







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Kitchen Remodeling Across Richardson
Richardson kitchens rarely fail in the ways homeowners expect. In this price range, the trouble usually isn’t a tired cabinet finish or a dated backsplash. It’s the original cast-iron drain under the kitchen slab, and the post-tension cables running just beneath it, waiting for someone to open the floor. If you live in Richardson and you have owned your home for any stretch of time, that reality sits beneath the tile whether you think about it or not. Our team knows how to work around it. We have a written price before work starts, and we account for the surprises that older Richardson ranch stock tends to hand us. Call (844) 761-8346 to schedule your free estimate.
Why Rowan Construction Group Plano Is Richardson’s Preferred Kitchen Remodeling Company

Richardson is a build-out inner-ring suburb, and its construction story is redevelopment, not greenfield. That means local reputation here gets built in the messy gut-and-rebuild work that goes on lot-by-lot in 75080 and 75081, not in the tidy new-build subdivisions further north. Neighbors talk to each other in Richardson, and a kitchen that finished on schedule and within a few percent of the agreed price travels fast.
Our calls are answered by a live person 24/7, and every project includes a documented photo record as a standard deliverable, not an upgrade. Background-checked, uniformed technicians arrive when they say they will. When a Richardson customer hands us a competitor’s estimate, we review it line by line at no charge under our Free Second Opinion, and we’ll tell them what’s missing before they sign anything.
Local expertise matters most here because of Richardson’s clay soils and post-war housing stock. That combination produces the kind of kitchen remodel that turns into a slab-and-drain job mid-demo. We plan for it in the quote.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Kitchen Remodeling Services in Richardson
Kitchen work in Richardson covers the full range: a cosmetic refresh on a 1960s tract home near Lookout Drive, a gut remodel on a brick-veneer ranch off Belt Line Road, or a full redesign in the newer east-side clusters near 75082. Our Kitchen Remodeling team handles each with a written scope and a flat written price before work starts.
Full Kitchen Remodeling in Richardson
A full gut-and-rebuild on a Richardson ranch usually means opening the floor, which is when the cast-iron drain and post-tension slab reality shows up. We sequence that discovery into the scope, get the plumbing rough-in inspected before the slab is patched, and close out with a written punch list. A typical full kitchen remodel in Richardson runs $14,000 – $45,000.
Kitchen Design & Layout in Richardson
Layout changes are where Richardson post-war kitchens excel, because the original floor plans waste space along a wall that no longer needs to carry a sink. Moving a sink or island often means relocating the drain, which is a slab job. We build that into the design instead of discovering it later.
Cabinets & Countertops in Richardson
Cabinet installation in Richardson runs $4,000 – $13,000, and countertop installation runs $2,000 – $6,500. We work through fifty-plus vetted brands, including KraftMaid and Wellborn cabinets and Cambria and Caesarstone countertops, so the written quote carries honest numbers rather than inflated ones.
Quartz & Granite Countertops in Richardson
Quartz tops pair well with the ways Richardson homeowners actually use a kitchen, and they hold up against North Texas heat. If you’re drawn to granite instead, we’ll show you both against your cabinet finish before you commit.
Trusted Brands We Service in Richardson
Richardson homeowners get real brand choices, not a single house label. We work with KraftMaid and Wellborn cabinets, Cambria and Caesarstone tops, and Kohler and Toto fixtures across kitchen work. We do not claim to stock parts locally or run trucks through Richardson. When a project calls for a specific brand, the technician sources it and the written quote reflects it. Turnaround on order-and-install timelines stays realistic because the scope is set before ordering starts.
Common Kitchen Remodeling Problems We See in Richardson Homes
Richardson’s post-war ranch stock and clay-soil foundations create a specific set of kitchen failure modes. Here are the ones we plan for:
- Bidding a cosmetic cabinet-and-counter swap without opening the under-slab drain. The original cast-iron sewer line running beneath a 75080/75081 kitchen often fails once walls come down. When it surfaces mid-demo, it becomes an unpriced change order on a post-tension slab unless the scope already accounted for it.
- Cutting a post-tensioned slab without an engineered cable-cutting plan. North Texas clay soils shrink and swell with the wet-dry cycle, putting real demand on foundations. Cutting or trenching that slab informally voids the foundation warranty and fails inspection sign-off.
- Quoting cabinets and Cambria or Silestone tops with no written allowances or change-order process. When the final draw schedule meets the homeowner’s expectations at the punch list, the collision is expensive and the resolution is slow.
- Assuming a re-leveled foundation means the kitchen is safe. A slab that has been re-leveled once in Richardson’s clay-soil ground often has a drain line under stress already. A camera scope before demolition tells you what you’re paying for.
See the difference
Before
After
Before
After
Before
AfterPricing for Kitchen Remodeling in Richardson, TX

