have finished within a few percent of the agreed number across 4,000-plus jobs.

Our technicians bring up to 19 years of experience to the inspection, and every crew member is background-checked and uniformed before they arrive. Calls are answered by a live person 24/7, and every visit includes a documented photo record as a standard deliverable. The 365-Day Done Right Promise backs the work: if it isn’t done right, we make it right.

HOA Finish Rules: A Plano Detail That Can Delay Your Order

Deerfield and Willow Bend carry some of Plano’s stricter HOA overlays, and older open-plan homes with large windows occasionally fall under exterior-visible finish rules for anything seen from the street. Before you order doors in a color that shows through a front window, confirm compliance with your HOA architectural review - a color approval can take a few weeks and holds up the whole job if you find out late. If you’re also planning exterior work, our home page is the starting point for how the seven trades fit together.

Frequently Asked Questions

Get Your Written Number Before Anyone Picks Up a Tool

Refacing is a good decision on a sound box and a costly one on a wet one. We’ll inspect your Plano cabinets, document what we find in photos, and hand you a flat written price - plus a free second opinion on any competitor’s estimate, line by line, at no charge. Call (844) 761-8346 for a free estimate. If you’re weighing a bigger change, our Kitchen Remodeling in Plano service covers the fuller scope, and the written price comes first either way.

Written by the team at Rowan Construction Group Plano, serving Plano, TX.

What Our Customers Say

★★★★★ 5.0 from 5+ reviews

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

- Xavier L.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deckA freestanding soaking tub in a remodeled primary bathroomA second-story addition that matches the existing roofline

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346

Request a Free Estimate

Tell us what's going on in Plano. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch