A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows
Home Additions & ADU · Sunnyvale, TX

Home Additions & ADU in Sunnyvale - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A garage converted into a guest room and home office
A finished backyard cottage with a small covered porch
A new paver patio with a seat wall and fire pit
A remodeled primary bathroom with a soaking tub and walk-in shower
A new clay tile roof
New double-hung windows in a dining room
A new front yard fence with a matching gate
A new paver pool deck
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Home Additions & ADU Across Sunnyvale

Building onto a home in Sunnyvale is not the same as remodeling inside a city subdivision. Plenty of properties here sit on an acre or more, some of them on unincorporated Dallas County land where the permit window is a county office, not a city counter. That single fact changes the scope, the schedule, and the price of an addition or an ADU before a single shovel hits the ground.

Call (844) 761-8346

We work Sunnyvale regularly, from the large custom homes off Belt Line Road out toward the rural stretches past the 75182 edges of town, and we scope every project around what the lot actually requires: soil tests for that Blackland Prairie clay, septic and well setbacks marked before excavation, and material hauls down long gravel drives. Call (844) 761-8346 and a live person will pick up, day or night.

Why Rowan Construction Group Plano Is Sunnyvale’s Preferred Home Additions & ADU Company

A remodeled family room with new windows and a window seat

Sunnyvale homeowners tend to research a contractor the way they research anything else expensive. They read the middle reviews. They want the number on the page before they call. That suits how we work, because every project we quote gets a flat written price and a written scope before anyone picks up a tool. Under Clause 1 of The Haven Standard, the price is written first, always, and no work proceeds on a change until the change order is signed. That discipline is why our projects have finished within a few percent of the agreed cost across 4,000-plus jobs since 2007.

Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed before they arrive. Every visit includes a documented photo record as a standard deliverable, so you leave with evidence of what was found and what was done. If you’ve already got a written estimate from another builder, bring it. We’ll review it line by line at no charge as a free second opinion, and we’ll tell you plainly where the numbers do or don’t hold up for a Sunnyvale lot.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Home Additions & ADU Services in Sunnyvale

Here’s where we go deeper than the general Home Additions & ADU overview, because the Sunnyvale build is a different animal than a lot inside a neighboring city limit.

ADU Design & Permitting in Sunnyvale

On a large-lot Sunnyvale property, the first question is jurisdiction. Many acreage parcels here fall under unincorporated Dallas County, so the addition or ADU may need county permits and county inspection sign-off rather than a city permit. We confirm which authority controls your lot before the design is finalized, then build the permit set around that answer so the schedule doesn’t stall waiting on the wrong counter.

ADU Design & Permitting in Sunnyvale

Garage Conversion ADU in Sunnyvale

A garage conversion is usually the fastest route to a rentable or family-ready unit, and it’s a strong fit where the existing footprint is already wired and on the septic system. Typical garage conversion work in Sunnyvale runs $30,000 – $80,000. Where the detached shop or barn is the target, we check the slab condition and the drainage grade around the structure first, since that expansive clay has been known to heave a slab corner and crack a wall over a single wet spring.

Garage Conversion ADU in Sunnyvale

New Detached ADU in Sunnyvale

A new detached ADU is where Sunnyvale’s acreage really pays off, because you’ve got the room to set the structure back from the well and the septic field. These builds run $90,000 – $220,000 depending on size, utilities, and access. We scope the long material haul and the gravel-drive access for concrete trucks up front, so the pour day doesn’t add an unplanned change order.

New Detached ADU in Sunnyvale

Junior ADU & Interior Conversion in Sunnyvale

An interior conversion, carving a junior ADU out of existing square footage, keeps you inside the existing envelope and often avoids the county permitting coordination entirely. We check load paths and the mechanical layout before we commit to a number, because moving a bearing wall in a ranch-style home is a different job than in a newer custom build.

Room Additions, Second Story Additions, Sunrooms & Site Prep

Room additions and second-story work make up a big share of what we do here, and they almost always start with the ground: a soil test to understand how the clay is behaving under that specific lot, then an engineered foundation or pier plan sized to it. Sunrooms and enclosed patios are lighter work but still get the grading and drainage checked, since water that pools against a new slab is a slow problem that shows up two summers later. Whether your project needs full site prep and utility trenching or just a room bump-out, we’ll put the scope and the price in writing before any work starts.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Sunnyvale

For prefab and modular ADU structures, we work with reputable manufacturers such as Dvele, Plant Prefab, and Mighty Buildings, and we coordinate the site work, foundation, and utility connections around their specifications. We don’t stock parts locally, so we won’t pretend a delivery is sitting in a yard down the road. What we do is build the schedule around real lead times and confirm delivery access to your Sunnyvale lot, including whether a long gravel driveway will take the truck. Turnaround is a function of how well the site is prepped before the structure arrives, and that’s on us.

Common Home Additions & ADU Problems We See in Sunnyvale Homes

  • Assuming city permitting applies when the lot is actually under county jurisdiction. On unincorporated parcels here, that mistake means the permit is filed at the wrong office and the inspection sign-off never comes. We confirm the controlling authority before design locks.
  • Underestimating the cost and time of a long gravel driveway for concrete and material deliveries. A concrete truck that can’t reach the pour site turns into a pump truck, a longer pour, and a bigger bill. We price access honestly up front.
  • Ignoring septic and well setbacks, forcing a late redesign. Building over a septic field or too close to a well means a change order to move the foundation or reshape the layout. We mark it before excavation.
  • Treating the expansive Blackland Prairie clay like stable ground. This soil swells and shrinks with the wet-dry cycles, so a foundation that isn’t engineered for it can crack within a couple of seasons. A soil test and proper drainage grading are not optional here.
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

Pricing for Home Additions & ADU in Sunnyvale, TX

A framer checking new wall framing on a home addition

Here are the ranges we quote in Sunnyvale, and they’re the same numbers you’d see whether your lot is a half-acre in town or twenty acres out past the county line.

Project Typical Sunnyvale Range
Home Addition $45,000 – $130,000
ADU Construction $90,000 – $220,000
Garage Conversion $30,000 – $80,000

What moves you within a range: the size and footprint, whether the lot is county or city jurisdiction, how far the septic field and well sit from the build, the length and condition of the driveway, and how much foundation engineering the soil test calls for. Those are the pieces we nail down before we hand you a number. Your written price is flat and comes before any work starts, and the estimate itself is free. Call (844) 761-8346 to schedule it.

We Also Serve Cities Near Sunnyvale

If you’re just outside town, we also take on additions and ADU work in Rowlett, Garland, Rockwall, and Sachse. The permitting picture can shift fast across those lines, so we check each lot the same way we do in Sunnyvale. Reach out and we’ll tell you what changes for your address.

Serving Sunnyvale, TX – Our Local Coverage Area

We serve Sunnyvale and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Home Additions & ADU in Sunnyvale

A remodeled hall bathroom with subway tile and a floating vanity

Ready to Price Your Sunnyvale Addition or ADU?

Whether you’re planning a new detached ADU, a room addition, or converting a shop into living space on your acreage, the first step is the same: a site review and a written price in your hands before any work starts. Call Rowan Construction Group at (844) 761-8346 to schedule your free estimate. A live person answers around the clock, every project comes with free second-opinion review of any competitor’s quote, and your visit includes a documented photo record from the crew that shows up.

Written by the team at Rowan Construction Group.

Why Sunnyvale Chooses Rowan Construction Group Plano

We set the standard for home additions & ADU in Sunnyvale.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Sunnyvale

Getting your home additions & ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your home additions & ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local home additions & ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Sunnyvale Customers Say

Trusted by homeowners across Sunnyvale and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new stained cedar privacy fenceAn open kitchen and dining area after a remodelA freestanding soaking tub in a remodeled primary bathroomA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelightsA new black aluminum pool fence with a gate

More services in Sunnyvale

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Home Additions & ADU in Sunnyvale?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Sunnyvale.

(844) 761-8346

Request a Free Estimate in Sunnyvale

Tell us about your home additions & ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch