A Rowan company - serving Plano, TX
A remodeled kitchen with a wood island, painted cabinets and a plaster range hood
Kitchen Remodeling · Sunnyvale, TX

Kitchen Remodeling in Sunnyvale - Written Fixed Price, Finish Date in the Contract

Free in-home design consult and a written, line-item quote before demo starts. The price we sign is the price you pay, with a finish date in the contract. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A remodeled kitchen with a waterfall island and wood cabinets
An open kitchen and dining area after a remodel
A galley kitchen opened up to the dining room with a new peninsula
A new black aluminum pool fence with a gate
A new curved paver walkway to the front porch
A walk-in shower with large-format tile and a built-in niche
A remodeled family room with new windows and a window seat
A standing-seam metal roof over a covered porch
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Kitchen Remodeling Across Sunnyvale

Sunnyvale homeowners call us because kitchen work here runs on a different clock than it does in Rowlett or Garland. This is a rural-edge town in eastern Dallas County, where new custom homes on one-acre-plus lots sit beside working ranches, and where a remodel often crosses the line between town permitting and unincorporated county rules. That reality shapes every decision we make before a single cabinet is ordered. We know the 75182 territory, we know how architectural review treats a kitchen plan, and we build timelines that account for it. For a free estimate on your Sunnyvale kitchen, call (844) 761-8346.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Sunnyvale’s Preferred Kitchen Remodeling Company

Installers leveling a new base cabinet during a kitchen remodel

Our reputation in Sunnyvale rests on documentation, not salesmanship. Every kitchen project starts with a flat written price and a written scope before any work begins, and no change proceeds without a signed change order. That discipline is why projects here finish within a few percent of the number the homeowner agreed to, even when an architectural review packet has to be filed and refiled.

Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed before arriving on your property. A live person answers calls around the clock, and every visit includes a documented photo record as a standard deliverable. When you’re comparing written estimates, bring us a competitor’s quote and we’ll review it line by line at no charge through our Free Second Opinion offer.

Sunnyvale-specific knowledge is where the advantage shows. We understand that a kitchen plan for a custom home on a large lot needs exterior details in the submittal packet that a tract-home remodel never touches. We understand clay soil under slab. And we understand that review and cabinet lead times have to run in parallel, not in sequence, or your kitchen sits half-demolished for a month. Every promise we make is backed by our 365-Day Done Right Promise and The Haven Standard, printed on the page, not buried in an asterisk.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Kitchen Remodeling Services in Sunnyvale

Full Kitchen Remodeling

A complete Sunnyvale kitchen remodel typically runs $14,000 – $45,000 and includes demolition, rough-in, cabinetry, countertops, backsplash, and finish work. On the newer custom homes east of the 75182 marker, the scope often includes reconciling the new kitchen with an original design language the whole house already speaks. Under Clause 1 of the Haven Standard, the price is written before anyone starts.

Kitchen Design & Layout

Layout work in Sunnyvale runs into a specific structural reality: older ranch-style homes here often have a load-bearing wall between the kitchen and the adjacent room. Any plan that removes one requires an engineer’s stamp and a permit before framing is touched. We map that in a written scope that separates cosmetic work from structural rough-in, with inspection sign-off scheduled before drywall closes the walls.

Cabinets & Countertops

Cabinet installation in Sunnyvale runs $4,000 – $13,000 and countertop installation $2,000 – $6,500. Cabinet runs frequently go out of level as the foundation shifts with our wet-dry cycles, so our crews check the slab for cracks and pitch before setting base cabinets, then use shims and a laser to establish a true line. We source from vetted brands including KraftMaid, Wellborn, Cambria, and Caesarstone, which gives the written quote honest numbers rather than inflated ones.

Backsplash, Tile & Flooring

Backsplash installation in Sunnyvale runs $800 – $2,500. Tile and flooring specs here get measured against the home’s original palette, particularly in custom homes where the kitchen is visible from a main living area. We confirm tile membrane and substrate in the scope so the finished surface sits flat over the slab.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Sunnyvale

We work from a sourcing list of more than fifty vetted brands across the trades. Kitchens here commonly specify KraftMaid and Wellborn cabinets, Cambria and Caesarstone countertops, and Kohler or Toto fixtures. For site and exterior work tied to a kitchen renovation, we also draw on Oldcastle, Quikrete, and Sakrete materials. The purpose of that depth is straightforward: a written quote built on honest distributor pricing and a real lead-time window, not numbers inflated to cover unknown scope.

