A Rowan company - serving Plano, TX
A renovated home on a quiet residential street at golden hour
Richardson, TX

Driveway & Pavers in Richardson - Free Measure, Itemized Written Quote

Free on-site measure and a written price per square foot before we book you in. Proper base preparation and sealed edges, because a cheap base is why driveways crack.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A new curved paver walkway to the front porch
A new concrete driveway with a paver border
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A second-story addition that matches the existing roofline
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Construction in Richardson, TX

Window replacement and roof work dominate what Richardson homeowners call us about, and the reason sits in the housing stock. The brick-veneer ranches built across 75080 and 75081 between the 1950s and 1970s still carry original single-pane windows and shallow-pitch roofs, and a North Texas hail season tests both. We put a flat written price in front of you before any work starts, on every trade. Call (844) 761-8346 to schedule a free estimate.

Call (844) 761-8346

Why Richardson Homes Are Different

Richardson is built out. There’s no greenfield left to develop, so the construction story here is redevelopment: gut a 1962 ranch, rebuild it on the same lot, re-permit it, repeat. That changes the job. A contractor working in Richardson spends as much time on demo, inspection and re-permit as on framing, and the surprises live under the slab and behind the drywall.

Two conditions drive most of it. First, the clay soils across North Texas shrink and swell with the wet-dry cycle, so foundations and slabs here carry real engineering demand and many older homes have already been re-leveled once. Second, the summer heat and the hail that comes with spring storms put the roof and the building envelope under constant load. In the older neighborhoods the pattern repeats: a straightforward remodel opens up and the original cast-iron sewer line under the slab is failing. We price what we can see, then document what we find.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Main Richardson Services

These are the two trades Richardson homeowners ask about most often, and both are quoted with a written scope and a flat price before anyone picks up a tool.

Windows & Doors in Richardson

Most of the window work we do in Richardson starts with a failed seal or a single pane that fogs between the glass by mid-afternoon. Post-war ranch windows were never built for a Dallas summer, and a house in 75080 running original aluminum frames loses cooling dollars all season. We measure every opening, confirm the frame condition and the weep paths, then install units sized to the existing rough opening so no wall gets opened unnecessarily. Door work usually pairs with it: a patio slider that no longer tracks straight or an entry door with a rotted threshold. Driveway & Pavers in Richardson covers the exterior work that often follows.

Windows & Doors in Richardson

Fence Installation in Richardson

Richardson lots in the older core are wide and shallow, and a shared fence line with a neighbor is common. Cedar privacy fencing is the usual call, though we quote aluminum and composite where the homeowner wants a lower-maintenance line along a pool or a side yard. The clay soil matters here more than people expect: posts set in expanding clay heave and lean over a few seasons unless they’re set deep and braced correctly. We set posts to depth, pour and cure, then hang panels with consistent rail spacing. See Fence Installation in Richardson for the full scope.

Fence Installation in Richardson

Home Additions & ADU in Richardson

Because Richardson is fully developed, an addition here almost always means building on a lot that’s already occupied, which brings setback, impervious-cover and foundation questions a new-build subdivision never faces. A rear primary suite is the most common request in 75082, and a detached ADU (accessory dwelling unit, a self-contained second residence on the same lot) is growing more common as families plan for aging parents or rental income. Both require foundation engineering suited to the clay, plus a re-permit that accounts for the existing structure. Details are on Home Additions & ADU in Richardson.

Home Additions & ADU in Richardson

Bathroom Remodeling in Richardson

The bathroom remodels we quote in Richardson tend to be gut jobs, because a 1968 hall bath usually has a cast-iron drain, a tub set in a mortar bed, and tile over a substrate that’s done its time. Once the tile comes off, the substrate condition decides the rest. We replace the valve and the drain line while the wall is open rather than closing it back over a problem, then rebuild with a proper waterproofing membrane (the layer behind the tile that keeps water out of the wall assembly) and a new cement backer. Tub-to-shower conversions are frequent. Full scope is at Bathroom Remodeling in Richardson.

Kitchen Remodeling in Richardson

Kitchen work in Richardson often turns into more than a kitchen, and that’s the honest warning. A ranch built in 1965 with a galley layout and original cabinets usually has a failing cast-iron drain under the slab, and demo reveals it. We plan for that contingency in the written scope so a signed change order, not a surprise invoice, handles it. Cabinet runs get reworked for modern appliances, and we quote KraftMaid or Wellborn boxes with Cambria or Caesarstone tops where the budget allows. The full breakdown lives at Kitchen Remodeling in Richardson.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Windows & Doors in Richardson

A new casement window over a kitchen sink

Windows and doors are the first place a Richardson house leaks money and comfort, because so much of the stock in 75080 and 75081 still runs the original single-pane aluminum frames from the 1960s and 1970s. Those units were never built for a North Texas summer, and twenty-plus years of thermal cycling has left many of them with failed seals, fogged glass and drafty frames. Hail doesn’t help; a spring storm can pit or crack glazing across a whole elevation. We quote and install across our Windows & Doors trade with a flat written price and a written warranty on every opening.

Window Replacement

Signs you need it

You need replacement when the glass fogs between panes, the frame is soft or the sash no longer seals shut, or cooling costs climb in a room that used to stay comfortable.

What it costs in Richardson

Whole-house window replacement in Richardson typically runs $4,500 to $15,000, and impact-rated installation ranges from $8,000 to $25,000 depending on the count and the rating.

How we do it

We measure every opening, confirm the rough opening and frame condition, pull the permit where the scope requires it, set and shim each unit, insulate the perimeter and seal it, then photograph the finished installation for your record.

Door Installation

Signs you need it

A door needs replacing when it sticks through the seasons, the threshold has rotted, daylight shows at the corners, or a patio slider no longer tracks or locks squarely.

What it costs in Richardson

Door installation is quoted within our standard window and door pricing; the number depends on the door type, the frame condition and whether the opening is being resized.

How we do it

We pull the old door and frame, inspect the rough opening and any rot behind it, set the new unit plumb and square, seal and flash the exterior, then test the hardware and the lock before we finish.

What Windows & Doors Costs in Richardson

Item Typical range in Richardson
Window Replacement $4,500 – $15,000
Impact Window Installation $8,000 – $25,000
Door Installation Quoted per opening

Do I need impact windows in Richardson?

Impact windows are worth serious consideration here. They’re rated to resist hail and wind-borne debris, which matters through North Texas storm season, and they cut outside noise from the Telecom Corridor. They cost more than standard replacement, so we quote both so you can compare side by side.

Can a window replacement lower my cooling bill in Richardson?

Yes, often noticeably. Replacing single-pane aluminum with insulated double-pane glass reduces heat gain through the window, which is the largest single cause of a hot room in an older Richardson ranch. Call (844) 761-8346 for a written quote on your openings.

Roofing in Richardson

A new roof with clean valleys and new flashing

Roofing in Richardson is a hail-and-heat story, and the shallow-pitch roofs on so many 1960s and 1970s ranches here are the ones that show it first. A low slope sheds water slowly, so a compromised shingle layer or a failed underlayment shows up as a ceiling stain rather than a dramatic leak. Every roof we quote comes with a written scope, a shingle layer count and a documented photo record before the job starts; our Roofing trade covers repair through full replacement.

Roof Repair

Signs you need it

You need repair when shingles are lifted or granule-bare on one elevation, a ceiling stain appears after a storm, or flashing at a chimney or valley is pulling away.

What it costs in Richardson

Roof repair in Richardson typically runs $400 to $1,800, and tile roof repair falls in the $600 to $2,500 range.

How we do it

We inspect the deck and the flashing, photograph the damage, quote the repair in writing, then replace the failed shingles or flashing and re-seal the penetrations.

