A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows

Home Additions & ADU Near Me in Plano - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new paver pool deck
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Home Additions & ADU Near You in Plano, TX

Home additions and ADU (accessory dwelling unit) work in Plano, TX is quoted with a flat written price before anyone picks up a tool. That price goes out as a fixed number with a written scope and a written warranty, so you can screenshot it and compare. We’re a construction contractor that connects Plano homeowners with background-checked, uniformed independent professionals, and our phone is answered by a live person 24/7. Call (844) 761-8346 and you’ll get a written estimate for your addition, not a callback promise.

Plano is full of the same fix: families who bought into a 1990s or 2000s subdivision like Willow Bend, Deerfield or Kings Ridge and now need more square footage, but the lot won’t take a second story without tree and setback complications. A ground-level primary suite addition or a detached ADU in the side or rear yard is usually the cleaner answer. We’re called for both, and for the in-law suite and home office conversions that sit between them.

A finished backyard cottage with a small covered porch

Fast, Local Home Additions & ADU

Most Plano inquiries get a written price within a few business days of the site walk, and the site walk itself is usually scheduled within the same week. For additions in the range of 400 to 800 square feet, expect the pricing conversation to start once we’ve seen the foundation condition, existing utility runs and the alley or side-yard access. ADU pricing depends on whether you’re building detached or converting an existing garage, and we price both.

Additions aren’t an emergency trade, so we won’t pretend a slab pour is a burst pipe. But when a sub-issue turns urgent – a foundation recommendation from the engineer that changes the scope, a permit comment that stalls the schedule – you reach a live person, not a voicemail box. Our technicians have up to 19 years of experience, and every visit produces a documented photo record you keep. No work proceeds on a change until the change order is signed; that’s the discipline that has kept our projects within a few percent of the agreed cost across 4,000-plus jobs.

Areas We Cover

Plano sits at the center of a tight pocket of Collin and Dallas County suburbs, and the additions questions are similar across all of them: tight side yards, mature trees that shade a slab differently than a builder expected, and HOA guidelines on rear-yard structures. We work with homeowners in Plano, Richardson, Allen, Murphy, Fairview, Lucas, Sachse and McKinney.

If you’re outside that ring, call anyway and we’ll tell you plainly whether an addition project makes sense in your area. For a deeper look at how we approach the build, see our Home Additions & ADU in Plano page, and start with our home page for the full scope of trades.

A framer checking new wall framing on a home addition

What Does an ADU or Home Addition Cost in Plano?

Detached ADUs in Plano typically run $140,000 to $260,000 depending on size and finish level, while a 400-square-foot primary suite addition commonly prices between $95,000 and $150,000. Garage conversions are the lowest-cost ADU path, usually $65,000 to $120,000. Those ranges reflect Plano’s current permit and inspection environment, engineering costs for the expansive clay soils under most of the city, and the finish level typical for this market.

Project type Typical Plano range What drives the number
Primary suite addition (300-500 sq ft) $95,000 – $150,000 Slab tie-in, plumbing relocation, roofline integration
Detached ADU (600-900 sq ft) $140,000 – $260,000 Separate utilities, foundation, alley access, finish level
Garage conversion ADU $65,000 – $120,000 Insulation, egress, kitchen or bath rough-in, exterior door
Second-story addition $180,000 – $320,000 Structural reinforcement, stair, code updates to the existing home
Plans and engineering $4,000 – $12,000 Survey, structural drawings, permits

Plano’s clay soils are the reason foundation engineering isn’t optional here. We’ve seen additions in the Willow Bend and Deerfield areas where the soil movement required a drilled pier foundation instead of a standard slab – a decision made after soil testing, not before. That’s the kind of cost that only shows up if the contractor tested. Under Clause 1 of the Haven Standard, that cost gets written into your quote before anyone starts, and won’t appear as a surprise later.

Why Plano ADUs Are Priced Differently Than a Standard Addition

A detached ADU has its own utility service, its own foundation, and its own roofline, which means it carries the engineering cost of a small house on a small lot. A garage conversion shares the existing structure and the existing services, so the price drops. Most Plano homeowners we work with ultimately land on either a garage conversion or a ground-level suite addition, depending on whether they want a rental income path or just more room for family.

FAQs

How fast can you start a home addition in Plano?

Design and permits typically take 6 to 12 weeks in Plano, and construction starts shortly after permit approval. The written price comes before any of that, so you know the number before committing to the design phase. Call (844) 761-8346 to schedule the site walk and get the range on paper.

Do you serve my area near Plano?

Yes, if you’re in Plano, Richardson, Allen, Murphy, Fairview, Lucas, Sachse or McKinney. Those are the cities we work with most often on additions and ADUs, and the permit environment and typical lot size are similar across all of them. Call (844) 761-8346 and we’ll confirm your address and give you a straight answer.

What should I expect in an ADU or addition quote in Plano?

You should expect a flat price, a written scope and a written warranty – not a range and not “call for a quote.” Our quotes break out line items by trade, name the brands (KraftMaid and Wellborn cabinets, Cambria and Caesarstone countertops, Kohler and Toto fixtures), and list what’s not included so you’re not discovering it later. Call (844) 761-8346 for a free estimate.

Can I reach someone after hours about an addition?

Yes. Our phone is answered by a live person 24/7, and we don’t route you to voicemail at 9pm on a Sunday. After-hours calls are usually about scheduling, permit status or a scope question; actual construction issues are triaged the next business morning. If it’s an active structural concern, say so and we’ll escalate. Call (844) 761-8346 any hour.

Why Homeowners in Plano Choose Us for Additions

Three things separate us from a typical addition contractor. The first is the written price before work starts, on every trade from kitchen remodeling through additions and ADUs. The second is the change order discipline: no work proceeds on a change until the change order is signed, which is how projects finish within a few percent of the number the customer agreed to. The third is the 365-Day Done Right Promise, backed by The Haven Standard rather than a handshake.

  • Written price before any work starts – flat, with written scope and warranty
  • Signed change orders required before any scope change
  • Free second opinion on any written estimate – bring a competitor’s quote and we’ll review it line by line
  • Documented photo record on every visit, included not optional
  • Background-checked, uniformed technicians, live person answering calls
  • Sourcing across 50-plus vetted brands so the quote is based on real material costs

Bring us a competitor’s written estimate and we’ll go through it line by line at no charge. That free second opinion is a standing offer, and it’s saved more than one Plano homeowner from a quote that left out the soil testing or the permit fees.

Get a Written Price for Your Addition

Call (844) 761-8346 for a free estimate. We’ll schedule a site walk, look at the actual condition of the foundation, utility runs and access, and put a written price in front of you – a number you can compare, not a promise. Estimates are free, the price is in writing before any work starts, and someone is available to answer your call any hour of the day.

Written by the team at Rowan Construction Group Plano, serving Plano and nearby areas.

What Our Customers Say

★★★★★ 5.0 from 5+ reviews

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

- Xavier L.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A remodeled kitchen with a waterfall island and wood cabinetsA wood double vanity with two mirrors after a bathroom remodelA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA new paver patio with a seat wall and fire pit

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346

Request a Free Estimate

Tell us what's going on in Plano. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch