







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Kitchen Remodeling for Plano Homeowners
Kitchen remodeling in Plano typically runs $14,000 – $45,000, and the number that matters is the one in writing before anyone picks up a tool. Most homeowners who call us are stuck on the same problem: three quotes, three wildly different scopes, and no way to compare them line by line. We fix that by handing you a flat written price, a written scope, and a written warranty before demo day – our technicians have up to 19 years of experience, and every crew member is background-checked and uniformed. Call (844) 761-8346 to schedule your free estimate; a live person answers around the clock, and your visit includes a documented photo record as standard.
What Our Kitchen Remodeling Service Includes

Every kitchen project starts with the same question: what actually needs to change, and what can stay. Here’s how we break the work down so you know exactly what you’re paying for.
Full Kitchen Remodeling
A full remodel means the room comes down to the studs and goes back together as a coordinated system – cabinets, counters, tile, lighting, plumbing rough-in, and the substrate underneath. You need it when the layout no longer fits how you cook, or when older materials are failing in ways a cosmetic upgrade can’t hide. In Plano, we regularly see 1990s kitchens in Willow Bend and Deerfield where the original particleboard cabinet boxes have swelled around the sink base, and no amount of new paint solves a moisture problem that’s inside the cabinet carcass. We photograph the condition before we quote it, so the price reflects what’s really there.
Cabinets & Countertops
Cabinets and countertops are the two line items that move a kitchen budget most, so we quote them separately and explain the tradeoffs. We work with KraftMaid and Wellborn cabinet lines, and with Cambria and Caesarstone quartz for the counters – brand names you can look up and compare. Whether you’re replacing both or keeping the boxes and changing only the top, you get a written price per component rather than one lump number you can’t unpack.
Backsplash
A backsplash is the smallest line item in the room and the one most likely to look wrong if the layout isn’t planned before the first tile goes up. You need it when the drywall behind the range is stained from splatter, or when the countertop changed and the old 4-inch splash no longer lines up. We set out the tile pattern against the actual outlet and cabinet positions first, because centered on the wall and centered on the range are two different drawings.
Tile & Flooring
Kitchen flooring has to survive dropped pans, spilled oil, and a century of Plano’s expansive clay soils shifting the slab underneath. We check the substrate before we recommend a material – a floor that’s flat today can telegraph cracks through rigid tile if the slab has a soft spot. Luxury vinyl plank, porcelain tile, and engineered wood all have a place here; the right one depends on what we find under the existing floor, not on what’s trending.
Kitchen Design & Layout
Layout decisions – where the range sits, how far the island is from the sink, whether the refrigerator opens into a walkway – cost nothing to change on paper and thousands to change after cabinets are ordered. You need design work before you buy anything, especially in the tighter galley kitchens common in older Plano subdivisions off Spring Creek. We measure the actual work triangle and the clearances to code, then show you the plan before anything is ordered.
Small & Partial Kitchen Remodels
Not every kitchen needs a full rebuild, and we’ll tell you when it doesn’t. A partial remodel might be a new countertop and backsplash, a cabinet reface with new doors, or a single wall opened up to connect the kitchen to the dining room. These projects move faster and cost less, and we scope them just as tightly – a written price, a written scope, no surprises mid-job.
Cabinet Installation & Refacing
Refacing keeps the existing cabinet boxes and replaces the doors, drawer fronts, and veneer; installation means new boxes entirely. Refacing makes sense when the boxes are solid and square and the finish is what’s dated – we check for sagging shelves and water damage before recommending it. When we install new cabinets, we shim and level to the room’s actual floor and walls, because Plano homes rarely have a perfectly plumb corner no matter what year they were built.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Service for Kitchen Remodeling
We work with KraftMaid and Wellborn cabinet lines often enough to know where each one earns its price and where it doesn’t. KraftMaid’s semi-custom sizing fits the odd wall dimensions in Plano’s 1980s and 1990s builds, while Wellborn’s door styles tend to suit the cleaner transitional look a lot of homeowners in this market are after. On the countertop side, we install Cambria and Caesarstone quartz, and we know how each handles a sink cutout and a seam placement – the two spots where a quartz install either looks seamless or doesn’t.
We also work with ActiveYards fencing and Belgard and Tremron hardscape products on the exterior projects that often follow a kitchen remodel, since the same homeowner is usually thinking about the whole house. Whether you have KraftMaid, Wellborn, or any other cabinet make already in place, we can help you plan the next step.
Signs You Need Kitchen Remodeling Right Now
- Cabinet doors that no longer close squarely: A door that rubs the frame or hangs open on its own usually means the hinges have pulled from softened particleboard, not that the hinge is bad. Once the box is compromised, refacing won’t hold and replacement is the honest answer.
- Soft or spongy flooring near the sink or dishwasher: Water that’s been leaking slowly under a cabinet can rot the subfloor before it ever shows on the surface. Press down near the toe kick – if it gives, there’s moisture getting in somewhere.
- Countertop seams that have darkened or lifted: A laminate or solid-surface seam that’s curling or stained is letting water into the substrate below. That’s a small repair now and a cabinet replacement later if it keeps going.
- A layout that fights you every day: If you’re crossing the kitchen three times to get from the fridge to the sink, the work triangle is broken. That’s a design problem a remodel fixes and new appliances won’t.
- Outdated lighting and too few outlets: Kitchens built before the 2000s often have one ceiling fixture and two countertop outlets for a room that now runs a coffee maker, air fryer, and stand mixer. Adding circuits is a licensed electrical task and a good reason to plan the whole room at once.
Our Kitchen Remodeling Process – Step by Step
- 1
On-site measurement and condition check. We measure the room to the inch and inspect what’s behind the cabinets and under the floor – the substrate condition, the plumbing rough-in, and whether the existing electrical can carry a modern kitchen load. Every visit includes a documented photo record, so you see what we found rather than taking our word for it.
- 2
Written scope and flat written price. Under Clause 1 of the Haven Standard, the price is written before anyone starts. You get a line-item scope that names cabinets, countertop material, tile, and labor separately – a number you can screenshot and compare against any other quote.
- 3
Design and material selection. We set the layout and confirm cabinet sizing, countertop slabs, and tile patterns before anything is ordered. Lead times on KraftMaid and Wellborn lines and on Cambria slabs get built into the schedule here, not discovered later.
- 4
Demo and rough-in with signed change orders only. Demolition opens the walls and occasionally reveals something the photos couldn’t show – a slow leak, an undersized circuit. If the scope has to change, no work proceeds on that change until the change order is signed. That discipline is why projects finish within a few percent of the number you agreed to.
- 5
Install, walkthrough, and written warranty. Cabinets, counters, tile, and fixtures go in, then we walk the finished room with you and hand over the written warranty and the photo record of the whole job. The 365-Day Done Right Promise backs it: if it isn’t done right, we make it right.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Kitchen Remodeling Cost in Plano?

A full kitchen remodel in Plano runs $14,000 – $45,000 depending on the size of the room and how far the work goes. A small or partial kitchen remodel typically runs $9,000 – $20,000. If you’re pricing components individually, cabinet installation runs $4,000 – $13,000, countertop installation $2,000 – $6,500, backsplash $800 – $2,500, and a kitchen island installation $3,000 – $10,000.
| Project | Typical Plano Range |
|---|---|
| Full Kitchen Remodel | $14,000 – $45,000 |
| Small Kitchen Remodel | $9,000 – $20,000 |
| Cabinet Installation | $4,000 – $13,000 |
| Countertop Installation | $2,000 – $6,500 |
| Backsplash Installation | $800 – $2,500 |
| Kitchen Island Installation | $3,000 – $10,000 |
What moves the number most is cabinet grade, countertop material, and whether the layout changes. Moving a sink or range means new plumbing and electrical rough-in, which adds cost a same-layout swap avoids. Quartz runs higher than laminate, and semi-custom cabinets run higher than stock sizing. The way to avoid overpaying is to get a line-item quote you can compare, not a lump sum – and to ask what’s excluded before you sign. Every free estimate we give includes the written scope, the flat price, and the photo record of the existing conditions. Bring a competitor’s written estimate and we’ll review it line by line at no charge. Call (844) 761-8346 for an exact quote on your kitchen.
Kitchen Remodeling Near Plano – Our Service Area
We work kitchens across Plano and the surrounding Collin and Dallas County suburbs, including Kitchen Remodeling in Richardson, Kitchen Remodeling in Allen, Murphy, Fairview, Lucas, Sachse, McKinney, Garland, Wylie, Rowlett, and Princeton. Scheduling depends on the project and material lead times, so we confirm dates with you when the written estimate goes out. Start with Kitchen Remodeling in Plano, or read more about our work before you call.
Serving Plano, TX – Our Local Coverage Area
We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Kitchen Remodeling in Plano

Kitchen remodeling is the process of updating a kitchen’s layout, cabinets, countertops, tile, flooring, and fixtures – either as a full rebuild down to the studs or as a partial update of specific components. It’s different from a repair, which fixes one broken thing, because a remodel coordinates several trades so the finished room works as a whole. We scope every remodel with a written price and a written plan before work starts, so you know what’s being replaced and what’s staying.
Most full kitchen remodels take several weeks from demo to walkthrough, and partial remodels move faster, though the exact timeline depends on the size of the room and the lead times on cabinets and countertop slabs. KraftMaid and Wellborn cabinet orders and Cambria slab availability are the usual pacing items, and we build those lead times into the schedule before demo day. Your written estimate includes the sequencing so you can plan around it. Call (844) 761-8346 and we’ll talk through the timeline for your specific kitchen.
Kitchen remodeling in Plano typically runs $14,000 – $45,000 for a full remodel, or $9,000 – $20,000 for a small or partial remodel. Individual components price out lower – cabinet installation at $4,000 – $13,000, countertops at $2,000 – $6,500, a backsplash at $800 – $2,500, and an island at $3,000 – $10,000. The biggest cost drivers are cabinet grade, countertop material, and whether the layout changes. Call (844) 761-8346 for an exact quote – estimates are free and always in writing.
Yes – we install both KraftMaid and Wellborn cabinet lines, and we know the sizing differences that matter in Plano’s older homes. We also work with Cambria and Caesarstone quartz for countertops. Whether you have KraftMaid, Wellborn, or any other cabinet make already in place, we can help you plan the next step.
A live person answers our phone around the clock, so you can always reach us when something urgent comes up – a burst supply line, a failed dishwasher valve, water under the cabinets. True emergencies get triaged right away, and planned remodels get scheduled based on material lead times. Call (844) 761-8346 and we’ll tell you honestly what needs to happen next.
Every kitchen remodel is covered by our written warranty and the 365-Day Done Right Promise: if it isn’t done right, we make it right. The warranty is written into the scope before work starts, not added after. You also get a documented photo record of every visit, so you have evidence of what was found and what was done. Call (844) 761-8346 to schedule your free estimate.
Clear the countertops and cabinets of everything you’ll need while the kitchen is out of use, and plan a temporary setup for coffee, snacks, and dishes – most families set up a folding table and a mini fridge in the dining room. Expect the room to be unusable for part of the project, and plan meals around it. We’ll walk you through the day-by-day sequence at the start so there are no surprises. Call (844) 761-8346 and we’ll get your free estimate on the calendar.
Schedule Your Kitchen Remodeling Service in Plano Today
Ready to get a real number for your Plano kitchen? Call (844) 761-8346 for a free estimate – you’ll get a written scope, a flat written price, and a written warranty before anyone picks up a tool. A live person answers around the clock, and our technicians have up to 19 years of experience. No hassle, no surprises, no change orders without your signature. Estimates are free and there’s no obligation.
Written by the team at Rowan Construction Group.












