A Rowan company - serving Plano, TX
A remodeled primary bathroom with a soaking tub and a walk-in shower
Bathroom Remodeling · Richardson, TX

Bathroom Remodeling in Richardson - Fixed Price, Set Finish Date

Free in-home consult and a written, line-item quote before demo starts. We work one bathroom at a time so your house stays livable, and the signed price is the final price. Licensed, insured, permits handled.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansA Local Team in Plano
A remodeled hall bathroom with subway tile and a floating vanity
A remodeled hall bathroom with patterned floor tile and painted walls
A wood double vanity with two mirrors after a bathroom remodel
A new clay tile roof
New double-hung windows in a dining room
A new front yard fence with a matching gate
A new paver pool deck
An open kitchen and dining area after a remodel
Every visit starts with

Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled

We have financing partners for your dream remodel*On approved credit; ask us about your options
Get your free estimate

Fast, Reliable Bathroom Remodeling Across Richardson

If you own a home in Richardson, TX, and the master bath still has the fiberglass shower pan and oak-veneer vanity it came with, you already know what needs to go first. Most full bathroom remodels here land between $9,000 and $28,000, and the work starts with paperwork, not sledgehammers – reading your builder warranty and HOA architectural guidelines before anyone swings a hammer. We know the east-side streets off the President George Bush corridor and the older ranch blocks near 75080 equally well, and we quote a flat written price before work begins. Call (844) 761-8346 to schedule your free estimate.

Call (844) 761-8346

Why Rowan Construction Group Plano Is Richardson’s Preferred Bathroom Remodeling Company

A tile setter installing wall tile in a shower

Richardson homeowners tend to research a contractor the way they research a refrigerator – reading the three-star reviews, wanting the number on the page before they call. That suits how we work. Every quote is a flat price with a written scope and written warranty, delivered before any work starts. Bring a competitor’s estimate and we’ll go through it line by line at no charge under our Free Second Opinion offer.

Our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed. A live person answers the phone 24/7, and a documented photo record comes with every visit as a standard deliverable – not an upgrade you pay for. For renovations in Richardson, that record matters: when a shower surround comes out, you’ll see exactly what the waterproofing looked like underneath.

We work under The Haven Standard, and Clause 1 is the whole point – the price is written before anyone picks up a tool. No work proceeds on a change until the change order is signed. Across 4,000-plus projects since 2007, that discipline has kept jobs within a few percent of the number the customer agreed to. Your 365-Day Done Right Promise means if it’s not done right, we make it right.

Explore

Styles & brands we work with

  • Kitchen remodeling
  • Bathroom remodeling
  • Home additions & ADU
  • Roofing
  • Windows & doors
  • Driveway & pavers
  • Fence

Our Bathroom Remodeling Services in Richardson

Full Bathroom Remodeling

A full remodel in Richardson usually means gutting to the studs and rebuilding the wet wall, subfloor and surround. In the newer 75082 homes near the Bush corridor, that often starts with a warranty read-through so your builder coverage survives the project. Full remodels run $9,000 – $28,000 depending on tile grade, fixture brand and whether the rough-in moves.

Walk-In Showers & Shower Remodeling

Walk-in shower installation is our most requested upgrade on Richardson’s east side, where a curbless tile shower with a frameless glass enclosure replaces the original molded pan. Expect $4,500 – $12,000. We check load-bearing and blocking before specifying heavier tile or glass, since builder-grade subfloors weren’t always framed for the weight.

Tub-to-Shower Conversion

Pulling a rarely used garden tub to gain a full-size shower is common in Richardson’s master suites, and it’s a plumbing-adjacent job: the drain and supply positions have to be confirmed once the tub is out. Tub-to-shower conversion typically runs $3,500 – $10,000. See our Bathroom Remodeling team for the full scope across every fixture type.

Vanities, Tile & Fixtures

Vanity installation in Richardson runs $800 – $3,000, and it’s usually the first thing owners change because the original particleboard cabinet swells at the toe kick. We set Kohler and Toto fixtures, lay tile over a proper membrane, and price selections against written allowances so nothing surprises you at the end.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (844) 761-8346

Trusted Brands We Service in Richardson

Most of the fixtures and materials you’ll weigh in a Richardson bath are brands we work with often: KraftMaid and Wellborn cabinets, Cambria and Caesarstone counters, Kohler and Toto fixtures. We don’t stock parts locally – the quote prices real materials, not inflated guesswork. If you’re matching an existing vanity or want a specific tile, name it and we’ll build the allowance around it. Fast turnaround on quotes, and a written price before any work starts.

Common Bathroom Remodeling Problems We See in Richardson Homes

  • Tile replaced before the warranty was read. Pulling the shower or floor tile first can void a later pan or waterproofing claim, because the assembly was altered. Read the builder warranty before demo, not after.
  • Custom vanity ordered before HOA approval. Ordering a larger shower footprint or bespoke vanity before architectural review clears it forces a resubmittal and stalls the draw schedule. Approval first, order second.
  • Builder-grade subfloor asked to carry more. A heavier tile or a frameless glass enclosure adds load the original framing may not have been planned for. Check blocking and load-bearing before specifying either.
  • Clay-soil movement under the slab. North Texas clay shrinks and swells with the wet-dry cycle, and older Richardson baths sometimes show hairline cracks in floor tile where the slab has moved. We look at the substrate before laying anything new.

Pricing for Bathroom Remodeling in Richardson, TX

Here’s what bathroom work actually costs in Richardson, priced to the job rather than to a brochure. The range you land in depends on tile grade, fixture brand, whether the rough-in moves, and how much framing is exposed once the old surround comes out. Every one of these is a flat written price after we’ve seen the room, and changes only move forward on a signed change order.

Service Typical Richardson Range
Bathroom Remodel $9,000 – $28,000
Small Bathroom Remodel $5,000 – $12,000
Walk-In Shower Installation $4,500 – $12,000
Tub-to-Shower Conversion $3,500 – $10,000
Shower Replacement $3,000 – $8,500
Bathroom Vanity Installation $800 – $3,000
Before & after

See the difference

Before - Recent ProjectBeforeAfter - Recent ProjectAfter
Recent Project
Before - Full RestorationBeforeAfter - Full RestorationAfter
Full Restoration
Before - Complete UpgradeBeforeAfter - Complete UpgradeAfter
Complete Upgrade

The East-Side Difference: Warranty and HOA Before Demo

Richardson’s newer 75082 homes along the Bush corridor are largely builder-spec, which flips the usual order of a remodel. Here the first real decision isn’t tile – it’s which finishes you can change without voiding a builder warranty, and which need architectural review approval from your HOA. Get that sequence wrong and a claim you were counting on can be denied, or a custom vanity can arrive before the paperwork clears and stall the whole draw schedule. We treat the warranty read-through and the HOA submittal as the first line items, not the last.

The typical job looks like this. In a builder-grade Richardson bathroom, the first failures are usually a fiberglass or acrylic shower pan that flexes underfoot and a vanity cabinet whose particleboard swells at the toe kick – both traceable to spec-level moisture exposure rather than installation error. A qualified local pro reads the builder warranty and HOA guidelines before demo, then verifies the rough-in and subfloor once the surround is out, since a pan replacement often reveals whether the waterproofing was done to code or just to the minimum. From there it becomes a normal scope: tile and fixtures against written allowances, any framing changes priced as a change order, and a punch list closed after inspection sign-off. This is the kind of redevelopment-and-detail work that defines Richardson more than the new-build subdivisions up in McKinney or Frisco.

The sub-services that come up most on our Richardson jobs are walk-in shower installation, bathroom vanity installation, and tub-to-shower conversion. If you’re also weighing other trades, our written-price discipline runs across every one of them – from the paver and concrete work using Oldcastle and Quikrete materials out front to an Abodu-style ADU out back. Same Clause 1, same signed change orders.

We Also Serve Cities Near Richardson

Richardson sits close to a handful of other North Texas suburbs, and we take bathroom remodeling work in Plano, Garland, Murphy and Sachse as well. If you’re near the Plano border on the west side or out toward Murphy to the east, the same written-price, signed-change-order process applies. Call (844) 761-8346 to check scheduling for your address.

Serving Richardson, TX – Our Local Coverage Area

We serve Richardson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.

FAQs – Bathroom Remodeling in Richardson

Get Your Written Price Before Any Work Starts

A remodeled family room with new windows and a window seat

Whether you’re in a builder-spec home off the Bush corridor or an older ranch near 75080, the first move is the same: get the number in writing. Call (844) 761-8346 to schedule your free estimate for bathroom remodeling in Richardson. You’ll get a flat written price, a written scope, a documented photo record, and the 365-Day Done Right Promise behind the work.

Written by the team at Rowan Construction Group Plano.

Why Richardson Chooses Rowan Construction Group Plano

We set the standard for bathroom remodeling in Richardson.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Richardson

Getting your bathroom remodeling project started is simple.

1

Call or Request a Free Estimate

Tell us about your bathroom remodeling project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local bathroom remodeling pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Richardson Customers Say

Trusted by homeowners across Richardson and surrounding areas.

★★★★★

"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."

Xavier L.
★★★★★

"Talked us out of the larger scope we came in asking for, because it would not have added the value we thought."

Emil R.
★★★★★

"Driveway replaced properly with a base that will actually last. They explained why the cheaper quote was cheaper."

Reggie O.

Ideas for every part of the house

Kitchens, baths, roofs, windows, fences and patios: the projects that make a house work better inside and out.

Read our project guides
New painted shaker cabinets with an organized deep drawerA remodeled kitchen with a waterfall island and wood cabinetsA single-story rear room addition with tall windows and a new patioA second-story addition that matches the existing rooflineA newly finished roof with a ridge vent and step flashingA new front entry door with glass sidelights

More services in Richardson

Every project below starts the same way: a free on-site visit and a written price.

Getting started with Rowan in Plano

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead walking the house with the homeowner during a free estimate

Free on-site estimate

A project lead walks the job with you, measures it and hands you a written, line-item price. No obligation.

Book an estimate
A crew arriving at a home with materials and tools

Your Plano team

A local vetted partner works across Plano and the towns around it, to the same written standard as every Rowan job.

Areas we serve
A worker laying floor protection before work starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Ready for Bathroom Remodeling in Richardson?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Richardson.

(844) 761-8346

Request a Free Estimate in Richardson

Tell us about your bathroom remodeling needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Send a Text
Local Service Coverage
Call Now - 24/7 Dispatch