Common Kitchen Remodeling Problems We See in Sunnyvale Homes

  • Foundation movement under slab. Sunnyvale sits in the Blackland Prairie belt, where expansive clay soil shrinks and swells with wet-dry cycles. Cabinets set on a moving slab go out of level within a season, so we check the slab for cracks and pitch before any base cabinet is placed.
  • Missing exterior details in the review packet. A kitchen plan filed without window heights, vent hood style, and brick or stone match details consistent with the home’s original custom design gets rejected. Review then adds weeks before any cabinet or countertop order can be released.
  • Cabinets ordered before the foundation is evaluated. Calling a KraftMaid or Cambria order before the slab condition is understood is the fastest route to an out-of-level install and a costly change order. Review and foundation check should both clear first.
  • No written scope for load-bearing changes. Discovering mid-project that a beam is needed, with no allowance in the written scope, stalls the draw schedule. A clear scope with a defined allowance for structural work keeps the calendar honest.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Kitchen Remodeling in Sunnyvale, TX

A new bay window with a cushioned seat

Sunnyvale pricing reflects the housing stock: larger custom homes, extended cabinet runs, high-end countertop material. We put a number on the page so you can screenshot and compare before you pick up the phone.

Service Sunnyvale Range
Kitchen Remodel $14,000 – $45,000
Small Kitchen Remodel $9,000 – $20,000
Cabinet Installation $4,000 – $13,000
Countertop Installation $2,000 – $6,500
Backsplash Installation $800 – $2,500
Kitchen Island Installation $3,000 – $10,000

What moves a Sunnyvale kitchen toward the top of that range: added cabins, a structural change, and premium stone material. What keeps it lower: a partial remodel that leaves the layout intact. Every quote is flat and written with a written scope and a written warranty. Call (844) 761-8346 for your free estimate, and bring any competitor’s quote for a free line-by-line review.

A Local Detail Worth Understanding: Architectural Review in Sunnyvale

Because Sunnyvale sits on the rural-to-suburban fringe, a kitchen remodel on a large-lot custom home here can require both a town building permit and coordination with unincorporated Dallas County rules. The review packet must show exterior details that fit the home’s original custom design: window heights, vent hood style, brick or stone match against the original elevation. Review typically adds three to six weeks to the calendar before any cabinet or countertop order can be released. We schedule around that window so the work does not sit half-finished waiting on a committee: foundation and slab checks, design confirmation, and permit submittal all move together, with framing and inspection sign-off arranged before drywall closes the walls.

Contractors also routinely work lots here where the nearest neighbor is an active cattle pasture, so staging, spoil piles, and equipment access have to be negotiated with property owners and county road crews rather than a suburban HOA. Concrete trucks often face long gravel driveways before reaching the site. We build that into the schedule so access does not become the surprise that pushes a job off track.

We Also Serve Cities Near Sunnyvale

If you’re just up the road, we handle Kitchen Remodeling in Sunnyvale and the surrounding eastern Dallas County communities of Rowlett, Garland, Rockwall, and Sachse. The same written pricing and documentation discipline applies in each. If you’re not sure whether you’re in our service territory, call and we’ll tell you straight.

Serving Sunnyvale, TX – Our Local Coverage Area

We serve Sunnyvale and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Kitchen Remodeling in Sunnyvale

Why Sunnyvale Chooses Rowan Construction Group Plano

We set the standard for kitchen remodeling in Sunnyvale.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunnyvale

Getting your kitchen remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your kitchen remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local kitchen remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunnyvale Customers Say

Trusted by homeowners across Sunnyvale and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A wood double vanity with two mirrors after a bathroom remodelA single-story rear room addition with tall windows and a new patioA new clay tile roofNew double-hung windows in a dining roomA new front yard fence with a matching gateA new paver pool deck

More services in Sunnyvale

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Kitchen Remodeling in Sunnyvale?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunnyvale.

(844) 761-8346

Request a Free Estimate in Sunnyvale

Tell us about your kitchen remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch