







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Trusted Home Additions & ADU for Plano Homeowners
Most Plano homeowners who call us about an addition have already been turned down once. A lot on a 1990s cul-de-sac off Legacy Drive or in Deerfield, a rear setback that the city measures differently than a neighbor warned, or a family that needs a ground-floor suite for aging parents and can’t find a permit-ready path to it. Our technicians have up to 19 years of experience designing and building additions and ADUs across the metro, and we put the price in writing before anyone touches a plan. Call (844) 761-8346 and a live person answers around the clock.
What Our Home Additions & ADU Service Includes
Every project starts with a written scope and a flat written price, and nothing moves forward on a change without a signed change order. That discipline sits inside The Haven Standard, and it’s the reason we can tell you what a Plano addition will cost before the first permit is filed.
ADU Design & Permitting
An ADU (accessory dwelling unit) is a self-contained second home on the same lot, and the design and permitting stage is where most Plano projects succeed or stall. The City of Plano treats zoning, impervious cover, setbacks, and utility connections as separate review steps, so a set of drawings that reads well can still bounce at the first desk if the survey doesn’t match. We produce permit-ready drawings with a local survey overlay and walk the plan through Plano’s review process, cross-checking setbacks and lot coverage against the specific plat before we submit.

Garage Conversion ADU
Converting an attached garage into a living unit is usually the lowest-cost path to an ADU because the footprint, foundation, and roof already exist. It’s the right call when you have a two-car garage you rarely park in and want a rental unit or a suite for family, and it needs new insulation, HVAC, plumbing rough-in, and egress window work to meet residential code. Our garage conversions in Plano come in with a written line-item scope that separates structural work from finish work, so you can see exactly where the money sits.

New Detached ADU
A detached ADU is a freestanding structure in the backyard, and it costs the most but carries the most flexibility for a rental or a long-term family unit. Plano lots with deep rear yards on the west side hold these well, but the design has to respect the same setback and impervious-cover rules as the main house. We handle the full build from grading and slab to finishes, and we reference a brand like Belgard for the paver hardscape that ties a new unit to the existing house.

Junior ADU & Interior Conversion
A junior ADU or interior conversion carves a unit out of existing square footage inside the house, usually by reworking a bonus room, an oversized primary suite, or a seldom-used second living area. This is the answer when the lot won’t support a separate structure but the family still needs a private suite. We map the mechanicals, the shared walls, and the egress windows first, because those three items decide whether the conversion meets code and how the plumbing will route.
ADU Site Prep & Utilities
Site prep covers grading, drainage, the slab or pier foundation, and the utility runs that feed a new unit or an addition. In Plano’s clay-heavy soil, grade and drainage are non-negotiable – a slab poured without proper fall can move a foundation within a couple of seasons. We run the water, sewer, and electrical connections as a separate line item in the quote, with the trenching and inspection schedule spelled out so the utility tie-ins never appear as a surprise addition later.
Room Additions
A room addition extends the main house, whether that’s a primary suite, an expanded kitchen, or a family room that opens to the backyard. This is the most common call we get in Plano, and it’s the one where the tie-in between new and existing structure decides the outcome – how the roofline meets, how the HVAC trunk extends, and how the floor transitions. We document the existing condition before any framing starts, and the photo record we leave at the end includes the wall connections so you can see what was done and how.
Second Story Additions
A second story addition adds square footage in the air instead of the yard, which matters on Plano lots where the setback line leaves no room to build out. These projects are the most structural of the group because the existing foundation and framing have to be evaluated to carry the new load, and the answer is sometimes that a partial rebuild is required. We check the floor joists and footing capacity before we quote a second story, and that inspection is what tells you whether the price will hold.
Sunrooms & Enclosed Patios
A sunroom or enclosed patio turns an existing covered area into conditioned living space, and it’s the fastest way to add usable square footage with the least structural disruption. These work well in Plano because our summers push people indoors and a shaded, conditioned space lets them keep using the covered patio year-round. We handle the enclosure framing, the glazing, and the HVAC extension as one written package so the space stays comfortable through both the July heat and the January cold snaps.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Brands We Work With for Home Additions & ADU
Material choice on an addition or ADU carries the same weight as the structural work, because the surfaces are what you’ll notice every day for the next twenty years. For paver courtyards and walkways around a new ADU, we work with Belgard, a brand whose structured pavers hold up well against Plano’s expansive clay soil because the base and the interlock are specified tight. For fenced yards and privacy screens around a detached unit, we build with ActiveYards fence systems, and we know where their vinyl and aluminum styles hold their color best under the Texas sun.
Whether you already have a favorite brand or want our recommendation, we’ll match the material to the project and list it in the written scope. Whether it’s ActiveYards or Belgard or a different make entirely, we can help you choose and build with it, and the brand choice is documented in the quote before any work begins.
Signs You Need Home Additions & ADU Right Now
- You’re using a formal dining room or garage as a bedroom. That’s a sign the house has run out of the right kind of space, and the temporary workaround usually fails when a family member needs a private suite or the city inspector visits. A planned addition solves the problem once and stays solved.
- You’ve called about a permit and gotten a vague answer. Plano’s zoning and setback rules vary block by block, and a neighbor’s failed project isn’t a reliable guide to your own. If you’ve been told “we’ll figure it out later,” that’s the point to get a written scope and a permit path in hand before money moves.
- The lot is tight and you’re weighing a second story versus a rear build. On smaller Plano lots, the setback line leaves very little room to build out, so the second-story option usually wins on square footage. The trade-off is structural – and that decision should be made with an engineer’s read, not a hunch.
- An aging parent needs a ground-floor suite. When the plan is for a family member to move in, a junior ADU or interior conversion gets the privacy and egress right without the cost of a new structure. It’s the calmest answer when the goal is proximity with a door in between.
- The garage is a storage shed and you’re paying the mortgage on it. A garage conversion ADU turns that parked square footage into a rental unit or a suite, and it’s the lowest-cost route to an ADU on most lots. The structural work to code it properly is real, but so is the return.
Our Home Additions & ADU Process – Step by Step
Every project follows the same five steps, in the same order, with the paperwork to match. The order is the point.
- 1
Free estimate and site visit. We walk the lot or the existing structure, measure setbacks, and note the soil and grade conditions. You leave with a written price range and a scope of work in hand, and a written flat price before any work begins.
- 2
Design and permit drawings. We prepare permit-ready drawings that reflect the survey and the zoning check for your specific Plano address. Plano reviews zoning, impervious cover, and utility connections as separate steps, so we submit in the order the city wants them and track each response.
- 3
Signed scope and change-order rules. The flat written price covers a defined scope, and any change to it needs a signed change order first. That rule is why our projects finish within a few percent of the agreed cost – no work proceeds on a change until the paperwork is signed.
- 4
Construction with a documented photo record. Crews are background-checked and uniformed, and every visit ends with photographs of the work and the conditions found. The record is included as a standard deliverable on every job, not an upgrade, so you can see the framing, the mechanicals, and the tie-in points as they happen.
- 5
Final walkthrough and the 365-Day Done Right Promise. We walk the finished space together, hand over the written warranty and the full photo record, and stand behind it. If something isn’t done right within a year, we make it right.
See the difference
Before
After
Before
After
Before
AfterHow Much Does Home Additions & ADU Cost in Plano?

Home additions and ADUs in Plano run $45,000 – $130,000, with a typical single-room addition on the lower end and a detached ADU pushing toward the top of that range or beyond. The scenarios break down this way: a garage conversion ADU runs $30,000 – $80,000, a room addition runs $45,000 – $130,000, and a full detached ADU or major addition can reach $90,000 – $220,000 depending on size, finishes, and site work. A second-story addition typically sits in the upper portion of the room-addition range because the structural work comes first.
What moves the price is the site conditions (Plano’s expansive clay soil and required drainage work), the utility runs, the permit path, and the finish level. The way to avoid overpaying is to get the utility connections and permits priced as separate line items up front rather than folded into a vague allowance. Our free estimate includes a written line-item scope, the permit path, and the materials named. If you bring a competitor’s written quote, we’ll review it line by line at no charge – that’s a standing offer on any written estimate.
The table below gives the working range for each type, so you can compare against a quote from another contractor.
- Garage conversion ADU: $30,000 – $80,000 – footprint exists, structural and mechanical code work still required.
- Room addition: $45,000 – $130,000 – primary suite, expanded kitchen, or family room addition.
- Junior ADU or interior conversion: usually within the room-addition range, lower when existing square footage is reworked.
- Detached ADU: $90,000 – $220,000 – full new structure, separate utilities, and finishes.
Call (844) 761-8346 for an exact flat-price quote – estimates are free.
Home Additions & ADU Near Plano – Our Service Area
We build additions and ADUs throughout Plano and the surrounding communities, including Home Additions & ADU in Richardson, Home Additions & ADU in Allen, Murphy, Fairview, Lucas, Sachse, McKinney, Garland, Wylie, Rowlett, and Princeton. Each city reviews permits differently, so we check the local zoning rules before we quote. Most projects start with a free on-site estimate within the week you call.
Serving Plano, TX – Our Local Coverage Area
We serve Plano and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked Questions – Home Additions & ADU in Plano

A home addition extends your existing house, while an ADU is a self-contained living unit on the same lot, separate or carved out of the existing structure. Both add square footage, but an ADU includes its own kitchen, bath, and entry, and it’s held to different zoning standards by the City of Plano. The right choice depends on your lot, your setbacks, and whether the goal is family space or a rental unit. Call (844) 761-8346 for a free estimate.
A garage conversion ADU typically takes several months from signed scope to final walkthrough, while a detached ADU or second-story addition runs longer because of the foundation, structural, and utility work. The permitting stage is often the biggest variable in Plano, since zoning, impervious cover, and utility reviews are handled as separate steps. We give a written schedule range with the quote and track permit responses so the timeline doesn’t drift. Call (844) 761-8346 to schedule your free estimate.
Home additions and ADUs in Plano run $45,000 – $130,000, a garage conversion ADU runs $30,000 – $80,000, and a detached ADU or major addition can reach $90,000 – $220,000. The price moves with the site conditions, the utility runs, the permit path, and the finish level. Call (844) 761-8346 for an exact quote – estimates are free and the price is written before any work starts.
Yes. We build paver courtyards and walkways with Belgard and we install ActiveYards fence systems around new units and yards, and we service both brands with the same attention to the base and the interlock. If your project calls for a different brand, we’ll name the material in the written scope regardless. Call (844) 761-8346 and we’ll review the material choices at your free estimate.
No. Additions and ADUs are planned construction, not emergency work, so there’s no same-day promise attached. What we do offer is a live person answering the phone around the clock, so you can call at any hour and set up your free estimate. Call (844) 761-8346 whenever it’s convenient.
Every project is backed by our 365-Day Done Right Promise: if it isn’t done right within a year, we make it right, and the guarantee is printed on every page and backed by a terms page rather than an asterisk. The written warranty is handed over at the final walkthrough, along with the full photo record of the work. Call (844) 761-8346 to review the warranty terms at your estimate.
Start by gathering your survey, any prior permits on the house, and a clear idea of what the new space needs to do – a rental unit, a suite for a parent, or a family room. Clear access to the rear yard and the utility areas helps, and pulling the measure of your lot and setbacks saves a step at design. We handle the permit path and the documentation from there. Call (844) 761-8346 to schedule your free estimate.
Schedule Your Home Additions & ADU Service in Plano Today
A planned addition or ADU starts with a number in writing, not a handshake. Call Rowan Construction Group at (844) 761-8346 for a free, no-obligation estimate – a live person answers around the clock, the price is flat and written before any work begins, and every visit ends with a photo record. Bring a competitor’s quote if you have one and we’ll review it line by line at no charge. You can also start at our home page to see the full range of trades we cover.
Written by the team at Rowan Construction Group.












