A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Kitchen Remodeling · Sachse, TX

Kitchen Remodeling in Sachse - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A stone counter, tile backsplash and open shelf after a kitchen remodel
New painted shaker cabinets with an organized deep drawer
A remodeled kitchen with a waterfall island and wood cabinets
A new roof with clean valleys and new flashing
A new multi-panel patio door opening a kitchen to the patio
A new stained cedar privacy fence
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Kitchen Remodeling in Sachse, TX: What It Really Costs and What We Find When Walls Open

Kitchen remodeling in Sachse typically runs $14,000 – $45,000 for a full remodel, with cabinet installation and refacing at $4,000 – $13,000, quartz or granite countertops at $2,000 – $6,500, and a backsplash at $800 – $2,500. The final number in a Sachse home depends less on the finish selections than on what sits behind the drywall once the kitchen is opened up. In the city’s 1970s – 90s brick ranches, that is where wiring, framing and waterproofing problems live.

Call (844) 761-8346

We price every kitchen with a flat written quote before work begins, allowances written into the contract, and any surprise approved in writing before we touch it. Call (844) 761-8346 for a free estimate.

Fast, Reliable Kitchen Remodeling Across Sachse

Sachse homeowners reach us at (844) 761-8346 and get a live person on the line. Our background-checked, uniformed technicians serve zip code 75048 and the neighborhoods along the Dallas – Collin county line, and we know the difference between a 1970s ranch off the older corridors and a 2010s two-story in the newer subdivisions. Our technicians have up to 19 years of experience and every visit ends with a documented photo record, so you have evidence of what we found and what we did. That matters here, because Sachse kitchens hide things.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Why Rowan Construction Group Plano Is Sachse’s Preferred Kitchen Remodeling Company

Rowan Construction Group Plano builds to The Haven Standard, and Clause 1 of that standard is a written price delivered before anyone picks up a tool. Over 4,000 projects and a founding discipline of signed change orders have kept our costs within a few percent of the agreed figure since 2007. That is the record Sachse homeowners are buying when they sign.

Our crews are background-checked and uniformed, calls are answered by a live person 24/7, and the 365-Day Done Right Promise is printed on every page and backed by a terms page, not an asterisk. We also offer a Free Second Opinion on any written estimate: bring a competitor’s quote and we review it line by line at no charge. In a city where the housing stock runs from mid-century ranches to fresh subdivisions, that review often exposes allowances that are too thin. Our local knowledge is straightforward: we source from fifty-plus vetted brands (KraftMaid and Wellborn cabinets, Cambria and Caesarstone countertops, Kohler and Toto fixtures, among others) so the written quote carries honest numbers, and we plan around the clay soil that shapes so much of Sachse construction.

Our Kitchen Remodeling Services in Sachse

Installers leveling a new base cabinet during a kitchen remodel

We work across the full range of Kitchen Remodeling services. In Sachse, that means a job plan built around inspection first and documentation at every step, not a finish-first pitch.

Full Kitchen Remodeling

A full kitchen remodel in Sachse runs $14,000 – $45,000, and the scope is written and itemized before work starts. In the older brick ranches, we open walls expecting to find what most remodelers don’t budget for: undersized framing, aluminum branch wiring, or a subfloor out of level from clay-soil movement. We inspect the rough-in, then price any structural or electrical upgrade as a signed change order before proceeding.

Kitchen Design & Layout

Layout drives cost more than any material choice. Moving a sink, range or load-bearing wall changes the plumbing and framing scope, and in Sachse’s older homes that often means a framing correction you can’t see until the plasterboard is off. We design the layout around what the structure can actually support, which keeps the written price honest from day one.

Cabinets & Countertops

Cabinet installation and refacing in Sachse runs $4,000 – $13,000, and quartz or granite countertops run $2,000 – $6,500. We specify KraftMaid and Wellborn cabinetry and Cambria or Caesarstone surfaces, and we check the wall and floor before a single box is hung. Clay soil moves, and a cabinet run set on an out-of-level subfloor will show gaps and misaligned doors within a year.

