A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Home Additions & ADU · Sachse, TX

Home Additions & ADU in Sachse - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A second-story addition that matches the existing roofline
A remodeled family room with new windows and a window seat
A new paver pool deck
An open kitchen and dining area after a remodel
A freestanding soaking tub in a remodeled primary bathroom
A newly finished roof with a ridge vent and step flashing
A new front entry door with glass sidelights
A new black aluminum pool fence with a gate
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Home Additions & ADU Across Sachse

If you’re adding a room or building an ADU in Sachse, the number you need first is the range: a home addition here runs $45,000 – $130,000 and a full detached ADU runs $90,000 – $220,000, with a garage conversion landing between $30,000 – $80,000. We work Sachse lots along the Murphy Road and Miles Road corridors and out toward the Sachse Road side of town, and we know the county-line wrinkle this city carries that most suburbs don’t. Every project starts with an inspection and a flat written price before anyone picks up a tool. Call (844) 761-8346 for a free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Sachse’s Preferred Home Additions & ADU Company

A single-story rear room addition with tall windows and a new patio

We quote every Sachse project with a flat written price and a written scope before work begins, and no change proceeds without a signed change order. That discipline is the reason our projects finish within a few percent of the number the customer agreed to, across 4,000-plus jobs. Sachse homeowners read the three-star reviews and want the range in writing, which is exactly what we hand over.

Sachse sits on the Dallas – Collin county line, and that changes how addition and ADU jobs get priced and scheduled here. A single lot in a subdivision near the David Jones Park area can straddle two permitting jurisdictions, so the same plan set may need separate reviews and inspection sign-offs from both counties. We build that calendar into the schedule from day one. Our technicians have up to 19 years of experience, crews are background-checked and uniformed, and a live person answers calls 24/7. Every visit includes a documented photo record as a standard deliverable. If you’ve collected a competitor’s bid, bring it in and we’ll review it line by line at no charge under our Free Second Opinion offer. For the broader picture, our Home Additions & ADU hub covers all seven of the trades we run.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Home Additions & ADU Services in Sachse

ADU Design & Permitting

We start an ADU by confirming which county’s setback and utility tie-in rules apply to your lot, since a Sachse parcel on the county line can fall under one jurisdiction for the front setback and the other for the utility tap. Skipping that check is the fastest way to a redesign and a blown draw schedule. We do the inspection first and write the permit path into the price.

ADU Design & Permitting

Garage Conversion ADU

A garage conversion in Sachse runs $30,000 – $80,000 and is the most common first ADU we see, because it uses an existing slab and roofline. The trade-off is that older garages along the 1970s and 1980s corridors often carry minimal wiring and a slab that has moved with the clay, so we test the floor and pull a real electrical load calc before promising the finish line. The conversion still needs permits and inspection sign-off.

Garage Conversion ADU

New Detached ADU

A new detached ADU in Sachse runs $90,000 – $220,000 and puts the biggest weight on site prep. Large lots here give you the room, but fresh excavation on blackland clay can crack a slab that was never built for it, so pier systems and re-graded swales get written into the scope rather than discovered. We use established suppliers and materials from brands like Quikrete and Oldcastle for concrete and block work.

New Detached ADU

Junior ADU & Interior Conversion

A junior ADU or interior conversion is the lowest-cost path and the one most likely to run into a wall worth opening. In a Sachse ranch built in the 1970s or 1980s, we often find aluminum branch wiring spliced to newer copper, which fails rough-in inspection without pigtails. We price that re-wire as a written allowance so a finished quote doesn’t turn into a mid-job surprise. We also handle room additions, second stories, and sunrooms on the same permit-first footing.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Sachse

We source across fifty-plus vetted brands so a written quote carries honest numbers. On Sachse addition and ADU jobs that means Quikrete and Oldcastle for concrete and masonry work, and Abodu-class modular planning when a detached unit fits a tighter lot. We don’t claim a stockyard or a parts warehouse in Sachse; we specify materials by brand and let the written scope do the talking. If a brand you want isn’t on our list, we’ll tell you what it costs to source it rather than pad the number.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Home Additions & ADU Problems We See in Sachse Homes

  • Clay-soil heave during excavation. Opening ground next to a 1970s ranch on blackland clay can crack the existing slab, which means pier underpinning and re-graded swales that weren’t in the original scope. We check the neighbor’s settled slab, not just yours.
  • Aluminum wiring spliced to new copper. When a ranch’s 1970s branch wiring meets an addition, a rough-in inspection will flag it without pigtails. We price the licensed electrician’s re-pull as a written allowance up front.
  • Undersized framing at load-bearing walls. An old 2×4 wall carrying a new span needs a structural engineer’s letter and reframing. That gets inspected and approved before finishes cover it.
  • A county-line ADU designed without the right jurisdiction confirmed. A plan set that assumes one county’s setbacks can stall in permitting and force a redesign after the draw schedule starts. We confirm both counties before design.

Pricing for Home Additions & ADU in Sachse, TX

Here’s the honest range, in writing, so you can compare before you call. A room addition in Sachse runs $45,000 – $130,000 depending on square footage and how much hidden work the inspection turns up. A full ADU construction runs $90,000 – $220,000, and a garage conversion runs $30,000 – $80,000. Foundation underpinning, a re-wire, or an engineer’s letter after walls open is what moves a quote, which is why we inspect first and write allowances into the contract. That’s Clause 1 of The Haven Standard: the price is written before anyone starts. Call (844) 761-8346 to schedule your free estimate.

Service Sachse Price Range
Home Addition $45,000 – $130,000
ADU Construction $90,000 – $220,000
Garage Conversion $30,000 – $80,000

We Also Serve Cities Near Sachse

The same inspection-first approach covers the towns around us, including Murphy, Rowlett, Garland, and Wylie. If you’re comparing bids across the county line, our Home Additions & ADU in Sachse team can walk you through what changes when a lot switches jurisdictions. Call (844) 761-8346 and we’ll set up your free estimate.

Serving Sachse, TX – Our Local Coverage Area

We serve Sachse and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Home Additions & ADU in Sachse

A framer checking new wall framing on a home addition

Why Sachse Chooses Rowan Construction Group Plano

We set the standard for home additions & ADU in Sachse.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sachse

Getting your home additions & ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your home additions & ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home additions & ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sachse Customers Say

Trusted by homeowners across Sachse and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new paver patio with a seat wall and fire pitA remodeled primary bathroom with a soaking tub and walk-in showerNew double-hung windows in a dining roomA new front yard fence with a matching gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsula

More services in Sachse

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Additions & ADU in Sachse?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sachse.

(844) 761-8346

Request a Free Estimate in Sachse

Tell us about your home additions & ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch