







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Garland
Opening up an older Garland home is not the same job as building on a fresh suburban lot. Much of the city was built between the 1950s and the 1970s, so when we frame an addition or convert a garage, the walls tend to show their age – old wiring, tired framing, cast-iron drains that have taken decades of shifting clay. We work in Garland regularly, from the blocks around downtown’s historic square out toward the Rowlett line, and we know what these houses hide. Call (844) 761-8346 to schedule your free estimate. A written price comes before any tool is picked up.
Why Rowan Construction Group Plano Is Garland’s Preferred Home Additions & ADU Company

Garland homeowners tend to research hard before they call. They read the three-star reviews, they want a number on the page, and they can tell promotional language from evidence. That suits how we work. The quote you receive is a flat price in writing with a written scope and a written warranty, and no change proceeds until a change order is signed. That discipline is what has kept our projects within a few percent of the agreed cost across 4,000-plus jobs.
Every project falls under the 365-Day Done Right Promise. If something isn’t done right, we make it right – and it’s backed by a terms page, not an asterisk. Crews are background-checked and uniformed, a live person answers calls 24/7, and every visit includes a documented photo record as a standard deliverable, not an upgrade. When you’re spending five figures on an addition, we’d rather you compare paperwork than take a promise on faith.
If you’re weighing an addition against a move, bring us any written estimate and we’ll review it line by line at no charge – our Free Second Opinion offer. It’s a fair way to see what’s included, what’s an allowance, and what got left out.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Garland
Whether you need more room and want to stay put, or want a separate unit on the lot for family or rental income, our Home Additions & ADU team handles the full scope – design, permitting, framing, finish work. Here’s where the work usually starts.
ADU Design & Permitting in Garland
An accessory dwelling unit lives or dies on its permitting path, and Garland has its own review process for the lot coverage, setbacks, and utility connections that an ADU requires. We start with a foundation assessment before a single line is drawn, because the black clay under Garland’s older blocks will move a slab if the design ignores it. Design and permitting run together so the drawings that go to the city already account for what the site will actually carry.

Garage Conversion ADU in Garland
A detached or attached garage conversion is often the least expensive way into an ADU, and it’s one of the most common requests we see in Garland’s older neighborhoods where driveways already run deep. The catch is what a conversion triggers: egress windows, smoke and carbon-monoxide detectors, upgraded electrical if the garage was never wired for living space, and a subfloor that has to hold up over a slab that may have settled. We price those upgrades into the scope up front rather than discovering them mid-project.

New Detached ADU in Garland
A new build on the back lot gives you clean control over foundation, utilities, and layout, which matters on Garland’s clay-heavy ground. Modular and prefab options have matured, and we work with systems from makers like Dvele and Plant Prefab where a factory-built shell fits the site and the budget. Either way, the foundation and utility trenching come first, and both get inspected before anything is set or framed.

Junior ADU & Interior Conversion in Garland
Not every household needs a separate structure. A junior ADU carved out of existing square footage – a converted den, a finished attic, a reworked portion of the house with its own entrance and kitchenette – can serve a parent or an adult child without touching the footprint. In Garland’s ranch and post-war tract homes, that usually means reworking interior load paths and bringing old circuits up to code, both of which we scope and price before framing starts.
Trusted Brands We Service in Garland
Material choices affect both the write-up and the inspection. Our sourcing runs across 50-plus vetted brands, which is what lets a written quote carry honest numbers rather than padded ones – KraftMaid and Wellborn cabinetry for a kitchenette in an ADU, Cambria or Caesarstone surfaces, Kohler and Toto fixtures, GAF and Owens Corning roofing on a new structure. On prefab ADU shells we work with Dvele, Mighty Buildings, Boxabl, and Plant Prefab, matching the module to the site and the permit path. We don’t stock parts and we don’t claim to; what we do is specify the right product for the job and put it in writing.
See the difference
Before
After
Before
After
Before
AfterCommon Home Additions & ADU Problems We See in Garland Homes
The failures below show up again and again on Garland additions. Most trace back to skipping a step before the walls come open.
- Skipping the pre-design foundation assessment. Garland’s expansive black clay swells and shrinks with every wet-dry cycle, and a slab that has moved will crack under new framing. We assess the foundation before design so the addition sits on ground that can carry it and passes inspection sign-off.
- No allowances for aging wiring and plumbing. Opening a wall in a 1960s Garland ranch routinely turns up knob-and-tube or undersized wiring and original cast-iron drain lines that fail inspection. That gets priced and approved in writing before the change is made, not dropped on you later.
- Underestimating permit-triggered code upgrades. Converting a garage or adding a second story pulls in egress, smoke detectors, and structural connectors. These are not optional once the permit is open, so they belong in the original number.
- Roof and exterior neglect on older stock. Spring hail and high-wind events are a standing fact of North Texas, and an aging roof on a 1970s Garland home can fail around a new addition. We look at the whole envelope, not just the new square footage.
A typical job in Garland goes like this: the homeowner opens a wall for the addition, the rough-in reveals old wiring and a failing cast-iron drain, and a qualified general contractor writes a change order with allowances for upgraded electrical and plumbing before framing proceeds. Foundation work comes first, then permits, then inspection sign-off on the new load-bearing connections and subfloor.
Pricing for Home Additions & ADU in Garland, TX