Backsplash, Tile & Flooring

A backsplash runs $800 – $2,500. Before tile goes up we check the substrate, because failed waterproofing behind old backsplash tile is one of the most common hidden damage we find in Sachse kitchens, and grout that keeps cracking is usually a sign of a wet substrate, not bad grout. We define the membrane (the waterproof layer behind the tile) and inspect it in the same visit we price the work.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Sachse

We work with material brands Sachse homeowners already know and specify: KraftMaid and Wellborn cabinets, Cambria and Caesarstone countertops, Kohler and Toto fixtures, and Oldcastle masonry products for the structural and exterior work a remodel sometimes triggers. We don’t stock parts locally or run our own warehouse; we source from fifty-plus vetted brands so the written quote carries real numbers rather than inflated ones. Fast turnaround comes from planning the material list up front, not from inventory on a truck.

Common Kitchen Remodeling Problems We See in Sachse Homes

A second-story addition that matches the existing roofline

The single biggest reason a Sachse remodel quote moves is what opening up an older home turns up. Sachse sits on the Dallas – Collin county line, and its 1970s – 90s brick ranches often contain wiring and framing that predates the current building code. A permit triggers upgrades that newer subdivisions rarely face. These are the failures we see most:

  • Hidden water damage behind old backsplash tile. Failed waterproofing from a previous remodel leaves a wet substrate that keeps cracking grout and loosening tile. We check the membrane before tiling, not after.
  • Undersized or damaged framing. Walls opened for a layout change sometimes reveal framing that can’t carry a load, forcing load-bearing corrections that weren’t in the original scope. We price them as a written change order before proceeding.
  • Electrical code upgrades triggered by permit inspection. Exposed old wiring often fails inspection and requires upgrading to support modern appliance loads, which adds cost and time to the draw schedule.
  • Slab and subfloor out of level from clay soil. North Texas blackland clay expands and contracts with the wet-dry cycle, and pier-and-beam and slab foundations heave. A kitchen run set on an unlevel floor will telegraph gaps into the cabinetry.

Here is how a typical job goes. Picture a 1970s Sachse ranch: opening the kitchen wall often reveals undersized framing and aluminum branch wiring that can’t support a modern appliance load, and the subfloor may sit out of level from years of clay movement. A qualified general contractor pulls permits, inspects the rough-in, and prices any necessary structural or electrical upgrade as a written change order before work continues, so the homeowner sees the cost before the next trade arrives.

This is why a kitchen remodeling in Sachse can cost more than a generic guide expects. A written-change-order process is what keeps those surprises from blowing up the budget. Under Clause 1, the price is written before anyone starts; every change after that is signed before it happens.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Kitchen Remodeling in Sachse, TX

Here are the numbers we put on paper for Sachse. We deliver a flat written price with a written scope and a written warranty before any work starts, and “call for a quote” isn’t an option here.

Service Sachse Price Range
Full Kitchen Remodeling $14,000 – $45,000
Cabinet Installation & Refacing $4,000 – $13,000
Quartz & Granite Countertops $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000

Allowances for structure and electrical are written into the contract so the price reflects the house you own, not a best-case assumption. Everything above the written number is approved in writing before we touch it. Estimates are free. Call (844) 761-8346 for an exact quote.

We Also Serve Cities Near Sachse

We serve homeowners in Murph, and we cover the surrounding corridor too: Murphy, Rowlett, Garland and Wylie. The same written-price discipline applies across the county line and throughout our Kitchen Remodeling in Sachse service area. If you live just outside the 75048 boundary, call and we’ll confirm coverage.

Serving Sachse, TX – Our Local Coverage Area

We serve Sachse and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Kitchen Remodeling in Sachse

Get Your Written Price for a Sachse Kitchen

A newly finished roof with a ridge vent and step flashing

Rowan Construction Group Plano puts the number in writing before work starts, on every trade from kitchen remodeling through home additions. The 365-Day Done Right Promise backs the work, every visit comes with a documented photo record, and any change is priced and signed before we touch it. Call (844) 761-8346 to schedule your free estimate and get a flat written price for your Sachse kitchen.

Written by the team at Rowan Construction Group Plano.

Why Sachse Chooses Rowan Construction Group Plano

We set the standard for kitchen remodeling in Sachse.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sachse

Getting your kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sachse Customers Say

Trusted by homeowners across Sachse and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
New double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deckA freestanding soaking tub in a remodeled primary bathroomA new front entry door with glass sidelightsA new black aluminum pool fence with a gate

More services in Sachse

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Kitchen Remodeling in Sachse?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sachse.

(844) 761-8346

Request a Free Estimate in Sachse

Tell us about your kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch