







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Bathroom Remodeling Across Rowlett
If you own a home in Rowlett and the master bath still has its original 1990s vanity and a fiberglass shower surround, you’re in the same spot as a lot of your neighbors. A full bathroom remodel in Rowlett runs $9,000 – $28,000, and most of the homes we work in here were built between the 1980s and 2000s, so the work is almost always a first-generation upgrade rather than new construction. That changes what you should spend money on. We know the 75088 and 75089 ZIP codes block by block, we know which Rowlett subdivisions enforce strict HOA architectural review, and we put the price in writing before anyone lifts a tile. Call (844) 761-8346 to schedule a free estimate on your Rowlett bathroom.
Why Rowan Construction Group Plano Is Rowlett’s Preferred Bathroom Remodeling Company

Rowlett homeowners research a contractor the way they research a refrigerator – reading the middle reviews, wanting the number on the page. That’s exactly how we work. Every Rowlett project gets a flat written price and a written scope before demolition day, and no change proceeds without a signed change order. It’s the discipline behind the 365-Day Done Right Promise: if it isn’t done right, we make it right.
Our technicians have up to 19 years of experience, and we back every visit with a documented photo record you keep – the condition of the subfloor, the tile membrane, the rough-in, in plain terms. A live person answers calls 24/7, so you’re not chasing a voicemail when a question comes up mid-build. We also offer a free second opinion on any written estimate: bring a competitor’s quote and we’ll review it line by line at no charge. That’s how you compare budget builders and know you’re looking at the same scope.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Bathroom Remodeling Services in Rowlett
Our Bathroom Remodeling team handles everything from a single fixture swap to a full gut, and we tailor the scope to what your Rowlett home actually needs – not a templated package.
Full Bathroom Remodeling
A full Rowlett remodel replaces the tub or shower, vanity, tile, flooring, and fixtures as one coordinated job. In the brick-veneer tract homes around Rowley Park and along Chiesa Road, that usually means the whole room comes back to the studs so we can correct decades of slow leaks before new finishes go down. We lay out every selection up front so the written price matches what you pictured.
Walk-In Showers & Shower Remodeling
Walk-in showers are the most requested upgrade in Rowlett right now, and for good reason – a curbless or low-threshold shower with frameless glass opens up a bathroom that a builder-grade fiberglass surround made feel cramped. A walk-in shower installation in Rowlett typically runs $4,500 – $12,000. We waterproof the pan and walls properly, because the leak that started the project is usually hiding in the old assembly.
Tub-to-Shower Conversion
If the cast-iron tub in your Rowlett hall bath is sound but never used, a tub-to-shower conversion makes the space useful again. A conversion in Rowlett runs $3,500 – $10,000. We assess the tub and the drain rough-in first, then build a shower that drains to current code and passes inspection.
Vanities, Tile & Fixtures
A bathroom vanity installation in Rowlett runs $800 – $3,000, and it’s often the fastest way to modernize a dated bath without a full remodel. We set tile over a proper membrane, not directly on board, and source fixtures from brands we trust. For a floor and shower tile refresh, that’s frequently the highest-value money in the room.
Trusted Brands We Service in Rowlett
We don’t carry inventory – we source to your scope, which means honest numbers instead of inflated ones baked in to cover stock nobody asked for. We work with fixtures from Kohler and Toto, cabinets from KraftMaid and Wellborn, and countertops from Cambria and Caesarstone, matching each to the bathroom and the budget. Because we specify per project, a Rowlett homeowner isn’t paying for a premium brand that doesn’t belong in a hall bath, or a builder-grade fixture that won’t last in a master. We handle the order and the delivery schedule as part of the written scope, so a back-ordered vanity doesn’t quietly push your finish date. Read more about Bathroom Remodeling in Rowlett.
See the difference
Before
After
Before
After
Before
AfterCommon Bathroom Remodeling Problems We See in Rowlett Homes
- Missing written allowances. In many Rowlett builder-grade upgrades, the initial number excludes a real allowance for tile, fixtures, or the vanity. When selections exceed the guess, change order disputes start. We write the allowance into the price up front.
- HOA architectural review ignored. Newer Rowlett developments require architectural sign-off for exterior changes like window swaps or vent relocations. Skip it and the project can stall mid-remodel while you wait for approval.
- Assuming the subfloor is sound. In 20 – 40 year old homes, water damage and code violations often hide under old tile and only surface after demolition – adding unbudgeted weeks. We check for deflection and leveling before new finishes go down.
- Foundation movement cracking tile. Rowlett sits on expansive clay that swells and shrinks with wet-dry cycles, so minor foundation movement can crack tile or shift a vanity. The scope should include a level check before anything is set.
Pricing for Bathroom Remodeling in Rowlett, TX

The number you want before you call: a full bathroom remodel in Rowlett runs $9,000 – $28,000, and it lands inside that range based on room size, whether the layout moves, and the tier of tile and fixtures you choose. A small bathroom remodel runs $5,000 – $12,000. Here’s the line-item breakdown we start from.
| Service | Rowlett Price Range |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Small Bathroom Remodel | $5,000 – $12,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Tub-to-Shower Conversion | $3,500 – $10,000 |
| Bathroom Vanity Installation | $800 – $3,000 |
Cost moves mainly on layout changes, tile selection, and whether the subfloor or rough-in needs repair once we open it. Because we put a flat price and a written scope in front of you before work starts, the agreed number doesn’t drift. Bring a competitor’s estimate and we’ll give you a free second opinion line by line. Call (844) 761-8346 for an exact quote on your Rowlett bathroom.
We Also Serve Cities Near Rowlett
We handle bathroom remodels in Sachse, Garland, Wylie, and Rockwall as well, so if you’re on the lake’s edge and not sure which side of the line your address sits on, just ask. The same written price, the same signed change orders, the same photo record apply. Call for a free estimate wherever you are.
Serving Rowlett, TX – Our Local Coverage Area
We serve Rowlett and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Bathroom Remodeling in Rowlett

Yes – most bathroom remodels in Rowlett that move plumbing, relocate a drain, or change electrical require a permit and inspection sign-off. We pull the permit and schedule the inspections as part of the written scope, so the work passes before the walls close. Call (844) 761-8346 for a free estimate and we’ll tell you what your specific project needs.
Keep structural and system work in licensed hands and document it, and you protect the warranty on the rest of the home. Builder-grade bathrooms in Rowlett’s 1980s – 2000s homes often have sound cast-iron tubs and low-profile vanities, so the smart upgrade is tile, fixtures, and layout rather than a gut – which also keeps you clear of warranty issues. We put the scope in writing so you know exactly what’s being touched. Call for a free second opinion on any quote.
Interior-only work usually needs no HOA review, but any exterior change – a window replacement, a vent stack relocation – can require architectural sign-off in newer Rowlett developments, and that review can add weeks. Check your community’s rules before demolition day so the project doesn’t stall. We flag likely review items in the written scope. Call (844) 761-8346 for a free estimate.
A realistic full bathroom remodel in Rowlett runs $9,000 – $28,000, with a small bath at $5,000 – $12,000 and a walk-in shower installation at $4,500 – $12,000. Your final number depends on room size, whether the layout moves, and your tile and fixture tier. We give a flat written price before work starts. Call for an exact quote – estimates are free.
Insist on written allowances for tile, fixtures, and the vanity in the original quote, and refuse to start until those numbers are on paper. That’s how we work: no work proceeds on a change until a change order is signed, which keeps the finished cost within a few percent of the agreed price. Call (844) 761-8346 to schedule your free estimate.
Every Rowlett bathroom we quote comes with a flat written price, a written scope, and the 365-Day Done Right Promise behind it. If a small shower refresh is all the room needs, we’ll say so; if it needs a full gut, we’ll show you why on the photo record. Call (844) 761-8346 for your free estimate and we’ll put the number on paper before anyone picks up a tool.
Written by the team at Rowan Construction Group Plano.












