Fast, Reliable Bathroom Remodeling Across Allen
If you own a home in Allen and you’re planning a bathroom remodel, you’re probably starting with the same question everyone does: what will this actually cost, and how long will it take? A full bathroom remodel in Allen typically runs $9,000 – $28,000, and on the higher end of that range the calendar is set by material lead times more than by labor. We’re Rowan Construction Group, and we’ve spent our working lives inside Allen bathrooms – from the brick traditionals off Watters Crossing to the rebuilds near downtown at Main and Belmont. We know the ZIP codes here (75013 and 75002), the subdivisions, and the clay underneath them. Call (844) 761-8346 to schedule your free estimate.
Why Rowan Construction Group Plano Is Allen’s Preferred Bathroom Remodeling Company

Allen homeowners don’t buy enthusiasm. They read the three-star reviews, they want a number they can compare, and they’re understandably skeptical of a contractor who says “call for a quote.” That’s why every project starts with a flat written price and a written scope before anyone picks up a tool. It’s the founding discipline behind The Haven Standard, and it’s why we’ve kept projects within a few percent of the agreed cost across 4,000-plus jobs since 2007 – not a slogan, a documented record.
Allen is a particular kind of market. The city grew from roughly 8,000 people in 1990 to over 100,000 today, and most of that housing went up in two compressed waves: late-1990s and early-2000s brick traditionals in Twin Creeks, Bethany Ridge and Watters Crossing, plus a newer infill and teardown-rebuild wave around the old downtown at Main and Belmont. There’s almost no pre-1980 housing stock. That means trade work here skews toward “first-cycle” renovation – 20-to-30-year-old homes hitting the roof, HVAC and window replacement window all at once – rather than historic restoration. It also means we approach an Allen bathroom knowing the substrate, plumbing and slab are all at the same stage of life.
Our technicians bring up to 19 years of experience to Allen bathrooms, and every crew member is background-checked and uniformed before they arrive. A live person answers the phone 24/7, and every visit includes a documented photo record – the condition of the subfloor, the rough-in, the tile membrane – as a standard deliverable, not an upgrade. You’ll have evidence of what was found and what was done.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Bathroom Remodeling Services in Allen
These are the Allen projects we’re called for most often. Each one starts with the same question: is the substrate and foundation stable enough to build on? You can see the full range of what we do on our Bathroom Remodeling service page.
Full Bathroom Remodeling
A full bathroom remodel in Allen means gutting to the studs and rebuilding the rough-in, the waterproofing and the finishes in one coordinated scope. In Twin Creeks and Bethany Ridge, the existing subfloor around the tub or shower often shows signs of slow water damage, and the slab may have shifted. We open the subfloor, assess what’s actually there, and write any needed piering or leveling into the scope before ordering finishes. That sequencing is everything.
Walk-In Showers & Shower Remodeling
A walk-in shower installation in Allen runs $4,500 – $12,000, and most of the cost sits in the waterproofing and the glass. We use a proper bonded membrane rather than backer board and paint-on sealer, because a shower that leaks behind the tile in a 25-year-old Allen home is a much bigger fix than the shower itself. Tile choice and niche layout get selected against a written allowance, so the number stays where it started.
Tub-to-Shower Conversion
Tub-to-shower conversions in Allen typically run $3,500 – $10,000 and are the most common single upgrade we see in the early-2000s homes off Alma Drive and Bethany. The tub comes out, the drain relocates, and the footprint becomes a full walk-in. Because the demolition exposes the framing, we photograph the wall cavity before it’s closed – the record is yours.
Vanities, Tile & Fixtures
Vanity installation in Allen runs $800 – $3,000, though on the high side of that you’re into custom cabinetry with a furniture-grade finish. Tile and fixtures are where designer selections outrun allowances, so we publish the allowance in writing before you ever select a slab. We source from KraftMaid and Wellborn for cabinetry and Kohler and Toto for fixtures, and the written quote reflects real brand pricing rather than an inflated placeholder.
Trusted Brands We Service in Allen
Custom cabinetry is the schedule driver on any high-end Allen bathroom, and the brand you choose determines the lead time. We work with KraftMaid and Wellborn cabinets because both publish realistic lead times – typically 8 – 12 weeks for custom orders – and we build that into the written schedule before demolition begins. We don’t stock parts locally; instead, sourcing runs through our vetted brand network of fifty-plus manufacturers, so the quote you sign reflects honest numbers on cabinet boxes, frameless glass, and designer tile.
Common Bathroom Remodeling Problems We See in Allen Homes
- Foundation movement under the bathroom slab. North Texas sits on blackland Prairie clay that shrinks and swells with the wet-dry cycle, and a 20-to-30-year-old slab in Twin Creeks or Bethany Ridge often needs piers before a remodel can be permitted. Skipping that evaluation is how a $20,000 bathroom turns into a $40,000 one.
- Slow water damage behind tub surrounds. The tub and shower in an early-2000s Allen home have usually been leaking slowly for years, and the subfloor shows it once you open the floor. We document it in photos before recommending repair, then write it into the change order.
- Long lead times stalling the project after demolition. Frameless glass and custom cabinets ordered too late leave a bulldozed bathroom sitting open for weeks. We confirm foundation stability and lock in lead times before the order goes in.
- Allowance overruns. When a written allowance schedule isn’t set for tile and fixtures, designer selections quietly exceed the budget. Every finish gets a written dollar figure before selection.
See the difference
Before
After
Before
After
Before
AfterPricing for Bathroom Remodeling in Allen, TX
Allen bathroom remodeling pricing sits on a wide band because the sub-services are so different. A full gut remodel runs $9,000 – $28,000. A walk-in shower installation runs $4,500 – $12,000. A vanity install runs $800 – $3,000. Where your project lands depends on whether foundation work is needed, whether you’re ordering custom cabinets, and how far designer finishes push past the allowance. Under The Haven Standard’s Clause 1, the price is written before anyone starts – flat, with a written scope and a written warranty. If you have a competitor’s quote in hand, our free second opinion reviews it line by line at no charge.
| Service | Typical Allen Price Range |
|---|---|
| Bathroom Remodel | $9,000 – $28,000 |
| Walk-In Shower Installation | $4,500 – $12,000 |
| Bathroom Vanity Installation | $800 – $3,000 |
We Also Serve Cities Near Allen
We work throughout Collin County, including Fairview, Lucas, Plano and Murphy, alongside our work across Allen. Clay soil, hail and high winds along the US-75 corridor hit these neighbors the same way they hit Allen, so the foundation-first sequencing applies. If you’re in Allen or nearby, the process is identical.
Serving Allen, TX – Our Local Coverage Area
We serve Allen and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Bathroom Remodeling in Allen

It’s the first thing we evaluate. The blackland Prairie clay under Allen swells and shrinks with the wet-dry cycle, and a 25-year-old slab in Twin Creeks or Bethany Ridge has likely moved at least a little. On many Allen remodels that means a foundation evaluation before permitting, and any needed piering gets written into the scope before long-lead items are ordered. Skipping this step is how a tight tile layout turns into a misfit. Call (844) 761-8346 for a free estimate that includes the foundation check.
Custom KraftMaid or Wellborn cabinetry runs 8 – 12 weeks, and frameless glass shower enclosures run 3 – 6 weeks. Neither is negotiable; both drive the calendar, not the labor. We order both after confirming foundation stability, because ordering a custom cabinet against a slab that’s still shifting is how you end up with a change order on day one. Call (844) 761-8346 and we’ll build the timeline into your written quote.
Yes, most Allen bathroom remodels require a permit, and any work that touches the plumbing rough-in or structural framing does without exception. The permit inspection sign-off confirms the rough-in and structural work are approved before walls are closed. We handle the permitting, and no change proceeds without a signed change order. Call (844) 761-8346 to start your free estimate.
Two things: a written scope that captures foundation, plumbing and finishes before demolition, and a written allowance schedule for tile and fixtures so designer selections don’t quietly exceed budget. Change orders are inevitable when the scope is vague – they mostly disappear when the number is written down first. And when a change is genuinely needed, nothing proceeds until the change order is signed. Call (844) 761-8346 for a written quote you can compare.
A draw schedule is the written plan for when each payment is released – typically tied to completed milestones like demolition, rough-in inspection, and tile installation. It matters because it protects you from paying ahead of work you haven’t seen, and it keeps the project moving without lump-sum surprises. Ours ties to the same written scope and change order discipline. Call (844) 761-8346 to review the schedule with us.
Get Your Free Written Estimate in Allen
If you’re planning a bathroom remodel in Allen and want a dollar figure on paper before you commit to anything, that’s exactly what we do. Call (844) 761-8346 for a free estimate – we’ll bring the photo record, the written scope, the allowance schedule, and an honest number. Backed by The Haven Standard and the 365-Day Done Right Promise: if it’s not done right, we make it right. Not a handshake – a written guarantee.
Written by the team at Rowan Construction Group.