A Rowan company - serving Plano, TX
A new rear addition with a vaulted beamed ceiling and tall windows

ADU Cost in Plano - One Fixed Price, Permits Handled

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A remodeled family room with new windows and a window seat
A garage converted into a guest room and home office
A new bay window with a cushioned seat
A new wood side gate with black hardware
A new concrete driveway with a paver border
A stone counter, tile backsplash and open shelf after a kitchen remodel
A remodeled hall bathroom with subway tile and a floating vanity
New architectural shingles with a clean valley
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate
Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

What an ADU Costs in Plano, TX (and the Feasibility Check That Comes First)

An ADU in Plano typically runs $90,000-$220,000 for a new detached structure and $30,000-$80,000 for a garage conversion, with most Plano homeowners landing in the $45,000-$130,000 band once scope, utilities, and site work are counted. But before anyone quotes you a construction number, there’s a step worth understanding: Plano’s zoning code and many legacy deed restrictions narrow where and how big an ADU can be on a single-family lot. Call (844) 761-8346 for a free estimate and a straight answer on what your lot will actually support.

Rowan Construction Group Plano writes the price down flat before any tool comes out. That includes the feasibility findings, so you know the real number before you commit to a build.

A second-story addition that matches the existing roofline

Why the First ADU Cost in Plano Is the Lot Check

Before we quote a dollar figure for an ADU in Plano, we run a lot-coverage and deed-restriction check. Building on a Willow Bend or Russell Creek lot without that step can produce a structure that cannot be permitted, which means the construction budget was spent understanding the wrong problem.

Plano is a built-out, largely master-planned suburb. The greenfield era is over here, and most of the lots that matter for an ADU are in subdivisions platted in the 1980s through the 2000s. Those deeds often layer private restrictions on top of the city’s unified development code, and an HOA architectural committee may weigh in again. Three layers of rules, three different answers on where the structure can sit and how many square feet it can contain.

The pre-construction feasibility costs in Plano usually break down like this:

  • Survey update: $400-$800. A current plat matters because setbacks and lot coverage get measured against it, not against a plat from 1994.
  • Zoning compliance review: a written read of your lot against the city’s unified development code, including placement and size limits for accessory structures.
  • HOA architectural approval: where the subdivision has one, plans go to the committee before the city sees them.
  • City permit fees: paid to Plano before construction begins.

Total pre-construction cost often lands between $1,500 and $3,500. It’s the smallest line on the whole project and the one that decides whether the rest of the numbers are real.

Plano ADU Construction Cost Ranges

Here are the ranges we work from on Plano lots, written as line items so you can compare them to any other quote you’ve been handed.

Project type Typical range
Detached ADU on slab (with clay-soil drainage correction) $120,000-$220,000
Garage conversion ADU $30,000-$80,000
ADU construction, general band $90,000-$220,000
Home addition (attached, non-ADU) $45,000-$130,000
Utility connections (separate meter, water/sewer taps, HVAC zoning) $8,000-$15,000
Pre-construction feasibility (survey, zoning review, HOA, permits) $1,500-$3,500

The Home Additions & ADU in Plano page covers the design and permitting sequence in more depth. For the broader trade picture, the Home Additions & ADU page walks through how attached additions differ from detached structures.

Why the Slab and Drainage Line Is Not Optional in North Texas

The expansive black clay under Plano’s slab-on-grade subdivisions moves with every wet-dry cycle. A detached ADU sits on its own foundation, and if grading and drainage aren’t corrected up front, the structure inherits the same movement problems that show up across Plano homes of a certain age. A drainage correction is a line item in every detached quote, not a surprise added later.

A framer checking new wall framing on a home addition

The Utility Costs National Guides Leave Out

Most ADU cost guides stop at the shell. In Plano, connecting a second dwelling to services is its own budget, and it’s the line that most often blows a homeowner’s plan.

  • Separate electric meter: a rental or a long-term in-law suite needs its own service and meter, which means a licensed electrician, a panel, and coordination with the utility.
  • Water and sewer taps: a new tap through Plano’s public works department, with the fees that come with it.
  • HVAC zoning: a second thermostat zone or a dedicated system, because one air handler sized for the main house won’t serve a detached structure.

Budget $8,000 to $15,000 for this group. A quote that omits utilities isn’t wrong on purpose; it’s just incomplete, and incomplete quotes are how ADU projects go sideways.

How Rowan’s Written Price Handles the Feasibility Question

Under Clause 1 of The Haven Standard, the price is written before anyone starts, and the scope is written with it. On an ADU that means the feasibility findings are folded into the quote. If the lot can’t support the structure type you’re planning, that determination happens before any construction money changes hands, not after a crew has mobilized.

Rowan Construction Group Plano has delivered more than 4,000 projects since 2007, and every one carried a written flat price before work began. No change proceeds without a signed change order. That’s the administrative discipline behind projects finishing within a few percent of the agreed number.

The quotes we hand you draw on fifty-plus vetted material brands, including Owens Corning and IKO roofing systems, so the numbers reflect honest material cost rather than inflated allowances. If you’ve already got a quote from another contractor, we’ll review it line by line at no charge through our Free Second Opinion offer. Our technicians have up to 19 years of experience, and every visit comes with a documented photo record as a standard deliverable. You’ll see the condition of the substrate, the grading, and the connections, in writing.

What the 365-Day Done Right Promise Covers on a Detached ADU

A structure used as a rental or an in-law suite carries higher stakes than a bedroom addition. It has its own roof, its own plumbing, its own electrical service, and a tenant or family member who depends on all of it. The 365-Day Done Right Promise sits behind the work: if it isn’t done right, Rowan makes it right. The guarantee is written into the terms you receive, not buried in an asterisk.

The photo record matters here too. When the crew leaves, you have evidence of what was found and what was done, from footings and drainage to the final utility connections. That documentation is what you’ll want if a question comes up in month eleven.

FAQs

What Our Customers Say

★★★★★ 5.0 from 5+ reviews

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

- Xavier L.

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

- Emil R.

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

- Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
A new black aluminum pool fence with a gateA new curved paver walkway to the front porchA galley kitchen opened up to the dining room with a new peninsulaA walk-in shower with large-format tile and a built-in nicheA standing-seam metal roof over a covered porchA new casement window over a kitchen sink

Explore more projects

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise
Need Construction help in Plano? Licensed & insured · free written estimates
Call (844) 761-8346

Request a Free Estimate

Tell us what's going on in Plano. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Call Now - 24/7 Dispatch
Local Service Coverage
Call Now - 24/7 Dispatch