A Rowan company - serving Plano, TX
A new herringbone paver driveway
Driveway & Pavers · Sunnyvale, TX

Driveway & Pavers in Sunnyvale - Free Measure, Itemized Written Quote

Free on-site measure and a written price per square foot before we book you in. Proper base preparation and sealed edges, because a cheap base is why driveways crack.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A new paver pool deck
A new curved paver walkway to the front porch
A garage converted into a guest room and home office
New architectural shingles with a clean valley
A new casement window over a kitchen sink
A new white vinyl privacy fence with a double gate
New painted shaker cabinets with an organized deep drawer
A remodeled hall bathroom with patterned floor tile and painted walls
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Driveway & Pavers Across Sunnyvale

Sunnyvale driveways are not built like the ones two towns over, and we plan them that way. If you’re on a one-acre lot off Belt Line Road or near the Sunnyvale Preserve, we know what your ground does when the wet season turns dry – the clay moves, and a slab or paver field that ignored it will show you by spring. Our technicians have up to 19 years of experience, and every visit includes a documented photo record. Call (844) 761-8346 for a free estimate on your driveway in Sunnyvale.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Sunnyvale’s Preferred Driveway & Pavers Company

A crew setting pavers over a compacted base

Get a written price before anyone picks up a shovel. That’s Clause 1 of The Haven Standard, and it’s the reason this phone number rings. Rowan Construction Group has delivered 4,000-plus projects since 2007 and holds projects within a few percent of the agreed number, because no change proceeds without a signed change order.

We work Sunnyvale through Driveway & Pavers, one of seven residential trades we run, and we bring a free second opinion on any written estimate you’ve already been handed. That’s a real value here – bring a competitor’s quote and we’ll review it line by line at no charge. A paved driveway is a five-figure decision on most of these lots, so you deserve to compare, not commit.

Our crews are background-checked and uniformed, a live person answers calls 24/7, and every visit ends with a photo record. What we found, what we did, what we recommend next – in pictures and plain language. Call (844) 761-8346 and we’ll schedule a time.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Driveway & Pavers Services in Sunnyvale

Paver Driveways

Paver driveway installation in Sunnyvale runs $7,000 – $18,000 on a typical two- to three-car span. We quote Belgard and Techo-Bloc pavers where the design calls for them. On a long lot, the paver field is only half the work – edge restraint and the transition to your gravel drive or county road frontage decide whether the surface stays true.

Paver Driveways

Concrete Driveways & Concrete Work

Concrete sits below pavers on cost – a concrete driveway installation here runs $4,500 – $12,000 – and gets the same base prep. On Blackland Prairie soil, we size the slab and control joints to the lot’s drainage pattern, not to a template. Proper base and joint spacing matter more than the mix on a lot like yours.

Concrete Driveways & Concrete Work

Asphalt Driveways & Resurfacing

Asphalt driveway paving runs $3,500 – $9,000 for a standard driveway in Sunnyvale, and resurfacing a worn surface costs considerably less than a full replacement. Asphalt tolerates some movement better than a monolithic slab, which is why rural properties with long gravel-to-paved runs often choose it.

Asphalt Driveways & Resurfacing

Driveway Repair & Replacement

If your slab is cracking at the joints, driveway replacement runs $5,000 – $14,000 across Sunnyvale, and we’ll give you a written scope before you commit to it. Sometimes a sectional repair with base correction is the right call. We’ll tell you which and why, with photos.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Sunnyvale

Material selection drives both the look and the schedule. For pavers we quote Belgard and Techo-Bloc and check lead times before the quote is signed. On the modular and prefab side, we work with Dvele and Plant Prefab where site-built coordination with a separate structure or accessory paving is in play. We don’t stock parts locally – we order to your written scope and confirm delivery dates in writing before work begins. No warehouse promises, just lead times in the quote.

Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Common Driveway & Pavers Problems We See in Sunnyvale Homes

  • Slabs cracked from clay movement. Sunnyvale’s expansive Blackland Prairie clay can heave a driveway slab enough to crack it within a single wet-dry season, so the usual failure isn’t the concrete – it’s the base that wasn’t engineered for shrink-swell.
  • Paver edges shifting at the gravel drive. Where a paved run meets a private gravel drive or the county road transition, heavy trucks and soft clay settle the edge unless a concrete curb or edge restraint contains it.
  • Washouts on long sloped drives. A long, sloped driveway concentrates water, and if the soil below the pavers is unprepared, that water reaches the base and the surface settles. Drainage gets designed, not discovered.
  • Sealing neglected until the surface is pitted. Driveway sealing runs $250 – $700 and protects a surface that would otherwise degrade over several North Texas summers. It’s the cheapest line in the budget and the one most often skipped.

Pricing for Driveway & Pavers in Sunnyvale, TX

A new black aluminum pool fence with a gate

Prices below are the ranges we quote in Sunnyvale. Your number depends on square footage, existing surface removal, base depth, and how far the truck has to come down a gravel drive. You’ll see it in writing before any work starts.

Service Sunnyvale Price Range
Paver Driveway Installation $7,000 – $18,000
Concrete Driveway Installation $4,500 – $12,000
Driveway Replacement $5,000 – $14,000
Driveway Sealing $250 – $700

We also install paver patios, walkways, and pool decks if the driveway project has you thinking about the rest of the hardscape. Call (844) 761-8346 for a free written estimate.

We Also Serve Cities Near Sunnyvale

Our independent local professionals work the neighboring towns too – Rowlett, Garland, Rockwall, and Sachse are all within reach. If you’re searching for Sunnyvale driveway work and want the same written-price, photo-record standard across the metro, call (844) 761-8346. Free estimates in every one.

Serving Sunnyvale, TX – Our Local Coverage Area

We serve Sunnyvale and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Driveway & Pavers in Sunnyvale

A galley kitchen opened up to the dining room with a new peninsula

Why Sunnyvale Chooses Rowan Construction Group Plano

We set the standard for driveway & pavers in Sunnyvale.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunnyvale

Getting your driveway & pavers project started is simple.

1

Call or Request a Free Estimate

Tell us about your driveway & pavers project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local driveway & pavers pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunnyvale Customers Say

Trusted by homeowners across Sunnyvale and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A finished backyard cottage with a small covered porchA new roof with clean valleys and new flashingA new multi-panel patio door opening a kitchen to the patioA new stained cedar privacy fenceA remodeled primary bathroom with a soaking tub and walk-in showerA single-story rear room addition with tall windows and a new patio

More services in Sunnyvale

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Driveway & Pavers in Sunnyvale?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunnyvale.

(844) 761-8346

Request a Free Estimate in Sunnyvale

Tell us about your driveway & pavers needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch