







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterCabinet Installation & Refacing in Plano, TX
Cabinet refacing in Plano typically costs $4,800 – $9,500, while full cabinet replacement runs $9,000 – $28,000 depending on box quality, door style, and whether the layout changes. Refacing keeps your existing cabinet boxes and replaces only the doors, drawer fronts, and veneer; installation means new boxes entirely. Both are quoted with a flat written price before anyone touches a screwdriver, which is the whole point of how we work.
Rowan Construction Group Plano handles cabinets as part of a larger Kitchen Remodeling project or as a standalone job. We work with KraftMaid and Wellborn cabinet lines because their box construction and finish warranties hold up to Plano’s humidity swings, and because we can put real numbers on a quote instead of guessing. Call (844) 761-8346 and a live person answers, day or night.
Key Takeaways
- Refacing averages $4,800 – $9,500 in Plano; full replacement runs $9,000 – $28,000.
- Written flat price before work starts, backed by Clause 1 of The Haven Standard.
- No change proceeds without a signed change order.
- Background-checked, uniformed technicians with up to 19 years of experience.
- 365-Day Done Right Promise on every install and reface.

When You Need Cabinet Installation & Refacing
Cabinets don’t fail all at once. They fail in ways you notice slowly, then all at once. Here’s what Plano homeowners call us about:
- Doors that won’t stay closed or aligned. In Plano’s older ranch homes built through the 1970s and 1980s, particleboard boxes swell after a few summers of humidity and the hinges pull loose from stripped screw holes. Once a hinge has failed twice, refacing the front is usually the honest fix and replacement is the real one.
- Finish peeling at the sink and dishwasher edges. Steam and splashing degrade the thermofoil or laminate edge banding first. You’ll see it curling within a foot of the dishwasher vent on most 15-to-25-year-old cabinets.
- A layout that fights how you cook. If the pantry door hits the refrigerator handle or the corner cabinet is a dead zone you’ve stopped using, no reface will fix that. Boxes need to move, and that’s an installation job.
- Buying a house flipped between 2015 and 2022. Plano saw a wave of flips in neighborhoods like Willow Bend and Deerfield where cabinets were painted over rather than repaired. Paint over failing substrate buys two years, not ten.
- Adding an island or extending a run. A new island means matching door style and finish to existing cabinets, which is only possible if the line is still in production. KraftMaid and Wellborn both keep styles in rotation long enough to match, which matters more than most people realize until they can’t find a match.
- Soft-close and pull-out upgrades without a full remodel. Sometimes the boxes are fine and the hardware is 20 years old. We’ll tell you when that’s the case and quote a smaller job.
Our Cabinet Installation & Refacing Process
Every job follows the same sequence, and every step produces something you can keep: a written measurement, a written scope, a photo record, a signed change order if anything shifts.
- On-site measure and condition report. We check box construction (plywood vs. particleboard), plumb and level of the walls behind the cabinets, and whether the existing layout meets current clearances. You get photos of what we found, not a verbal summary.
- Written flat price and scope. Before any material is ordered, you receive a written price with the exact door style, box material, hardware, and warranty terms spelled out. A competitor’s quote can be reviewed line by line at no charge under our Free Second Opinion offer.
- Material order and scheduling. KraftMaid or Wellborn boxes and doors arrive within their published lead times. We confirm the delivery window in writing and text you a confirmation, not a phone promise.
- Removal and substrate prep. Old cabinets come out, walls get patched and leveled, and any water damage behind the sink or dishwasher gets addressed before new boxes go in. This is the step most crews skip and it’s why cabinets go out of square within two years.
- Installation or refacing. New boxes get shimmed, screwed to studs, and checked for level at the countertop line. Refacing means new veneer on the box faces, new doors and drawer fronts, new hinges and slides. Both get the same photo record on completion.
- Final walkthrough and 365-Day Done Right Promise. You inspect every door, every drawer, every soft-close mechanism. If anything isn’t right within a year, we make it right under the Haven Standard. Documented, not a handshake.

Cabinet Installation & Refacing Pricing in Plano
Here are honest ranges for Plano, based on the door styles and box quality we actually install. Material grade drives most of the spread, and layout changes drive the top end.
| Scope | Typical Range |
|---|---|
| Refacing, standard door and drawer fronts | $4,800 – $7,200 |
| Refacing, premium door style with soft-close hardware | $7,200 – $9,500 |
| Full replacement, stock-grade boxes | $9,000 – $16,000 |
| Full replacement, semi-custom boxes (KraftMaid, Wellborn) | $16,000 – $24,000 |
| Layout change (island, wall removal, run extension) | Add $2,500 – $8,000 |
| Hardware upgrade only (soft-close, pull-outs) | $650 – $1,800 |
What moves the number: door material (thermofoil vs. painted maple vs. stained oak), box construction (particleboard vs. plywood), whether the countertop has to come off (it usually does for a full replacement, and that’s a separate line), and whether the wall behind the cabinets needs work. Plano homes built before 1995 often have drywall damage behind the sink cabinet that nobody sees until the box comes out. We price that in the written scope, not as a surprise.
Under Clause 1 of The Haven Standard, the price is written before anyone starts. If a change comes up mid-job, no work proceeds on it until the change order is signed. That’s the discipline that’s kept our projects within a few percent of the agreed cost across 4,000-plus jobs since 2007.
Free estimates, every time. Call (844) 761-8346 for an exact quote on your cabinets.
Why Plano Homeowners Choose Rowan for Cabinets
Cabinets are a documentation problem as much as a carpentry problem. Anyone can hang a box. Fewer crews can show you the plumb reading behind it, the signed change order when the wall was out of square, and the photograph of the shim pack that fixed it.
What you get on every cabinet job:
- Background-checked, uniformed technicians with up to 19 years of experience
- A documented photo record on every visit, included as standard
- A live person answering calls 24/7
- Written flat price before work starts
- 365-Day Done Right Promise backed by The Haven Standard
We work alongside other trades when the job calls for it. If your project grows into a full Kitchen Remodeling in Plano, the cabinet scope stays on the same written price and the same change-order discipline. Sourcing runs across fifty-plus vetted brands, from KraftMaid and Wellborn cabinets to Cambria and Caesarstone countertops, so the quote reflects real material costs rather than inflated ones.
Reface or Replace? How to Decide
The honest answer depends on the boxes, not the doors. If the cabinet boxes are solid plywood, plumb, and the layout works, refacing saves 40 – 60% and gets you a decade or more. If the boxes are swollen particleboard, out of square, or the layout fights how you cook, refacing throws good money at bad structure.
Here’s how we check, and you can check the same way before you call:
- Open a lower cabinet door and look at the inside edge of the box. Plywood shows layered grain; particleboard shows compressed sawdust and swells where it got wet.
- Put a level on the cabinet face frame. If it’s off by more than 1/8 inch over three feet, the boxes have moved and new doors will fight the same problem.
- Press on the bottom of the sink cabinet floor. Soft spots mean water damage and a replace, not a reface.
- Check whether the door style is still in production. If it isn’t, a partial reface won’t match and a full replace is the cleaner path.
FAQs – Cabinet Installation & Refacing
How much does cabinet refacing cost in Plano?
Cabinet refacing in Plano runs $4,800 – $9,500 for a standard kitchen, with premium door styles and soft-close hardware pushing the top of that range. Thermofoil and laminate fronts sit at the low end; painted maple and stained oak sit higher. Call (844) 761-8346 for an exact written price on your kitchen.
Is it cheaper to reface cabinets or replace them?
Refacing is usually cheaper by 40 – 60% when the existing boxes are sound, running $4,800 – $9,500 versus $9,000 – $28,000 for replacement. If the boxes are swollen particleboard, out of square, or the layout needs to change, replacement is the better spend because refacing doesn’t fix structure. Call (844) 761-8346 and we’ll tell you which applies to your cabinets before you commit to either.
Can you match my existing cabinet door style?
We can match it if the style is still in production with the manufacturer, which is why we work with KraftMaid and Wellborn – both keep popular styles in rotation long enough to match additions and replacements. If the original line is discontinued, we’ll show you the closest matches and price a full reface so every door matches rather than a partial one that doesn’t. Call (844) 761-8346 with a photo of your current door and we’ll confirm the match.
How long does cabinet installation take in Plano?
A standard cabinet installation takes 3 – 5 working days once materials arrive, and refacing takes 2 – 3 days. Layout changes that require wall work or plumbing moves add time. Lead times on KraftMaid and Wellborn boxes are confirmed in writing at order, and you get a text confirmation when the delivery window is set. Call (844) 761-8346 for a scheduling estimate on your project.
Areas We Serve Around Plano
Cabinet work in Plano runs from the older ranch homes near downtown to the newer builds out toward Legacy West, and the two need different approaches. The 1970s and 1980s homes off Park Boulevard and Spring Creek Parkway often have the original particleboard boxes with water damage behind the sink, which is a replace-and-repair job. The 2010s and 2020s homes in Willow Bend and Deerfield tend to have good boxes and dated fronts, which is a reface job.
We also work in nearby Frisco, McKinney, Allen, Richardson, and Carrollton. If you’re planning a wider project, the same discipline applies to Bathroom Remodeling in Plano, Home Additions in Plano, and Roofing in Plano. Homeowners researching cabinet upgrades often want to see how the rest of the house is handled, and the process doesn’t change: written price, signed change order, photo record.
If you’re still comparing contractors, our Kitchen Remodeling Cost Guide for Plano shows what the full project runs and how cabinets fit into the total. The Free Second Opinion offer applies to any written cabinet quote you’ve received – bring it and we’ll review it line by line at no charge. And if you want to know how we handle the rest of the project, read about Our Kitchen Remodeling Process or check the frequently asked questions page.
Get a Written Cabinet Price in Plano
Cabinets are the single largest cabinet-and-countertop line in most Plano kitchen budgets, and the spread between a reface and a full replace is wide enough that it’s worth a real measurement before you decide. We’ll measure, check the boxes, and hand you a flat written price with the door style, box material, and warranty spelled out. Estimate is free. Call (844) 761-8346 and a live person answers, day or night.
Written by the team at Rowan Construction Group Plano, serving Plano.