Here’s the range you can plan against. A typical home addition in Garland runs $45,000 – $130,000, a full ADU build runs $90,000 – $220,000, and a garage conversion runs $30,000 – $80,000. Where a project lands inside those bands comes down to foundation condition, how much old wiring and plumbing the walls reveal, and the code upgrades the permit brings in.
| Service | Garland Price Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
Every one of those numbers starts as a written price with a written scope before any work begins. If the scope changes, a change order gets signed first – that’s the discipline that keeps a Garland addition within a few percent of the agreed cost. Our technicians have up to 19 years of experience, and the quote is reviewable at no charge through our Free Second Opinion on any written estimate. Call (844) 761-8346 for an exact quote – estimates are free.
We Also Serve Cities Near Garland
The same work carries into the surrounding cities around Garland – Sachse to the north, Rowlett to the east, Richardson and Murphy to the west. The clay doesn’t stop at the city line, and neither does the need for a foundation assessment before design. If you’re just outside Garland, call and we’ll tell you what your address changes. For the full picture of what we handle locally, see Home Additions & ADU in Garland.
Serving Garland, TX – Our Local Coverage Area
We serve Garland and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Garland

Because the expansive black clay under Garland’s older neighborhoods shifts with every wet-dry cycle, and a slab that has already moved will rack the new framing and fail inspection if you design around it. In the 75040, 75041, and 75042 ZIPs, cracked cast-iron drains and sprung door frames are routine signs of that movement. The assessment tells the designer what the ground will carry before a line is drawn. Call (844) 761-8346 to schedule one with your free estimate.
An ADU in Garland needs the same core permits as any new dwelling plus its own review for lot coverage, setbacks, and utility connections, and that review shapes the design and the timeline. The permit also triggers code upgrades once walls are open – egress, smoke detectors, structural connectors – so we write allowances for those into the original scope. A written change order covers anything beyond them. Call (844) 761-8346 and we’ll walk through your lot and your permit path.
We inspect first, write an allowance into the contract for upgraded wiring and plumbing, and any surprise beyond that gets priced and approved in writing before we touch it. That’s how a 1960s Garland ranch stops turning into a stream of mid-project surprises. Nothing proceeds on a change until the change order is signed. Call (844) 761-8346 for a written price on your Garland addition.
Yes – a garage conversion is one of the most practical ADU routes in Garland, and it runs $30,000 – $80,000 depending on what the conversion triggers. The key considerations are egress windows, detectors, upgraded electrical if the garage was never wired for living space, and a subfloor that has to hold over a slab that may have settled. A foundation check comes first, every time. Call (844) 761-8346 for an exact quote – estimates are free.
A draw schedule is the plan for when money changes hands across the life of the job – it ties each payment to a milestone that can be inspected, not to a lump sum up front. On a Garland addition it protects you, because you pay against delivered, verified work. We tie draws to the documented photo record from each visit so you can see what was done. Call (844) 761-8346 and we’ll walk through the schedule for your project.
Ready to put a number on paper? Call Rowan Construction Group Plano at (844) 761-8346 for a free estimate on your Garland addition or ADU. You’ll get a flat written price with a written scope and a written warranty, a background-checked crew, and the 365-Day Done Right Promise standing behind the work.
Written by the team at Rowan Construction Group Plano.