Here are the ranges we build to in Richardson, market-calibrated and delivered as a written flat price before any work starts. Under Clause 1 of the Haven Standard, the number is written before anyone picks up a tool.
| Service | Richardson Range |
|---|---|
| Full Kitchen Remodeling | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
What moves the number within these ranges: whether the slab opens, whether the cast-iron drain needs replacement, whether layout changes move plumbing, and the cabinet and countertop finish you choose. No work proceeds on a change until the change order is signed. Call (844) 761-8346 for your free estimate.
We Also Serve Cities Near Richardson
Richardson sits in the middle of a tight cluster of neighbors we regularly work in. Plano borders Richardson to the north along the President George Bush corridor, Garland to the southeast, Murphy to the northeast, and Sachse to the east. Our team serves Kitchen Remodeling in Richardson and the surrounding area with the same written-price discipline on every project. If you are nearby and want the same standard, call us.
Serving Richardson, TX – Our Local Coverage Area
We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Kitchen Remodeling in Richardson

Yes. A Richardson kitchen remodel that touches plumbing, electrical, or structural work requires a city permit, and inspections follow the scope. For a typical ranch gut, expect a plumbing rough-in inspection before the slab is patched, an electrical rough inspection, and a final inspection at completion. If the slab contains post-tension cables, an engineered cutting plan triggers its own inspection sign-off. Under the Haven Standard, the permit and inspection path is written into the scope of work. Call (844) 761-8346 for an exact quote – estimates are free.
You don’t know until someone opens the floor or camera-scopes the drain; visible symptoms rarely tell the whole story. A home built in the 1950s – 70s in 75080 or 75081 with original plumbing is the textbook case. A camera scope before demolition confirms the drain condition, and a visual inspection of the slab edge can reveal post-tension cable anchors. We build both checks into the pre-construction process on any Richardson ranch kitchen. Call (844) 761-8346 to schedule your free estimate and get an exact quote.
Yes, for anything that touches more than one trade, a general contractor is the right call in Richardson. A kitchen rewrite touches plumbing, electrical, cabinets, countertops, and finish work; sequencing those trades well is the difference between a finished kitchen and a punch-list nightmare. Under the Haven Standard, the GC writes the scope, holds the change-order discipline, and produces the documented photo record on every visit. Call (844) 761-8346 – estimates are free.
A compliant Richardson kitchen quote should include: the permit and inspection path, a written allowance for the slab and drain contingency when the home is pre-1980 in 75080/75081, a written change-order process, a written warranty, and a punch list at close-out. A low bid typically leaves out the post-tension cutting plan, the plumbing rough-in inspection before slab patch, and any provision for the cast-iron drain. Call (844) 761-8346 to get a written line-item quote you can compare side by side.
A full kitchen remodel in Richardson typically runs $14,000 – $45,000, and a small kitchen remodel runs $9,000 – $20,000. Brand choice moves the number within those ranges: KraftMaid or Wellborn cabinets and Cambria or Caesarstone countertops sit in the mid-to-upper band, and a quartz top on a small kitchen can keep the total under $20,000. Slab or drain work pushes the number accordingly. Call (844) 761-8346 for an exact quote – estimates are free.
Schedule Your Richardson Kitchen Remodel
Richardson kitchens sit over the things that matter: clay soils that shift, post-tension slabs that can’t be cut casually, and 60-year-old cast-iron drains that fail once the walls open. The right way to remodel one is to write the number before anyone touches a tool, plan for what the floor will reveal, and document the whole job so the record travels with the house. Under the Haven Standard, that means a flat written price, a signed change order before any change, and the 365-Day Done Right Promise on the work. Call (844) 761-8346 to schedule your free estimate and get your Richardson kitchen priced in writing.
Written by the team at Rowan Construction Group.