Roof Replacement & Installation

Signs you need it

A full replacement is due when the shingles are past their service life, granules fill the gutters, or a second layer is already on the deck and hail has breached it.

What it costs in Richardson

Roof replacement in Richardson typically runs $8,000 to $20,000, and metal roof installation ranges from $15,000 to $40,000 depending on the profile and the roof area.

How we do it

We strip to the deck, replace any soft sheathing, install underlayment and the GAF or Owens Corning shingle system to spec, then photograph each stage before the final inspection.

What Roofing Costs in Richardson

Item Typical range in Richardson
Roof Repair $400 – $1,800
Roof Replacement $8,000 – $20,000
Metal Roof Installation $15,000 – $40,000

How do I know if my Richardson roof needs repair or full replacement?

It comes down to the deck and the shingle layer count. If the damage is isolated and the deck is sound, repair is the right call. If the shingles are spent or a second layer is failing, replacement is the honest answer. We quote both.

Do you pull permits for roofing in Richardson?

Yes, where the scope requires it. Replacement work is inspected, and we document the stages with photographs so you have a record of what was under the shingles. Call (844) 761-8346 to schedule an inspection with a written quote.

Brands We Service in Richardson

We work with brands we can stand behind, including ActiveYards fencing and Belgard and Tremron pavers, alongside GAF and Owens Corning roofing systems. We don’t stock parts, so material lead times vary by product. Browse our brands for the full list, and we’ll confirm turnaround in your written quote.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Construction in Richardson, TX

Service Typical range in Richardson
Window Replacement $4,500 – $15,000
Impact Window Installation $8,000 – $25,000
Roof Repair $400 – $1,800
Roof Replacement $8,000 – $20,000
Metal Roof Installation $15,000 – $40,000
Tile Roof Repair $600 – $2,500
Kitchen Remodel $14,000 – $45,000
Bathroom Remodel $9,000 – $28,000
Home Addition $45,000 – $130,000
ADU Construction $90,000 – $220,000

Price in Richardson climbs with what we find under the surface: a failing cast-iron drain, a foundation that needs attention, or a second shingle layer that has to be stripped. Under Clause 1 of the Haven Standard, the price is written before anyone starts, and no change proceeds until you sign the change order.

Neighborhoods We Serve in Richardson

We work across Richardson, from the 1950s and 1960s ranch blocks in the 75080 and 75081 core out to the newer construction on the east side in 75082. Homes near the Telecom Corridor and along Central Expressway tend to have the same envelope problems: old windows, aging roofs. One note on timing: storm season drives roofing demand across the whole area, so schedule early. We respond across all three ZIP codes as a single service area.

  • 75080 and 75081 core ranch neighborhoods
  • Heights Park area
  • Cottonwood Creek and the east Richardson blocks
  • Newer infill near the President George Bush corridor in 75082

Service Area – Cities Near Richardson

Richardson sits between several cities we also serve, and the same clay soil and hailstorm patterns follow us across the line. If you’re just outside our Richardson coverage, we likely cover your address through a neighboring area. We work in Plano, TX, Garland, TX, Murphy, TX and Sachse, TX as well. Call (844) 761-8346 to confirm your address and schedule a free estimate.

Serving Richardson, TX – Our Local Coverage Area

We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs About Construction in Richardson

Ready to get started? Free estimates in Richardson
Call (844) 761-8346

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local construction pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richardson Customers Say

★★★★★ 5.0 from 5+ reviews

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

- Xavier L.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.

How It Works in Richardson

Getting your construction project started is simple.

1

Call or Request a Free Estimate

Tell us about your construction project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A finished backyard cottage with a small covered porchA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA remodeled primary bathroom with a soaking tub and walk-in showerA single-story rear room addition with tall windows and a new patioA standing-seam metal roof over a covered porch

More services in Richardson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Request a Free Estimate

Tell us what's going on in Richardson. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch